Birkenhead Bridge
The Birkenhead Bridge is a bascule bridge in Adelaide, Australia that crosses the Port River.
In February 1938, the Government of South Australia awarded a contract to Adelaide Construction to build a bridge across the Port River from the Birkenhead to Port Adelaide with Perry Engineering contracted to supply the steelwork. It was opened on 14 December 1940 by Governor Malcolm Barclay-Harvey. It was one of only four bascule bridges in the world adapted for use by trolleybuses.
In 2014, two of the four road lanes were converted into pedestrian and bike paths. In 2020 the timber road deck is scheduled to be replaced with a fibre reinforced polymer deck and the timber footpath with aluminium.
The bridge is listed on the South Australian Heritage Register.