Blyth Harbour Wind Farm


Blyth Harbour Wind Farm is a coastal wind farm located in East Bedlington along the East Pier of the Port of Blyth.
Commissioned in January 1993 it consists of nine 0.3 MW WindMaster turbines giving a total capacity of 2.7 MW. It was developed by AMEC Wind and is owned by Hainsford Developments Limited.

Repowering

In January 2008 consent was granted to replace the existing nine turbines with seven new ones. Six of these would generate 2.5 MW each, and a seventh larger one would produce 7.58 MW and be the largest land-based turbine in Europe at tall.
As of September 2012, the first new turbine became operational, producing up to 3.4 MW of power. The turbine is a REpower 3.4M104, with a 76 m hub height.