Brenner Base Tunnel


The Brenner Base Tunnel is a railway tunnel under construction through the base of the Eastern Alps beneath the Brenner Pass. It will run from near Innsbruck, in Austria, to Fortezza, in Italy, replacing part of the current Brenner railway. The line is part of Line 1, the Berlin to Palermo route, of Trans-European Transport Networks.
The Brenner Pass, in the Alps at the border between Austria and Italy, is one of the most important traffic connections between northern and southern Europe, and the motorway going over it is infamous for its frequent traffic jams. Pollution from this traffic is a major concern.
The goal is to relieve this situation by greatly improving the railway connection between North Tyrol and South Tyrol with the new tunnel, which will allow trains to cross the Alps much faster. Currently, speeds in the Brenner region barely exceed due to the steepness of the existing tracks, which cross the pass at an elevation of above sea level.
The travel time from Innsbruck to Bolzano will be reduced from 2 hours to 50 minutes.
The project is funded by Austria and Italy, and a contribution by the European Union. Together with a large part of the existing Innsbruck bypass, the Brenner Base Tunnel will reach a length of 64 km. That would be the longest underground railway connection in the world. The funding promised so far will not suffice for the estimated costs. The tunnel is scheduled to be completed in 2028.

Background

The passenger and freight traffic across the Alps has increased greatly in recent years and further growth is forecast. Austria is a key country in movement of freight between northern and southern Europe and between eastern and western Europe. The Brenner region is very politically sensitive with respect to both local and cross-border transport issues. Between 1970 and 1999, highway freight increased seven-fold.
In 1990, 70% of the freight from eastern Europe was transported by rail and the remainder by trucks. These proportions were expected to reverse by 2010.
About three-quarters of traffic through the Brenner Pass is currently carried by road transport. Local residents have long fought for relief from the associated pollution.
The construction of a rail tunnel is considered by its proponents to be necessary for a shift of freight traffic from road to rail.
The railway line from Innsbruck to Bozen was built between 1860 and 1867. Tight curve radii and gradients of up to 2.6% complicate rail operations. However, improvements on the Italian side in recent years to the existing line, which were completed in late 2008, allow the line theoretically to accommodate 240 trains per day. The grades were not significantly improved.
The new Brenner line would have a maximum gradient of 0.4%-0.7%. Thus, a locomotive would be capable of hauling more than double the weight. The new line would cut travel time between Innsbruck and Bolzano from about two hours today to less than half that.

Project

Main tunnel

The long, twin-tube tunnel begins in the Innsbruck suburb of Wilten and penetrates the Alps reaching a height of about above sea level. The tunnel will be up to below the surface at its deepest point in the gneiss section stretching south from the Italian border. Since under the most recent plan the tunnel starts as a twin-tube tunnel, the junction already prepared in the Inntal tunnel on the Innsbruck bypass will not be used. Instead, a diversion with several branches is planned.
The volume of rock to be excavated during the construction of the tunnel is estimated at, of which approximately 60% will be incurred in Austria, as about 60% of the tunnel will be in Austria. A part of the spoil will be used as fill for the approach lines and another part of the spoil material is used to produce the concrete segment for the final lining of the tunnel. The main tunnels will have a circular cross section with a diameter of approx.
According to current planning the apex of the tunnel will be at the border at an altitude of about ASL, although an apex farther south would have been lower. The placing of the apex at the border is set out in the treaty between Austria and Italy. As justification for this choice it is stated that this will allow Austrian water to run in the tunnel to Austria and Italian water to Italy.

Northern approach

On its north end, the base tunnel has two entrances, which must go underground a few kilometres before the junction with the main tunnels, and will also be built as part of the BBT. One route leads from the main Innsbruck station under Bergisel and the other connects with the Innsbruck bypass. This route adds about more to the length of the tunnel than the Innsbruck station route; with it included, the BBT, at, would become the longest continuous railroad tunnel in the world. However, if the Axentunnel extension is added to the Gotthard Base Tunnel, its length would become, allowing it to reclaim the 'longest tunnel' title.
The northern approach from Munich within Germany is the Grafing–Rosenheim–Kufstein route. The "Brenner Nordzulauf" project aims to construct a high-speed line for speeds of up to 230 km/h between Grafing and Brannenburg in addition to the existing line, adapting the route's capacity to the projected increase as a result of the BBT. The project has reached in-depth planning stages but suffers from lacking support by locals. A more direct route between Munich and Innsbruck, for example, via Garmisch-Partenkirchen, Mittenwald and Seefeld was not pursued, though it could have shortened the Munich Innsbruck line to.
during completion in 2007
In Austria, a new double-track high-speed line supplements the Lower Inn Valley railway between Wörgl and Baumkirchen. It manages to cut travel time between Munich and Innsbruck from 1:50 via the old tracks to merely 0:55 using the high-speed line. About of the line through the Lower Inn Valley is built underground, in troughs, or under snow sheds. Noise and vibration mitigation is accomplished by the use of of elastomer in a mass-spring system. The segment's track superstructure is load class E5. It is capable of handling 260-300 trains per day. This section was opened 2012-12-09. Planning is under way on the continuation of this line to the German border at Brannenburg.
The southern approach for the BBT will be long and reach from the southern portal of the tunnel in Franzensfeste/Fortezza to Verona. Planning has been completed for some sections.

History

The Brenner tunnel is the most important link in the Berlin–Palermo railway axis, a series of projects that will create a single railway line from Berlin in Germany to Palermo in Sicily.

Schedule history

Early in the preliminary planning, at a Brussels meeting in June 2005, BBT SE, presented an interim status report. Expectations following the meeting were that the project could be finalized and the pilot tunnel started by 2006. The target for the tunnel to start service was 2015.
In 2007 a construction time line with a 2022 finish date was specified in a memorandum signed by the Austrian and Italian ministers of transport.

Funding history

On December 2008 Antonio Tajani, the European commissioner for transport, approved funds totalling €1.7 billion to finance 11 railway projects that together should establish two major routes across the continent.
In May 2009 it was confirmed that final go-ahead for the project had been given.
The final estimated cost was put at €8.384bn at 2018 levels.

Construction history

In the summer of 2007 work started on a pilot tunnel to run along the line of the future tunnel and to be used for removing water and spoil during the major construction phase. Construction of the pilot tunnel between 2006 and 2009 was estimated to cost €430 million and would be 50% EU funded.

Design

The final design will consist of two tunnels, long. A centre tunnel below the two primary tunnels will be used during construction as a guide tunnel to determine geological conditions, and later for drainage and emergency access. There will be a cross over between the tunnels every. Multi-function stations will be located at Trens, St. Jodok, and a third station towards the northern end of the tunnel to provide operational and emergency services. ETCS Level 2 will be installed to provide train control.

Specifications