Ashton's main building and grounds began as Dunstable Grammar School, founded by Frances Ashton in 1728 and built in 1887. It officially took on its middle school name and status in 1973. Bedfordshire changed from a two-tier school system to a three-tier system in 1972, the concept of middle schools originally being mooted in the 1967 Plowden Report. It is now one of fewer than 200 middle schools in England. In August 2014 Central Bedfordshire Council made the decision to close Ashton Middle School in 2016. The council claims that falling pupil numbers are making the school financially unviable, however the Church of EnglandDiocese of St Albans is currently consulting on whether to appeal the closure. The closure of the school is part of a reorganisation of schooling in Dunstable which is expected to ultimately lead to closure of three middle schools in the area. However the school closed at the end of the Summer term in 2016.
Facilities
The school had five buildings, the "A" block being the largest and oldest, situated parallel to Watling Street, mainly used for maths and French lessons and secretary duties. It also housed a matrons office, a library, the main hall and school chapel. The "B" block was primarily for the new intake form classes. The "C" block was multipurpose but included science labs and design-technology rooms. The "D" block was used for history, geography and music teaching; and the "E" block contained lockers and storage. Other facilities included an astroturf pitch, PE block with an indoor gym, and a ball courtfor the children.
School houses
The school had a house system named after four English cathedrals.
House
Colours
Ely
Wells
York
Lincoln
Competition between the houses included a sports day, swimming gala and merit marks, and football, hockey, cricket, rugby, tag rugby and athletics. The school garden was rebuilt as a memorial to a former year 8 student, Hayley Spokes.
A section 5 Ofsted inspection was carried out and the report published on 16 March 2011. In the report the school was deemed "inadequate" by education watchdog Ofsted. The report stated "Significant improvement is required in relation to the progress of pupils with special educational needs and/or disabilities, and the use of assessment to provide individual pupils with appropriate guidance, challenge and support." The Ofsted inspection of March 2012 found the school to be "satisfactory and improving, with good features".
Closure
It was announced in 2014 that three local schools were to close. Ashton Middle School being one of the three. In that time school pupil numbers diminished to less than a class full during its final days. Ashton Middle School officially closed its doors and ceased to be a school on 31 August 2016. The site is now called "Ashton Grove".
Future of Ashton
The site of Ashton Middle School is now to become a new development of 113 homes and apartments. A large proportion of the site has already been demolished these areas are C Block, B Block, Boiler house and swimming pool changing areas.