A8 (Croatia)
The A8 motorway is a toll motorway in Croatia. It connects the A7 motorway near Rijeka with the road network in the Istrian peninsula via the Učka Tunnel. The road terminates at the Kanfanar interchange with the A9 motorway, which with the A8 motorway forms the Istrian Y road system. The motorway's national significance is reflected in its positive economic impact on the cities and towns it connects, as well as its importance to tourism in Croatia. The importance of the motorway for tourism is particularly high during the summer, when its traffic volume increases by about 65%.
The construction of the A8 motorway and the Istrian Y can be traced back to 1968 when the Croatian Parliament decided to build a modern road linking Istria with the rest of Croatia. Subsequently, a bond to fund the construction was issued. The construction work started in 1976; in 1981 the Učka Tunnel was finished and a section of the route between Matulji and Lupoglav was completed as a single-carriageway, two-lane expressway. The Lupoglav-Cerovlje portion was the next one to be completed, in 1988. The route was extended to the Rogovići interchange between 1992 and 1998, and the remaining section to Kanfanar was completed in 1999 as a two-lane road. In 2011, the expressway route started to be expanded gradually with the addition of a new carriageway and emergency lanes, eventually making most of it a controlled-access highway; the expansion of the route's first section, between Kanfanar and Rogovići, was completed in October 2011. The route's full expansion to motorway standards – including six lanes and grade separation of all its interchanges – is scheduled by 2015, when a second tube for the Učka Tunnel and a new route connecting the tunnel to the A7 motorway are planned. Construction slowed in the 1990s due to a lack of funding; therefore, a build-operate-transfer concession for the Istrian Y was granted to the BINA Istra corporation for a period of 32 years.
All intersections found along the route are grade separated, except for a single at-grade intersection currently regulated by traffic lights; a new route is planned to bypass this intersection. As of June 2012, there were ten exits and two service areas along the route. The motorway is currently toll-free except for the Učka Tunnel and the Kanfanar-Rogovići section. However, most of the motorway is potentially a toll road using a ticket system, with each exit including a toll plaza except those of Veprinac, Opatija, and Matulji. The toll system of the A8/A9 Istrian Y is integrated: no ticket needs to be turned in, gotten, or exchanged when going from the A8 to the A9 or vice versa.
Route description
The A8 motorway is an east–west motorway in Croatia, crossing the eastern and central parts of Istria. It connects the Matulji interchange near Rijeka, the largest city on the northern Adriatic coast of Croatia, to Istria via the Kanfanar interchange situated in the area of the city of Rovinj. The motorway represents a link between the A7 and the A9 motorway—spanning between border of Slovenia and the cities of Rijeka and Pula, respectively. This part of the road network of Croatia is also part of European route E751, consisting of the Koper–Kanfanar–Pula and Kanfanar–Rijeka sections. The route is economically important to Croatia, especially for tourism and as a cargo transport route. The road carries significant cargo and tourist traffic as the largest-capacity road link between the Istrian and Kvarner Gulf regions and the nation's capital, Zagreb. Most of the road has a design speed of ; the part meeting full motorway standards has a design speed of. The final segment of the route – between the Učka tunnel and the Matulji interchange – has a design speed of because of the mountainous terrain crossed and proximity of residential structures.The route originates in the Kanfanar interchange with the A9 motorway and the D303 road in central Istria, east of Rovinj. From that point, the A8 proceeds east towards the Žminj exit; there it turns north towards the Rogovići interchange with the D48 road. The latter represents the western approach to Pazin, the capital of Istria County. The A8 section between Kanfanar and Rogovići consists of four traffic lanes with a central reservation. Beyond the Rogovići interchange, the A8 changes direction once again, running generally to the northeast; it acts as a bypass around Pazin. It goes through rough karst terrain that requires three major bridges with a total length of ; the longest bridge is the Drazej viaduct, at. The road then heads toward Cerovlje, running along and near the Pazinčica river valley and the Cerovlje valley; this includes a bridge over the Pazinčica river. After Cerovlje the road runs for, through hilly terrain requiring bridges for about 10% of the route, to the Lupoglav exit and an interchange with the D44 road. Past Lupoglav, after going over the Lupoglav–Raša railway line the A8 heads southeast, until it reaches the D500 road at the Vranja exit and the western entrance to the Učka Tunnel; this is the third-longest road tunnel in Croatia. The tunnel carries the route east, through part of the Učka mountain range. It represents the end of the easternmost section of the Istrian Y system where a toll is charged; consequently, there are toll plazas adjacent to both tunnel entrances. East of the tunnel, the route runs northeast to the Matulji interchange with the A7 motorway and the eastern terminus of the A8 motorway. This section contains the Opatija and Veprinac exits, serving Opatija, Ičići, Lovran and other Opatija Riviera resorts. The elevation of the route's segment east of the tunnel drops from above sea level at the eastern portal of the Učka Tunnel to approximately above sea level adjacent to the Matulji interchange. An additional climbing lane is present along parts of this segment. Unlike all the other exits found along the route, the Opatija exit is an at-grade intersection regulated by a traffic light, while the Veprinac exit is executed as a partial cloverleaf interchange. Overall, the A8 is long with 10 exits along the route. A significant portion of the route has no emergency lanes as yet, but lay-bys are available intermittently along the route. The traffic lanes' width varies along the route, being wide in all sections except between Cerovlje and Lupoglav, where the traffic lanes are wide.
The bulk of the route runs through forested areas, especially near the Učka range and near Pazin, with agricultural land in between those areas – most of it located between the Ivoli and Lupoglav interchanges. The final section of the route, near Opatija and the A7 motorway, runs through coastal areas affected by urbanization. The route crosses no major watercourses, although creeks adjacent to or spanned by the route drain into the Pazinčica and Boljunčica rivers, or directly into the Adriatic Sea in the case of watercourses flowing down Učka's eastern slopes. The Učka Tunnel contains a spring discovered during its construction and used for the water supply of Opatija ever since.
The route runs through an area subject to significant air temperature variations. The temperature extremes measured in the area of the route range from, imposing substantial maintenance requirements. The weather patterns prevailing along the route include: an average of three to four days of snow cover, especially in the central parts of Istria; high winds and gales east of the Učka Tunnel, recorded during, respectively, 15 and 54 days per year on average; and fog in the areas west of the Učka mountains and around Pazin, respectively occurring 80 and 50 days per year on average.
An automatic traffic monitoring and guidance system is installed along the motorway. It consists of measuring, control, and signalling devices located in zones where driving conditions may vary, such as at the interchanges, viaducts, bridges, and zones where fog or strong wind are known to occur. The system uses variable-message signs to communicate changing driving conditions, possible restrictions, and other information to motorway users. In the Učka Tunnel there are 83 security cameras, 538 fire detectors, 39 fire hydrants, 74 emergency stations, and five vehicle emergency lay-bys; the speed limit is.
Tolls
The A8 is a toll road based on the Croatian vehicle classification using a ticket system—charging for use of the motorway based on distance travelled. The system was introduced as a unified toll charge system throughout the Istrian Y motorways in June 2011. Consequently, vehicles using either the A8 or the A9 or switching between the two at the Kanfanar interchange are charged a toll only when they leave the Istrian Y system, no matter where their toll ticket was issued. Along the A8 motorway, a toll is charged only for using the Učka Tunnel and the Kanfanar–Rogovići section; the remaining sections of the motorway are toll-free as of June 2012. Despite this, toll tickets are issued and collected at all exits with toll plazas. For instance, vehicles traveling between Rogovići and Vranja interchanges are issued toll tickets and are required to stop at toll plazas when entering and leaving the A8, but they are not charged for using the route. The toll charge for travelling the entire length of the motorway ranges from 36.00 kuna for passenger cars to 205.00 kuna for semi-trailer trucks. The toll can be paid in either Croatian kuna or euros using major credit cards, debit cards and several prepaid toll collection systems, including various types of smart cards issued by the motorway operator and ENC; the last is an electronic toll collection system that is shared between all motorways in Croatia except the A2, providing drivers with discounted toll rates and dedicated lanes at toll plazas.In 2010, BINA Istra collected €38 million in revenues while its expenditure reached €230 million. In the first half of 2011, however, BINA Istra reported 65.8 million kuna of income in the first half of 2011, without VAT. This income represented a 30.8 percent increase compared to the same period in the previous year. Most of this increase is attributed to the introduction of a closed toll system along the routes, replacing an open toll system in which a toll was charged only at the Mirna Bridge and the Učka Tunnel. In 1999, the Croatian government negotiated amendments to the BINA Istra concession contract. These amendments allow the government to determine tolls along the A8 and A9 motorways, and the government decided to eliminate tolls on traffic flowing along the two-lane sections of the routes; to compensate for this loss of income, the government subsidizes BINA Istra – for instance, in 2012 it is expected to receive a 165 million kuna subsidy. By the end of 2010, the subsidy paid to BINA Istra reached a total of 1.3 billion kuna ; at the time, it was estimated that a further sum of 1.9 billion kuna may be paid in annual subsidies between 2011 and 2027, when the concession contract expires. BINA Istra estimates the total investment value of the construction it has carried out or planned on the A8 and A9 routes at one billion euros.
History
The construction of the A8 motorway has its origin in 1968, when the Croatian Parliament endorsed a petition by Istrian legislators for the construction of a modern road between the peninsula and the rest of Croatia. Subsequently, Istrian municipalities started a public bond to fund the construction of the Učka Tunnel. This construction happened between 1976 and 1981, including the construction of a route section between Matulji and Lupoglav.The Y shape formed by the A8 and the A9 routes was originally defined by highway planning documents decided upon in Rijeka and Istria, subsequently incorporated in highway planning documents of the Republic of Croatia in 1988. Lupoglav–Cerovlje was the next section to be completed, in 1988. The A8 route was extended to the Rogovići interchange between 1992 and 1998 and the remaining section to Kanfanar was completed in 1999.
As the construction was comparatively slow due to a lack of funding, a motorway concession for the A8 and A9 motorways was granted to BINA Istra for a period of 32 years. The build-operate-transfer concession agreement mandated construction, maintenance and management of the route and its upgrade to motorway standards; this requirement included the building of dual carriageways when the annual average daily traffic reached 10,000 vehicles per day or when the average summer daily traffic reached 16,000 vehicles per day. The latter was achieved in 2005 and the motorway upgrade started in 2008, even though the AADT at the time was only 8,500 vehicles. The A8 expansion was commenced by the operator, BINA Istra, immediately following a similar expansion of the A9; on the latter, the entire route was widened except for the two largest bridges, for which the expansion was postponed. The expansion of the A8 was initially limited to the Kanfanar–Rogovići section because the remainder of the route required additional permits and consequently an extended preparation period. On 29 October 2011, the Kanfanar–Rogovići section was upgraded to motorway standards, including four traffic lanes, and the route's designation changed from B8 to A8. The construction performed along the section entailed deep and long cuts requiring temporary traffic stoppages due to explosive blasting.
Future
The government of Croatia and BINA Istra have agreed on a further expansion of the A8 route; additional carriageway and emergency lanes will be constructed between the Rogovići and Matulji interchanges, including the second Učka Tunnel tube., this construction was scheduled to finish by late 2014 or early 2015. The section is expected to cost million euros. As of October 2011, it was in the design development stage, while appropriate permits were expected to be issued in the summer of 2012. In 2003, the government also proposed to build a new route between the Učka Tunnel and the Matulji interchange in order to bypass the Opatija exit with its at-grade intersection, the only one of the route; the changes would also limit the longitudinal grade of the route to 4.9% and increase the design speed to. The new route is planned to intersect with the A7 motorway west of the Matulji interchange, in a proposed Matulji 2 interchange, with additional interchange planned between Veprinac and the new terminus. The existing Veprinac interchange is scheduled for reconstruction for an additional carriageway. The new section is expected to be long; it will be part of the Rijeka transport hub, aimed at improving the road, rail and sea transport facilities in and around Rijeka.Traffic volume
Traffic levels are regularly determined and reported by BINA Istra, operator of the motorway, and published by Hrvatske ceste. In 2010 the traffic volume was only measured in two sections: in the Učka Tunnel and between Lupoglav and Cerovlje. In 2011, traffic counting was started in each section of the A8 between Kanfanar interchange and the Učka Tunnel using the toll ticket counts. As of June 2012, only the figures for 2011 have been published. The largest volume was recorded in the Učka Tunnel; it represents the only high-performance link between Istria and the rest of the Croatian motorway network.The differences between the AADT and ASDT traffic volumes in 2010 are attributed to the motorway's carriage of substantial tourist traffic to the Adriatic Sea resorts along the Istrian peninsula. On average, the A8 motorway's ASDT is at least 65% more than the AADT. The largest increase of the ASDT relative to the AADT, 68%, is observed in the Veprinac–Vranja section. During the summer of 2007, an ASDT of 14,000 was observed in the tunnel, prompting BINA Istra to consider preparing to construct the second tunnel tube. BINA Istra expects the motorways it manages to carry more than 20,000 vehicles per day during the peak periods.
Exit list
Service areas
As of June 2012, there were two service areas along the A8 route. Croatian legislation identifies four types of service areas designated "A" through "D": Type A service areas have a full range of amenities, including a filling station, a restaurant and a hotel or motel; Type B service areas lack lodgings but are otherwise identical to Type A; Type C service areas, which are very common, include a filling station and a café, but no restaurants or accommodations; and Type D service areas only offer parking spaces, restrooms, and possibly picnicking tables and benches. The service area filling stations frequently have small convenience stores, and some of them offer LPG fuel.BINA Istra, the primary operator of the route, leases the type A, B, and C service areas to various operators through public tenders. As of September 2011, INA was the rest-area operator on the A8 and the A9 motorways. The service area operators are not permitted to sublease the fuel operations, but can sublease other parts of the service areas. The A8's service areas are accessible from both sides of the motorway and operate 24 hours a day, 7 days a week.