Bhagalpur Junction railway station,, is a railway station serving the city of Bhagalpur in the Bhagalpur district in the Indian state of Bihar.
History
Bhagalpur Junction railway station is connected to most of the major cities in India by the railway network. It lies in the Sahibganj loop which serves Bhagalpur with numerous trains. It is the third busiest line in Bihar. About 100 pairs of Express and 44 pairs of passenger train pass through this line. Bhagalpur Junction is an A1 grade railway station.It is the highest revenue generator in the Malda Rail Division. It is the third major railway station in Eastern Railway after Howrah and Sealdah. Bhagalpur is well connected to,,,,,, Patna,,,,,, Gaya and other cities.
Railway transportation was introduced in India within 30 years of its maiden run in England.
The East Indian Railway Company, formed on 1 June 1845, completed its survey for a railway line from Kolkata, then called Calcutta, to Delhi via Mirzapur in 1846. The company initially became defunct on refusal of government guarantee, which was given in 1849. Thereafter, an agreement was signed between East Indian Railway Company and the East India Company, for the construction and operation of an "experimental" line between Kolkata and Rajmahal, which would later be extended to Delhi via Mirzapur. Construction began in 1851.
On 15 August 1854, the first passenger train in the eastern section was operated from Howrah to Hooghly, away. On 1 February 1855 the first train ran from Hooghly to Raniganj, from Howrah. The priority accorded to the Raniganj section was because of the assurance of coal transportation.
The Khana Junction-Rajmahal section was complete in October 1859, crossing Ajay River on the way. The first train ran from Howrah to Rajmahal via Khana on 4 July 1860. The loop from Khana Junction to Kiul via Jamalpur, including the Monghyr branch, was ready in February 1862.
From Rajmahal, construction progressed rapidly, moving westward along the banks of the Ganges, reaching Bhagalpur in 1861, Munger in February 1862, and opposite Varanasi in December 1862 and then on to Naini on the bank of the Yamuna. The work included EIR's first tunnel at Jamalpur and first major bridge across the Son River at Arrah.
During 1863-64, work progressed rapidly on the Allahabad-Kanpur-Tundla and Aligarh-Ghaziabad sections. The Yamuna bridge near Delhi was completed in 1864 and EIR established the Delhi terminus. The Yamuna bridge at Allahabad opened on 15 August 1865 and in 1866 Kolkata and Delhi were directly linked. The 1 Dn/ 2 Up Mail started running.
With the completion of the long line connecting Raniganj with Kiul in 1871, a "shorter main line" was in position. Initially, it was called the chord line. However, as it attracted more traffic it was designated the main line and the original line became the Sahibganj loop.
After approximately 150 years of operation, Kiul Jn. to Barharwa Jn. Section Including Bhagalpur Jn. of Sahibganj Loop Line is converted in double line on 14-05-2019 except Ratanpur - Jamalpur section.
Bhagalpur is also the originating station for many super-fast and express trains.
Facilities
The major facilities available include free wi-fi across the entire Bhagalpur Junction platforms, waiting rooms, retiring room, a computerised reservation facility, reservation counter, vehicle parking etc. The vehicles are allowed to enter the station premises. There are refreshment rooms vegetarian and non-vegetarian, tea stall, book stall, post and telegraphic office and Government Railway police office. Automatic ticket vending machines have been installed to reduce the queue on the station for train tickets.Platforms
There are six platforms in Bhagalpur Junction. The platforms are interconnected with three footbridges.Escalators
Bhagalpur Junction is among the selected railway stations of India where automated Escalators are installed.Developments
In the Rail Budget 2008, Bhagalpur was announced to be converted to as Railway Division and yet to be implemented by ER.The new rail lines from Sultanganj to Deoghar was announced and the construction yet to start.
Only Ratanpur to Jamalpur Section of the Kuil Jn. to Barharwa Section is still operating on single track.Work of construction of Second Tunnel Near Janalpur is in Progress. Second Tunnel work near Jamalpur is likely to be completed by 2021.
Work for doubling the 111-kilometre long stretch started in 2010.
Work on the new 130-kilometre long Rampurhat-Dumka-Mander Hill broad gauge line completed and Kavi Guru Express BhagalpurJn to howrah is running on this route.
Pirpainti-Godda-hansdiha Nwe Rail Line is under construction and hansdiha-padeyahat Section is opened on 17 September 2019.
Electrification
The Howrah-Gaya-Delhi route was the first trunk route in India to be completely electrified and was electrified on August 5, 1976.The electrification work of Rail Line Between Bonidanga Link Cabin to Kiul Jn.via Barharwa-Sahibganj-Bhagalpur is completed in June 2020.
The electrification of Bonidanga Link Cabin-Barharwa-Sahibganj-Kiul section Including the Tinpahar-Rajmahal section has been started from September 2017 and is yet expected to be completed by the end of March 2020.
Approximately 150 years of Rail operation on Kiul Jn. to Bhagalpur Jn. Section of Sahibganj Loop Rail Line, Vikramshila Exp. became the first train hauled by Electric Locomotive on 02-06-2019. 12368 Down ANVT to BGP Vikranshila Exp. arrived at BGP hauled by Electric Locomotive.Electric Train started from BGP On 03-06-2019. 12367 UP BGP to ANVT Vikramshila Exp. departed from BGP hauled by Electric Locomotive.
Kiul-Bonidanga Section is electrified and Goods Train is started with E-loco from 03-July-2020.On Bhagalpur Sahibgang Section Brahmaputra Mail became first train running with E-loco on 07-07-2020 up to NJP.
Train With Electric-Loco Between Barharwa-Sahibganj Section started on 30-09-2019.
The electrification work of Rail Line Between Bhagalpur to Deoghar has been started and likely to be completed by 2022.
Work of Electrification from Jamalpur to Sabdalpur via Mungher is completed.
Jamalpur Workshop
Jamalpur Workshop on Kiul Jn. - Bhagalpur Jn. Section, the first full-fledged railway workshop facility in India, was opened on 8 February 1862, at a time when the Howrah-Delhi main line, passing through Jamalpur was under construction. It undertook repairs of wagons, coaches, cranes and tower cars, and locomotives, as well as manufacture of some tower cars, break-down cranes and various kinds of heavy-duty lifting jacks.They also produced their own locomotives, starting with the CA 764 Lady Curzon in 1899. It has also produced ticket printers and other ticket machines. With fairly extensive workshop facilities, it was a fairly self-contained.
Branch lines
Bhagalpur Rampurhat VIA Dumka section is operational.Bhagalpur to Deoghar and Bhagalpur to Jasidih section is operational.
Hansdiha-poreyahat Section is operational.