Back Bay station
Back Bay Station is an intermodal passenger station in Boston, Massachusetts. It is located just south of Copley Square in Boston's Back Bay and South End neighborhoods, it serves MBTA Commuter Rail and MBTA subway routes, and also serves as a secondary Amtrak intercity rail station for Boston. The present building, designed by Kallmann McKinnell & Wood, opened in 1987. It replaced the New Haven Railroad's older Back Bay station - which opened in 1928 as a replacement for an 1899-built station - as well as the New York Central's Huntington Avenue and Trinity Place stations which had been demolished in 1964.
Although South Station is Boston's primary rail hub, Back Bay maintains high traffic levels due to its location in the Back Bay neighborhood near the Prudential Center development and its access to important Northeast Corridor services. All Amtrak Acela Express and Northeast Regional trains running to and from South Station stop at Back Bay, as does the Boston section of the Lake Shore Limited. Four MBTA Commuter Rail routes - the Providence/Stoughton Line, Franklin Line, Needham Line, and Framingham/Worcester Line - also stop at Back Bay, as do the Orange Line subway and several local MBTA bus routes. It is the third-busiest MBTA Commuter Rail station and the fifth-busiest MBTA subway station.
History
The Boston and Worcester Railroad opened from downtown Boston to Newton in 1834, and to Worcester within the next several years. The Boston and Providence Railroad opened from Park Square to East Providence later that year. The two lines crossed on causeways in the Back Bay, then still used as a mill pond. Around 1880, the Boston and Albany Railroad opened its Columbus Avenue station to serve new developments on the filled bay. In 1897, the New Haven Railroad, the New York and New England Railroad, and the Boston and Albany formed the Boston Terminal Company to consolidate their four terminals into a new union station.Simultaneous with the construction of the resulting South Station in 1899, the New Haven also built its first Back Bay Station just east of Dartmouth Street to compete with the B&A's Columbus Avenue station. The next year, the B&A replaced Columbus Avenue station with the westbound-only Trinity Place and eastbound-only Huntington Avenue stations.
The current Back Bay Station opened on May 4, 1987, as part of the Orange Line's Southwest Corridor project and was dedicated by Governor Michael Dukakis. It replaced the 1899-built and 1929-rebuilt ex-New York, New Haven and Hartford Railroad station of the same name, of which some remnants can still be found at the eastern end of the present station facilities, including a carved stone embedded in the brick wall on the east side of Columbus Avenue. The reopened station had South End as a secondary name, approved in 1985 as part of a series of station name changes.
The 1987 reconstruction added a waiting area with a 9-foot bronze statue dedicated to civil rights and labor movement pioneer A. Philip Randolph. The area includes various posters with historical photographs and interview excerpts regarding Randolph's career in organizing the Brotherhood of Sleeping Car Porters and work with the Civil Rights Movement.
On September 22, 2006, the MBTA began allowing free inbound travel from Back Bay to South Station. This change was to allow travel from Back Bay hotels to the Boston Convention and Exhibition Center and Logan International Airport without the need to transfer to the Red Line. Until replaced with the CharlieCard Store at Downtown Crossing on August 13, 2012, an MBTA customer service booth for special pass users was located at Back Bay station.
''Night Owl'' crash
In 1990, a northbound commuter train running along the Providence/Stoughton Line was involved in a collision with a northbound Night Owl train. The accident, which occurred to the west of the Back Bay station, injured 453 people, although there were no fatalities.Air quality
Back Bay station has suffered from poor air quality since its opening; passengers with lung conditions have been advised to avoid the station. Much of the commuter rail infrastructure at Back Bay is covered and enclosed, and so diesel fumes cannot escape quickly to the outside air. A petition drive in 2000 gathered complaints about the then-"longstanding" issue. Studies in 2006 in 2008 showed that "the air was many, many times below air-quality standards" due to trapped diesel exhaust and soot. An earlier study showed elevated levels of carbon monoxide, formaldehyde, particulates, and oxides of nitrogen, though it noted that there is no regulated standard to meet for indoor air quality in public spaces.Though simple changes were made regarding scheduling, and checking to make sure train engines were running properly, in 2008 the MBTA claimed it lacked the financial resources to fully upgrade the ventilation system.
In 2010, the MBTA announced that it had secured $3.0 million in federal stimulus money to improve the ventilation in the lobby. While MBTA spokesman Joe Pesaturo said there was no health threat, a scientist at the Clean Air Task Force, a Boston-based nonprofit pollution research group stated, "Honestly, down on the platform it was some of the worst air quality I've measured." Additionally passengers and clerks working in the station have complained. The MBTA said then that it would complete an improved ventilation system by 2012.
On October 8, 2014, Amtrak removed its customer service and ticketing agents from the station due to the persistent air quality issues. Back Bay was to be an unstaffed station "until further notice" as improvements are made. Amtrak personnel returned in 2015, but Amtrak pulled them again effective October 1, 2016.
The station has remained unstaffed since then, though two Quik-Trak kiosks are available. However, baggage cannot be checked at the station. Despite being unstaffed, it remains one of the busiest Amtrak stations in the country. In 2018, it was the fourth-busiest Amtrak station in New England and the 16th-busiest nationwide.
A $10 million ventilation project, funded equally by MassDOT and Boston Properties, was bid in 2016. The work will improve ventilation at the platform level and add "air curtains" to prevent exhaust fumes from reaching the concourse., final designs are due to be submitted in 2020, and the work is expected to take until at least 2022.
Privatization and renovations
In 2014, Boston Properties began negotiating with the state for the right to build an air rights development atop the station and garage parcels, in exchange for managing the station and completing a $25 million renovation. Similar private management schemes were already in place at North Station and South Station, though without the real estate component. An agreement was signed in late 2014, with the renovation budget increased to $32 million. In August 2015, the MBTA began paying Boston Properties a subsidy and agreed to fund some repairs to expansion joints not covered in the original agreement.Boston Properties filed notice with the Boston Redevelopment Authority in December 2015, beginning the permitting process. Plans for the station and development were released in March 2016. The station renovation will include restoration of the original architecture, relocation of the Orange Line entrances, expanded waiting areas in the main concourse, renovated bathrooms, improved ventilation, and new retail spaces surrounding the concourse. The station work was then scheduled to begin in 2017 pending BRA approval., construction is planned to begin in 2019.
Station layout
There are 5 tracks serving Amtrak and commuter rail service. Tracks 2, 1, and 3 serve Amtrak's Acela Express and Northeast Regional plus the MBTA's Providence/Stoughton Line, Franklin Line, and Needham Line. Tracks 5 and 7 on the Framingham/Worcester Line and the Lake Shore Limited serve westbound trains from a separate island platform. Tracks 1 and 2 are considered the primary mainline tracks; the track numbering scheme used in the Boston area uses only odd numbers for additional tracks on the Track 1 side and even numbers for tracks on the Track 2 side. The Orange Line tracks and platforms lie between these two groups of mainline rail tracks.Back Bay is fully handicapped accessible. The station has full-length high-level platforms on the three Northeast Corridor tracks, and a mini-high platform for the Worcester Line tracks. Elevators are available to access all platforms from the street-level station building.
Because Amtrak's Downeaster trains depart from North Station rather than Back Bay or South Station, Amtrak advises travelers that wish to make a connection via subway to use the Orange Line between Back Bay and North Station, as using South Station would require an additional transfer at Downtown Crossing.
The main station building is located between Dartmouth Street and Clarendon Street; however, there are several additional emergency exits from the Amtrak / commuter rail platforms onto Dartmouth Street, Clarendon Street, and Columbus Avenue. The Dartmouth Street Underpass connects the Copley Place shopping mall with the main station building. The underpass was closed from March 6, 2016 to June 1, 2017 during construction at Copley Place, during which it was given some rudimentary refurbishment.