Burshtyn TES
Burshtyn TES is a coal-fired power plant of Zakhidenergo located in Halych Raion south-east from Burshtyn, Ivano-Frankivsk Oblast, Ukraine. It is part of Rinat Akhmetov's holdings.
The plant has two chimneys which were built in 1966 are also used as high-voltage pylon. The plant has 12 units with a total installed capacity of 2,334 MW. It has a 330 kV double-circuit connection to the 750/330 kV substation called ZahidnoUkrainska.
A part of the Ukrainian power grid called as Burshtyn Island works disconnected from the main IPS/UPS network and is synchronized to the synchronous grid of Continental Europe. The power plant holds the frequency and phase angle in the Island. The power plant has a 400 kV connection to the Hungarian grid via the substation at Mukacheve.
History
The Burshtyn TES was built from 1962 to 1969. The plant was built using concrete block technology. The equipments of the plant were manufactured by more than one hundred companies. In 1965, first gas-fired power unit having a total power of 200 MW were finished. In 1969, the twelfth unit was finished and the plant has been launched into service for "Lvivenergo" with a total capacity of 2,300 MW. Among some other power stations of the company were Dobrotvir TES and Rivne Nuclear Power Plant. In 1975, a computer-based monitoring system was installed. From 1978 to 1980, to reduce pollutant emission, electrostatic ash filters were added to the plant. The ash from filters is used by the building industry to produce cement. In 1984, all of the 12 units has been modified to be able to be fired with natural gas. From 1985 to 1990, the power units no. 9 and 10 has been equipped with asynchronous-synchronous turbogenerators type ASTG-200. This helps to reduce reactive power and increase efficiency and stability. From 1995, according to a presidential order, the power plant became an independent organization and part of the power generating open joint-stock company Zakhidenergo that included Dobrotvir TES and Ladyzhyn TES.The Burshtyn Island
From 1 July 2002, the power plant and several substations connected to it have been disconnected from the IPS power system of Ukraine. The plant, with these substations, and customers served by the plant/substations together called "Burshtyn Island". The island contains another power plants, like Klaush TS and T-R Hydro Station, but these plants are synchronized to BuTES, so it holds the synchronization in the island. The island is synchronized and connected to the UCTE grid via the power systems of Hungary and Slovakia. The purpose of the island is to accelerate the integration of the Ukrainian IPS into the ENTSO-E Continental Europe region.Connections of the power plant | - | - |
Voltage | No. of circuits | Destination |
400 kV | 1 | substation 400/220/110 kV Mukacheve |
330 kV | 1 | substation 750/330 kV |
330 kV | 1 | substation 750/330 kV ZahidnoUkrainska |
330 kV | 1 | substation 330/110 kV Ivano-Frankivs'k |
330 kV | 1 | substation 330/110 kV Ternopil |
220 kV | 2 | substation Stryj 220/110/35 kV |
220 kV | 2 | substation Kalush 220/110/35 kV |