The Barrow Offshore Wind Farm is a 30 turbine 90MW capacity offshore wind farm in the East Irish Sea approximately south west of Walney Island, near Barrow-in-Furness, Cumbria, England.
Construction of the wind farm took place between 2005 and 2006. The farm is operated by Barrow Offshore Wind Limited, owned by Ørsted A/S.

Planning and design

Barrow wind farm was a UK Round 1 wind farm development originally developed by Warwick Energy Limited. A planning application was submitted in 2001, and planning consent given in March 2003; the project was sold to Centrica, Ørsted A/S , and Statkraft in Sep. 2003. The estimated cost of developing the project was £100million, of which £10million was provided by a UK government grant. In 2004 Centrica and Ørsted bought the Statkraft stake, forming a 50:50 joint venture in the development.
The initial Warwick Energy proposal was for a 30 turbine wind farm 7 km southwest of Walney Island, with a generating capacity of up to 108MW; electrical power supply to the mainland was to be via a ~25 km long 132kV cable making groundfall near Heysham, with connection to the mainland electrical grid at an extension to an existing electricity substation south of Heysham nuclear power station. Turbines were expected to have ~50m radius blades, with a 75m hub height, and be situated in water at a depth of ~20m, with a ~32.5m sub-sea bed monopile foundation; the turbines were to be spaced approximately 500m apart in four rows aligned to face the prevailing southwesterly winds, with a row spacing of ~750m.

Construction

In July 2004 Kellogg Brown & Root Ltd and Vestas-Celtic Wind Technology Ltd were awarded the contract to install and commission the wind farm, and to operate the wind farm for 5 years. A 30 turbine wind farm with a capacity of 90MW was constructed by the consortium between July 2005 and May 2006. The main construction base was at Harland and Wolff's shipyard in Belfast. In exceptions where pile driving of monopile foundations failed, drilling was used to form the monopile foundations.
IEC 1A class Vestas V90-3.0MW wind turbines were used, mounted on a 75m tower connected to monopiles supplied by a Sif/Smulders joint venture. Turbine to offshore substation electric connection were at 33kV, with the voltage stepped up to 132kV at an offshore substation supplied by Areva T&D, Sif/Smulders and designed by KBR and Mott MacDonald. Cables were supplied by Prysmian and Nexans.
Construction of the wind farm was completed in June 2006 with the first power generated in March 2006. The operator is Barrow Offshore Wind Limited, owned by Centrica and Ørsted.

Operation

Since 2008 the farm operated at between 30 and 40% capacity factor, generating between 240 and 320 GWh of electrical energy per year.
In 2011 regulatory changes required Ørsted/Centrica to divest the electrical transmission assets of the wind farm, which were sold to TC Barrow OFTO Ltd. for £34 million.
In 2014 Ørsted acquired Centrica's 50% holding in the wind farm.