The Conwy Valley line was constructed by the London and North Western Railway with the primary aim of transporting dressed slate from the Blaenau Ffestiniog quarries to a specially built quay at Deganwy for export by sea. The original plans envisaged a railhead at Betws-y-Coed and a large goods yard was established with intended interchange to a proposed narrow gauge line via the steeply graded Lledr Valley to Blaenau Ffestiniog. Other entrepreneurs proposed narrow gauge lines from Corwen to Betws-y-Coed, Penmachno to Betws-y-Coed and from Beddgelert to Betws-y-Coed. In the event the line to Blaenau, which was not completed until 1879, was built to standard gauge and the other proposals were abandoned. Extensive passenger and goods facilities were however provided at Betws-y-Coed, where the station, which was opened in 1868, adjoins the London to HolyheadA5 turnpike road and was thus ideally located to serve many isolated communities in Snowdonia and also the rapidly developing tourist industry. In the LMS timetables the station was listed as "Bettws-y-Coed - Station for Capel Curig". There was originally a passing loop with full length up and down platforms. A camping coach was positioned here by the London Midland Region from 1955 to 1959, the coach was replaced in 1960 by a Pullman camping coach which was here until 1970. The loop was removed in the 1960s but the footbridge that previously gave access to the now removed down platform has been retained and provides access to the Conwy Valley Railway Museum, which runs a miniature railway and other attractions in the former goods yard. The comprehensive range of passenger station buildings have been preserved and sympathetically adapted for use as a cafe, coffee shop, holiday apartments and retail outlets. The station now functions as an unstaffed halt. The platform was refurbished and a digital Passenger Information System installed in Spring 2009. Train running information is also provided via telephone and timetable poster boards.
Services
Six trains each way per day call on a regular basis Mon-Sat, with four trains each way on Sundays. Services from this station were suspended following serious flood damage to the track and associated infrastructure resulting from the heavy rainfall associated with Storm Gareth on 16 March 2019. Repairs took several months to complete, with a replacement bus service in operation in the meantime. The line was reopened on 24 July 2019, in time for the staging of the National Eisteddfod in Llanrwst. Further storm damage to the north in February 2020 has once again seen services suspended, with buses replacing trains from here until September 2020.
Village and surrounding area
Betws-y-Coed is an important tourist village and the station is centrally located beside the large village green. The district has magnificent scenery and there are several spectacular waterfalls, including the much visited Swallow Falls, which are served by frequent Sherpa buses from Betws-y-Coed station. There are several large hotels in the village.