Árpád Bridge or Árpád híd is a bridge in Budapest, Hungary, connecting northern Buda and Pest across the Danube. Until the inauguration of Megyeri Bridge in 2008, it was the longest bridge in Hungary, spanning about 2 km with the sections leading up to the bridge, and 928 m without them. It is 35.3 m wide with pedestrian and bicycle paths and a tramline. At its Óbuda end is Flórián tér, Szentlélek tér. Margaret Island is connected to Árpád Bridge through an embranchment approximately in the middle of the bridge, and crosses the Southern tip of Óbuda Island as well, although there is no road, pedestrian or any other connection whatsoever between the two. At the Pest end, the adjoining Line 3metro station was called "Árpád híd" until 31 January 2020.
Construction and expansion
From the History
In earlier times there was a bridge in the same area established by the Romans, it was connecting a fort and the old Roman settlement of Aquincum. There was a plan at the beginning of the 19th century, to create a new bridge named Árpád, however the tender was announced only in 1929.
The original bridge
Construction began in 1939 by the plans of János Kossalka. It was planned to be named "Árpád Bridge" after Grand Prince Árpád, the second Grand Prince of the Magyars. Due to World War II, the bridge was finished only after the war in 1950. Because of the communist regime then ruling Hungary, the bridge was opened as Stalin Bridge. The final construction works were directed by Károly Széchy and Pál Sávoly. Although the pillars were built in their current dimensions, the original bridge contained only a 2x1 lane road, railroad tracks with pedestrian paths. This bridge was 13 m wide, 11 meters of this was the road and the tracks, and an additional 1 m wide pedestrian path were on each sides. Today the tram tracks are where the original bridge was situated. The name was changed back to Árpád Bridge in 1958.
Expansion
Between 1980 and 1984, by extensive reconstruction and expansion works, two more lanes were added for cars, the pedestrian pathways were widened, the tram track was modernized and overpasses were built for the intersections at both Eastern and Western ends of Árpád Bridge. This was planned and executed in connection with the expansion of the adjacent Róbert Károly körút to 2x3 lanes and double tramway tracks. The project was called Hungária körgyűrű, although the last third of the belt was finished only around the millennium, years after the completion of Lágymányosi Bridge at the other end of the planned beltway.