Brandåa Hydroelectric Power Station
The Brandåa Hydroelectric Power Station is a hydroelectric power station in the municipality of Rindal in Møre og Romsdal county, Norway. It is a run-of-river hydro power station utilizing a drop of in some tributaries of the Surna River. Permission was granted for construction in 2006 and the plant came into operation in 2009. It is operated by Svorka Produksjon AS. It operates at an installed capacity of, with an average annual production of about 15.8 GWh.