GT3, meaning Gas Turbine number 3, was a prototype mainline gas turbine locomotive built in 1961 by English Electric at their Vulcan Foundry in Newton-le-Willows to investigate the use of its gas turbines in rail traction applications. It was designed by English Electric engineer J. O. P. Hughes in a project that started in the early 1950s. Externally it resembled a steam tender locomotive, although, in the case of GT3, the tender carried kerosene fuel. The designer stated the use of a traditional chassis arrangement and mechanical transmission was to avoid complicating the prototype with relatively untried technologies with regard to bogie assemblies and electrical transmission.
Overview
The National Railway Museum Archives hold the JOP Hughes papers which contain initial concept sketches for various 4-8-4 wheel arrangement single-unit configurations of the machine and early 4-6-0 tender locomotive drawings. These early concept drawings show various names, numbers and liveries, and were drawn with Boxpok-type wheels. The final design was for a 4-6-0 wheel arrangement locomotive with a fuel tender, looking much like a traditional steam locomotive in form. As constructed the locomotive was built with bespoke heavy steel frames which not only bore the auxiliaries, combustion chamber, turbines, heat exchanger and locomotive cab, but also provided adhesive weight for the finished machine. The frames were carried by a leading two axle outside framed bogie and three main axles. The driving wheels were of conventional design in the finished locomotive and were of 5 foot 9 inch diameter with 19 spokes and conventional balance weights. The centre axle mounted a mechanical transmission shaft driven from the turbine assembly, with power to the outer axles being transmitted by side rods. Power came from an English Electric EM27L gas turbine arrangement of with high and low pressure turbines. The low pressure turbine ran continuously in operation and was used to drive the locomotives auxiliaries, with the high pressure turbine operating as higher power outputs were required. Both the locomotive and its fuel tender were vacuum braked, with vacuum brake ejectors being driven by air pressure bled from the turbine. The locomotive's other auxiliaries were shaft and belt driven. The tender was permanently coupled behind the locomotive and contained a Spanner train heating boiler at the leading end and fuel tanks either side of a central corridor with a boiler water tank beneath. A crew toilet compartment and British Standard corridor connection were located at the rear. The six wheel chassis was based on then standard British Railways practice, albeit it with specially made and shaped side frames and bespoke tank and bodywork assembled at Vulcan Foundry. The locomotive had a designed maximum speed of, weighed, and was painted in a lined Beech Leaf Brown Livery, earning it the nickname "The Chocolate Zephyr" amongst railway enthusiasts. Underframes, grilles and the front access and cab doors were painted Brunswick Green with lettering and lining in Orange.
Testing
The locomotive was taken to British Railway's Rugby test centre in an incomplete state for testing on rollers, and then on a short section of specially laid track. After returning to Vulcan Foundry for final assembly, the locomotive was then based at the former locomotive shed at Whitchurch in Shropshire for initial light testing and crew training on the Malpas Line, before commencing loaded test runs to Llandudno. One of these runs was filmed from on board the locomotive by British Movietone News and the resulting film also shows the locomotive being turned on Llandudno Junction turntable. In the event not all of the planned North Wales Coast Line test runs were completed. GT3 then moved to Leicester Shed on the former Great Central Main Line line for testing and crew training between Leicester and Woodford Halse and then Leicester and Marylebone. Leicester was convenient for English Electric’s Whetstone turbine works. During this period it was displayed at Marylebone for the 50th anniversary of the Institute of Locomotive Engineers. The event ran from 11–14 May 1961 and GT3 was filmed by British Pathe being inspected by the Duke of Edinburgh. Later testing was undertaken on the West Coast Main Line from Crewe over Shap summit. On one of these runs O S Nock travelled on board and was able to both witness the locomotive in operation and record its performance, his log of the trip later appearing in Railway Magazine's practice and performance feature for February 1962. Commenting on the testing the designer noted that, despite some of the expected teething troubles and modifications, once it had departed on a test run GT3 had never failed to complete its booked workings. The locomotive was described as being comfortable and easy to handle for the crew, with conversation at normal volumes possible in the fully enclosed cab.
Demise
Despite returning favourable performances on longer runs requiring sustained power outputs, the prototype nature of the locomotive would have required further investigation and development into a configuration which would have matched the convenience of the new double endeddiesel electric locomotives then being built. Neither English Electric or British Railways were prepared to fund this work as at the same time both were already heavily committed to the diesel electric concept, with English Electric in particular fully engaged in manufacturing diesel-electric locomotives of many types. These were rapidly becoming the future of rail traction with ever-increasing power to weight ratios. Upon completion of the Shap test runs GT3 was returned to English Electric at Vulcan Foundry at the end of 1962 and stored. Following internal correspondence in September 1965 the locomotive was partially dismantled and its turbine and heat exchanger equipment removed. It was finally scrapped at Thos W Ward, Salford in February 1966 having been towed there by a BR standard steam locomotive.
Surviving Records
The most complete record of the locomotive is contained in the paper written by its designer in 1962 and in his papers now held at the National Railway Museum Archives in York. Much of what had been written about the locomotive was based on conjecture until these sources became available; subsequently an article in Railway Magazine for December 2015 brought together an accurate and verifiable record of the locomotive. No detailed engineering drawings of the locomotives as built are thought to have survived, the York archive containing an internal memo instructing that these were to be returned to the Gas Turbine division of English Electric when dismantling commenced in 1965. Several articles with drawings have appeared in the railway modelling press since the locomotive was scrapped, but most appear to be based on a contemporary sectional view widely published at the time and are flawed with regard to details such as driving wheels, roof and side access hatches, cab rear, tender front and tender rear. The most accurate drawing appears to have been a contemporary "Skinley" drawing produced with the assistance of JOP Hughes. A copy resides with correspondence between Hughes and Skinley in the JOP Hughes papers at the National Railway Museum. In recent years a 5-inch gauge turbine powered model of the locomotive has been built and exhibited in the UK.