Barlow Trail


Barlow Trail is a major arterial road in Calgary, Alberta, that is composed of three parts: the southern section which runs from Deerfoot Trail near 130 Avenue SE to Deerfoot Trail at the intersection with Peigan Trail. The afore mentioned section is the central section which runs from 17 Avenue SE to McCall Way; and the northern section which runs from Airport Road to 128 Avenue NE.
The central and northern sections of Barlow Trail is run roughly where the fifth meridian lies in the Dominion Land Survey. The road is named for Noel Barlow, a resident of Carseland, Alberta, Canada, who served as the ground crewman to Douglas Bader, a Royal Air Force flying ace in World War II.

History

Barlow Trail used to be the main northern entrance into the city of Calgary and was a continuous roadway. It served as a portion of Alberta Highway 2 from the northern city limits to Blackfoot Trail, near the present location of the Max Bell Centre. At that point, Highway 2 followed Blackfoot Trail to 66 Avenue SE before turning south on Macleod Trail, while Barlow Trail continued south along 26 Street SE. In the early 1970s, Highway 2 was diverted to the new freeway as part of the Blackfoot Trail Freeway construction, resulting in Barlow Trail becoming a rural road north of 112 Avenue NE and being re-designated as Highway 2A. In the late 1970s, Deerfoot Trail was extended further south, resulting in the direct connection to Blackfoot Trail being removed in favour of using 17 Avenue SE, and Barlow Trail being realigned as part of the construction of the Peigan Trail interchange. As part of the construction, direct movement to 26 Avenue SE was removed in favour of the southern section of Barlow Trail accessing Deerfoot Trail, and subsequent traffic calming removed direct access south of 17 Avenue SE. In the 1980s, the city of Calgary annexed land north of the airport, resulting in the Highway 2A designation being removed.
Barlow Trail was the primary route to the Calgary International Airport until the 2001 completion of Airport Trail, where the primary north-south entrance to the airport was diverted to the Airport Trail via the Deerfoot Trail. Barlow Trail functioned as an alternate route to the airport until April 3, 2011, where the section of Barlow Trail between 48 Avenue NE and Airport Road was permanently closed in order to provide space for a new runway. In the late 2000s, as part of the construction of the northeast portion of Stoney Trail, access to Rocky View County was closed.

Future

The section of Barlow Trail north of Country Hills Boulevard is being reconstructed and realigned as part of the Stonegate Landing business park development. Barlow Trail will be upgraded to an arterial road to 128 Avenue NE, and continue north as Barlow Crescent, where it will circle back to 128 Avenue NE and continue south as 36 Street NE.

Major intersections