60th Street Tunnel


The 60th Street Tunnel carries the of the New York City Subway under the East River and Roosevelt Island between Manhattan and Queens.

History

Construction and opening

The tunnel was built as part of the Dual Contracts, which expanded the current New York City Subway system greatly. The original plan provided for trackage over the Queensboro Bridge, which spans the East River from about 59th Street in Manhattan to Queens Plaza in Queens. However, an investigation made following the 1907 collapse of the Quebec Bridge determined that the bridge would not be able to handle the additional weight of subway trains; thus, the tunnel was constructed to the north. Clifford Milburn Holland served as the engineer-in-charge.
The tunnel opened to revenue service on Sunday, August 1, 1920, at 2 a.m. with a holiday schedule, along with the Montague Street Tunnel and the rest of the BMT Broadway Line. Regular service began the following day. The two new tunnels allowed passengers to make an trip from Coney Island, through Manhattan, to Queens for a 5 cent fare. The original construction cost was $5,617,008.97.

Later years

Originally, the tunnel only connected the BMT Broadway Line to the Queensboro Plaza station, where trains terminated, and passengers could transfer to elevated trains to continue along either the BMT Astoria Line or the IRT Flushing Line. After 1949, service patterns were changed so that all BMT trains ran over the Astoria Line and all IRT trains on the Flushing Line. Before that change, the platform edges had to be shaved back to fit the wider BMT subway trains. In 1955, the 60th Street Tunnel Connection opened, allowing Broadway trains to connect to the local tracks of the IND Queens Boulevard Line at Queens Plaza. This track connection is currently utilized by the train; the trains continue to use the connection to Queensboro Plaza.
In 1983, as part of the MTA's first Capital Program, it was announced that work was required to keep the 60th Street Tunnel in a state of good repair. Work on the $34 million project started in November 1990. On July 27, 1992, N and R trains began running through the tunnel at normal speed ( after two years of work. During the project, trains went through the tunnel at, and weekend and late night service was shut down. Ridership decreased from 225,000 to 160,000 daily riders. The tunnel remained closed during late nights for another year so that ventilation and water control improvements could be made.