CFM International CFM56


The CFM International CFM56 series is a French-American family of high-bypass turbofan aircraft engines made by CFM International, with a thrust range of. CFMI is a 50–50 joint-owned company of Safran Aircraft Engines of France, and GE Aviation of the United States. Both companies are responsible for producing components and each has its own final assembly line. GE produces the high-pressure compressor, combustor, and high-pressure turbine, Safran manufactures the fan, gearbox, exhaust and the low-pressure turbine, and some components are made by Avio of Italy and Honeywell from the US. The engines are assembled by GE in Evendale, Ohio, and by Safran in Villaroche, France. The completed engines are marketed by CFMI. Despite initial export restrictions, it is one of the most common turbofan aircraft engines in the world, in four major variants.
The CFM56 first ran in 1974. By April 1979, the joint venture had not received a single order in five years and was two weeks away from being dissolved. The program was saved when Delta Air Lines, United Airlines, and Flying Tigers chose the CFM56 to re-engine their DC-8s and shortly thereafter it was chosen to re-engine the KC-135 Stratotanker fleet of the U.S. Air Force – still its biggest customer. The first engines entered service in 1982. Several fan blade failure incidents were experienced during the CFM56's early service, including one failure that was a cause of the Kegworth air disaster, and some engine variants experienced problems caused by flight through rain and hail. Both these issues were resolved with engine modifications.

History

Origins

Research into the next generation of commercial jet engines, high-bypass ratio turbofans in the "10-ton" thrust class, began in the late 1960s. Snecma, who had mostly built military engines previously, was the first company to seek entrance into the market by searching for a partner with commercial experience to design and build an engine in this class. They considered Pratt & Whitney, Rolls-Royce, and GE Aviation as potential partners, and after two company executives, Gerhard Neumann from GE and René Ravaud from Snecma, introduced themselves at the 1971 Paris Air Show a decision was made. The two companies saw mutual benefit in the collaboration and met several more times, fleshing out the basics of the joint project.
At the time, Pratt & Whitney dominated the commercial market. GE needed an engine in this market class, and Snecma had previous experience of working with them, collaborating on the production of the CF6-50 turbofan for the Airbus A300. Pratt & Whitney was considering upgrading their JT8D to compete in the same class as the CFM56 as a sole venture, while Rolls-Royce dealt with financial issues that precluded them from starting new projects; this situation caused GE to gain the title of best partner for the program.
A major reason for GE's interest in the collaboration, rather than building a 10-ton engine on their own, was that the Snecma project was the only source of development funds for an engine in this class at this particular time. GE was initially considering only contributing technology from its CF6 engine rather than its much more advanced F101 engine, developed for the B-1 Lancer supersonic bomber. The company was faced with a dilemma when the United States Air Force announced its Advanced Medium STOL Transport project in 1972 which included funding for the development of a 10-ton engine – either to build a "limited" technology 10-ton engine with Snecma, or a similar engine with "advanced" technology on their own. Concerned that the company would be left with only the "limited" engine in its portfolio if it did not win the Air Force contract, GE decided to apply for an export license for the F101 core technology.

Export issues

GE applied for the export license in 1972 as their primary contribution to the 10-ton engine project. The United States Department of State's Office of Munitions Control recommended the rejection of the application on national security grounds; specifically because the core technology was an aspect of a strategic national defense system, it was built with Department of Defense funding, and that exporting the technology to France would limit the number of American workers on the project. The official decision was made in a National Security Decision Memorandum signed by the National Security Advisor Henry Kissinger on 19 September 1972.
While national security concerns were cited as the grounds for rejection, politics played an important role as well. The project, and the export issue associated with it, was considered so important that French President Georges Pompidou appealed directly to U.S. President Richard Nixon in 1971 to approve the deal, and Henry Kissinger brought the issue up with President Pompidou in a 1972 meeting. GE reportedly argued at the highest levels that having half of the market was better than having none of it, which they believed would happen if Snecma pursued the engine on their own without GE's contribution. Nixon administration officials feared that this project could be the beginning of the end of American aerospace leadership.
There was also speculation that the rejection may have been, in part, retaliation for French involvement in convincing the Swiss not to purchase American-made LTV A-7 Corsair II aircraft that had been competing against a French design, the Dassault Milan. In the end, the Swiss did not purchase either aircraft, opting for the Northrop F-5E Tiger II instead.

1973 Nixon–Pompidou meeting

Despite the export license being rejected, both the French and GE continued to push the Nixon Administration for permission to export the F101 technology. Efforts continued throughout the months following the rejection, culminating in the engine becoming an agenda topic during the 1973 meeting of Presidents Nixon and Pompidou in Reykjavík. Discussions at this meeting resulted in an agreement that allowed the development of the CFM56 to proceed. Contemporary reports state that the agreement was based on assurances that the core of the engine, the part that GE was developing from the military F101, would be built in the U.S. and then transported to France in order to protect the sensitive technologies. The joint venture also agreed to pay the U.S. an $80 million royalty fee as repayment for the development money provided by the government for the F101 engine core. Documents declassified in 2007 revealed that a key aspect of the CFM56 export agreement was that the French government agreed not to seek tariffs against American aircraft being imported into Europe.

CFM International

With the export issue settled, GE and Snecma finalized the agreement that formed CFM International, a 50–50 joint company that would be responsible for producing and marketing the 10-ton engine, the CFM56. The venture was officially founded in 1974. The two primary roles for CFMI were to manage the program between GE and Snecma, and to market, sell and service the engine at a single point of contact for the customer. CFMI was made responsible for the day-to-day decision making for the project, while major decisions required the go-ahead from GE and Snecma management.
The CFMI board of directors is currently split evenly between Snecma and GE. There are two vice presidents, one from each company, who support the President of CFMI. The president tends to be drawn from Snecma and sits at CFMI's headquarters near GE in Cincinnati, Ohio.
The work split between the two companies gave GE responsibility for the high-pressure compressor, the combustor, and the high-pressure turbine ; Snecma was responsible for the fan, the low-pressure compressor, and the low-pressure turbine. Snecma was also responsible for the initial airframe integration engineering, mostly involving the nacelle design, and was initially responsible for the gearbox, but shifted that work to GE when it became apparent that it would be more efficient for GE to assemble that component along with their other parts.

Development

Overview

Development work on the CFM56 began before CFMI was formally created. While work proceeded smoothly, the international arrangement led to unique working conditions. For example, both companies had assembly lines, some engines were assembled and tested in the U.S. and others in France. Engines assembled in France were subject to the initially strict export agreement, which meant that GE's core was built in the U.S., then shipped to the Snecma plant in France where it was placed in a locked room into which even the President of Snecma was not allowed. The Snecma components were brought into the room, GE employees mounted them to the core, and then the assembled engine was taken out to be finished.
The first completed CFM56 engine first ran at GE in June 1974 with the second running in October 1974. The second engine was then shipped to France and first ran there on 13 December 1974. These first engines were considered "production hardware" as opposed to test examples and were designated as the CFM56-2, the first variant of the CFM56.
The engine flew for the first time in February 1977 when it replaced one of the four Pratt & Whitney JT8D engines on the McDonnell Douglas YC-15, an entrant in the Air Force's Advanced Medium STOL Transport competition. Soon after, the second CFM56 was mounted on a Sud Aviation Caravelle at the Snecma flight test center in France. This engine had a slightly different configuration with a long bypass duct and mixed exhaust flow, rather than a short bypass duct with unmixed exhaust flow. It was the first to include a "Thrust Management System" to maintain engine trim.

First customers

After testing the engine for several years, both in the air and on the ground, CFMI searched for customers outside of a possible AMST contract. The main targets were re-engine contracts for the Douglas DC-8 and the Boeing 707 airliners, including the related military tanker, the KC-135 Stratotanker. There was little initial interest in the engine, but Boeing realized that the CFM56 might be a solution to upcoming noise regulations. After announcing that a 707 would be configured with the CFM56 engine for flight tests in 1977, Boeing officially offered the 707-320 with the CFM56 engine as an option in 1978. The new variant was listed as the 707-700. Due to limited interest from the airlines in a re-engined 707, Boeing ended the 707-700 program in 1980 without selling any aircraft. Despite the lack of sales, having the commercial 707 available with the CFM56 helped the engine's competitiveness for the KC-135 re-engine contract.

KC-135R

Winning the contract to re-engine the KC-135 tanker fleet for the USAF would be a huge boon to the CFM56 project, and CFMI aggressively pursued that goal as soon as the Request For Proposals was announced in 1977. Like other aspects of the program, international politics played their part in this contract. In efforts to boost the CFM56's chances versus its competitors, the Pratt & Whitney TF33 and an updated Pratt & Whitney JT8D, the French government announced in 1978 that they would upgrade their 11 KC-135s with the CFM56, providing one of the first orders for the engine.
The USAF announced the CFM56 as the winner of the re-engine contract in January 1980. Officials indicated that they were excited at the prospect of replacing the Pratt & Whitney J57 engines currently flying on the KC-135A aircraft, calling them "...the noisiest, dirtiest, most fuel inefficient powerplant still flying" at the time. The re-engined aircraft was designated the KC-135R. The CFM56 brought many benefits to the KC-135, decreasing takeoff distance by as much as 3,500 ft, decreasing overall fuel usage by 25%, greatly reducing noise and lowering total life cycle cost. With those benefits in mind, the United States Navy selected the CFM56-2 to power their variant of the Boeing 707, the E-6 Mercury, in 1982. In 1984 the Royal Saudi Air Force selected the CFM56-2 to power their E-3 Sentry aircraft. The CFM56-2-powered E-3 also became the standard configuration for aircraft purchased by the British and French.

DC-8

By the end of the 1970s, airlines were considering upgrading their aging Douglas DC-8 aircraft as an alternative to buying new quieter and more efficient aircraft. Following the French KC-135 order in 1978, the April 1979 decision by United Airlines to upgrade 30 of their DC-8-61 aircraft with the CFM56-2 was important for securing the development of the CFM56; GE and Snecma were two weeks away from freezing development had that order not materialized. This decision marked the first commercial purchase of the engine, and Delta Air Lines and Flying Tiger Line soon followed suit, giving the CFM56 a firm footing in both the military and commercial market.

Boeing 737

In the early 1980s Boeing selected the CFM56-3 to exclusively power the Boeing 737-300 variant. The 737 wings were closer to the ground than previous applications for the CFM56, necessitating several modifications to the engine. The fan diameter was reduced, which reduced the bypass ratio, and the engine accessory gearbox was moved from the bottom of the engine to the 9 o'clock position, giving the engine nacelle its distinctive flat-bottomed shape. The overall thrust was also reduced, from, mostly due to the reduction in bypass ratio.
Since the small initial launch order for twenty 737-300s split between two airlines, over 5,000 Boeing 737 aircraft had been delivered with CFM56 turbofans by April 2010.

Continued development

Tech56 and Tech Insertion

In 1998, CFMI launched the "Tech56" development and demonstration program to create an engine for the new single-aisle aircraft that were expected to be built by Airbus and Boeing. The program focused on developing a large number of new technologies for the theoretical future engine, not necessarily creating an all-new design. When it became clear that Boeing and Airbus were not going to build all-new aircraft to replace the 737 and A320, CFMI decided to apply some of those Tech56 technologies to the CFM56 in the form of the "Tech Insertion" program which focused on three areas: fuel efficiency, maintenance costs and emissions. Launched in 2004, the package included redesigned high-pressure compressor blades, an improved combustor, and improved high- and low-pressure turbine components which resulted in better fuel efficiency and lower nitrogen oxides emissions. The new components also reduced engine wear, lowering maintenance costs by about 5%. The engines entered service in 2007, and all new CFM56-5B and CFM56-7B engines are being built with the Tech Insertion components. CFMI also offers the components as an upgrade kit for existing engines.

CFM56-7B "Evolution"

In 2009, CFMI announced the latest upgrade to the CFM56 engine, the "CFM56-7B Evolution" or CFM56-7BE. This upgrade, announced with improvements to Boeing's 737 Next Generation, further enhances the high- and low-pressure turbines with better aerodynamics, as well as improving engine cooling, and aims to reduce overall part count. CFMI expected the changes to result in a 4% reduction in maintenance costs and a 1% improvement in fuel consumption ; flight and ground tests completed in May 2010 revealed that the fuel burn improvement was better than expected at 1.6%. Following 450 hours of testing, the CFM56-7BE engine was certified by FAA and EASA on 30 July 2010 and delivered from mid-2011.
The CFM56-5B/3 PIP engine includes these new technologies and hardware changes to lower fuel burn and lower maintenance cost. Airbus A320s were to use this engine version starting in late 2011.

LEAP

The LEAP is a new engine design based on and designed to replace the CFM56 series, with 16% efficiency savings by using more composite materials and achieving higher bypass ratios of over 10:1. LEAP entered service in 2016.

Operational history

As of June 2016, the CFM56 is the most used high bypass turbofan, it achieved more than 800 million engine flight hours, and at a rate of one million flight hours every eight days it will achieve one billion flight hours by 2020. It has more than 550 operators and more than 2,400 CFM56-powered jet aircraft are in the air at any moment. It is known for its dependability: its average time on wing is 30,000 hours before a first shop visit, with the current fleet record at 50,000 hours.
As of July 2016, 30,000 engines have been built: 9,860 CFM56-5 engines for the Airbus A320ceo and A340-200/300 and more than 17,300 CFM56-3/-7B engines for the Boeing 737 Classic and 737NG. In July 2016, CFM had 3,000 engines in backlog. Lufthansa, launch customer for the CFM56-5C-powered A340, have an engine with more than 100,000 flight hours, having entered commercial service on 16 November 1993, overhauled four times since. In 2016 CFM delivered 1,665 CFM56 and booked 876 orders, it plans to produce CFM56 spare parts until 2045.
By October 2017, CFM had delivered more than 31,000 engines and 24,000 were in service with 560 operators, it attained 500 million flight cycles and 900 million flight hours, including over 170 million cycles and 300 million hours since 1998 for the B737NG's -7B and over 100 million cycles and 180 million hours for the A320ceo's -5B since 1996. By June 2018, 32,645 were delivered. Strong demand will extend production to 2020, up from 2019.
Exhaust gas temperature margin erodes with usage, one or two performance restoration shop visits, costing $0.3-$0.6m for a -5 series, can be performed before taking the engine off wing, which can restore 60% to 80% of the original margin; after that, the life limited parts must be replaced, after 20,000 cycles for the hot section, 25,000 for the axial compressor and 30,000 for the fan and booster for a recent CFM56 : the whole engine parts cost more than $3m, $3.5 to $4m with the shop work-hours, around $150 per cycle.
By June 2019, the CFM56 fleet had surpassed one billion engine flight hours, having carried more than 35 billion people, over eight million times around the world.
The CFM56 production will wind down as the final 737NG engine was delivered in 2019 and the last A320ceo engine will be delivered in May 2020. Production will continue at low levels for military 737s and spare engines and will conclude around 2024.

Design

Summary

The CFM56 is a high-bypass turbofan engine with several variants having bypass ratios ranging from 5:1 to 6:1, generating 18,500 to 34,000 lbf of thrust. The variants share a common design, but the details differ. The CFM56 is a two-shaft engine, meaning that there are two rotating shafts, one high-pressure and one low-pressure. Each is powered by its own turbine section. The fan and booster evolved over the different iterations of the engine, as did the compressor, combustor and turbine sections.

Combustor

Most variants of the CFM56 feature a single-annular combustor. An annular combustor is a continuous ring where fuel is injected into the airflow and ignited, raising the pressure and temperature of the flow. This contrasts with a can combustor, where each combustion chamber is separate, and a canannular combustor which is a hybrid of the two. Fuel injection is regulated by a Hydromechanical Unit, built by Honeywell. The HMU regulates the amount of fuel delivered to the engine by means of an electrohydraulic servo valve that, in turn, drives a fuel metering valve, that provides information to the full authority digital engine controller.
In 1989, CFMI began work on a new, double-annular combustor. Instead of having just one combustion zone, the double-annular combustor has a second combustion zone that is used at high thrust levels. This design lowers the emissions of both nitrogen oxides and carbon dioxide. The first CFM56 engine with the double-annular combustor entered service in 1995, and the combustor is used on CFM56-5B and CFM56-7B variants with the suffix "/2" on their nameplates.
GE started developing and testing a new type of combustor called the Twin Annular Premixing Swirler combustor, or "TAPS", during the Tech 56 program. This design is similar to the double-annular combustor in that it has two combustion zones; this combustor "swirls" the flow, creating an ideal fuel–air mixture. This difference allows the combustor to generate much less NOx than other combustors. Tests on a CFM56-7B engine demonstrated an improvement of 46% over single-annular combustors and 22% over double-annular combustors. The analytical tools developed for TAPS have also been used to improve other combustors, notably the single-annular combustors in some CFM56-5B and -7B engines.

Compressor

The high-pressure compressor, that was at the center of the original export controversy, features nine stages in all variants of the CFM56. The compressor stages have been developed from GE's "GE1/9 core" which was designed in a compact core rotor. The small span of the compressor radius meant that the entire engine could be lighter and smaller, as the accessory units in the system could be merged to the main fueling system running on aviation fuel. As design evolved HPC design improved through better airfoil design. As part of the Tech-56 improvement program CFMI has tested the new CFM-56 model with six-stage high-pressure compressor stages that was designed to deliver same pressure ratios similar to the old nine-stages compressor design. The new one was not fully replacing the old one, but it offered an upgrade in HPC, thanks to improved blade dynamics, as a part of their "Tech Insertion" management plan from 2007.

Exhaust

CFMI tested both a mixed and unmixed exhaust design at the beginning of development; most variants of the engine have an unmixed exhaust nozzle. Only the high-power CFM56-5C, designed for the Airbus A340, has a mixed-flow exhaust nozzle.
GE and Snecma also tested the effectiveness of chevrons on reducing jet noise. After examining configurations in the wind tunnel, CFMI chose to flight-test chevrons built into the core exhaust nozzle. The chevrons reduced jet noise by 1.3 perceived loudness decibels during takeoff conditions, and are now offered as an option with the CFM56 for the Airbus A321.

Fan and booster

The CFM56 features a single-stage fan, and most variants have a three-stage booster on the low-pressure shaft, with four stages in the -5B and -5C variants. The booster is also commonly called the "low-pressure compressor" as it sits on the low-pressure shaft and compresses the flow initially before it reaches the high-pressure compressor. The original CFM56-2 variant featured 44 tip-shrouded fan blades, although the number of fan blades was reduced in later variants as wide-chord blade technology developed, down to 22 blades in the latest variant, the CFM56-7.
The CFM56 fan features dovetailed fan blades which allows them to be replaced without removing the entire engine, and GE/Snecma claim that the CFM56 was the first engine to have that capability. This attachment method is useful for circumstances where only a few fan blades need to be repaired or replaced, such as following bird strikes.
The fan diameter varies with the different models of the CFM56, and that change has a direct impact on the engine performance. For example, the low-pressure shaft rotates at the same speed for both the CFM56-2 and the CFM56-3 models; the fan diameter is smaller on the -3, which lowers the tip speed of the fan blades. The lower speed allows the fan blades to operate more efficiently, which increases the overall fuel efficiency of the engine.

Thrust Reverser

The CFM56 is designed to support several thrust reverser systems which help slow and stop the aircraft after landing. The variants built for the Boeing 737, the CFM56-3 and the CFM56-7, use a cascade type of thrust reverser. This type of thrust reverse consists of sleeves that slide back to expose mesh-like cascades and blocker doors that block the bypass air flow. The blocked bypass air is forced through the cascades, reducing the thrust of the engine and slowing the aircraft down.
The CFM56 also supports pivoting-door type thrust reversers. This type is used on the CFM56-5 engines that power many Airbus aircraft. They work by actuating a door that pivots down into the bypass duct, both blocking the bypass air and deflecting the flow outward, creating the reverse thrust.

Turbine

All variants of the CFM56 feature a single-stage high-pressure turbine. In some variants, the HPT blades are "grown" from a single crystal superalloy, giving them high strength and creep resistance. The low-pressure turbine features four stages in most variants of the engine, but the CFM56-5C has a five-stage LPT. This change was implemented to drive the larger fan on this variant. Improvements to the turbine section were examined during the Tech56 program, and one development was an aerodynamically optimized low-pressure turbine blade design, which would have used 20% fewer blades for the whole low-pressure turbine, saving weight. Some of those Tech56 improvements made their way into the Tech Insertion package, where the turbine section was updated. The turbine section was updated again in the "Evolution" upgrade.
The high-pressure turbine stages in the CFM56 are internally cooled by air from the high-pressure compressor. The air passes through internal channels in each blade and ejects at the leading and trailing edges.

Variants

CFM56-2 series

The CFM56-2 series is the original variant of the CFM56. It is most widely used in military applications where it is known as the F108; specifically in the KC-135, the E-6 Mercury and some E-3 Sentry aircraft. The CFM56-2 comprises a single-stage fan with 44 blades, with a three-stage LP compressor driven by a four-stage LP turbine, and a nine-stage HP compressor driven by a single-stage HP turbine. The combustor is annular.
ModelThrustBPROPRDry weightApplications
CFM56-2A-2 5.931.8E-3 Sentry, E-6 Mercury
CFM56-2B16.030.5KC-135R Stratotanker, RC-135
CFM56-2C16.031.3Douglas DC-8-70

CFM56-3 series

The first derivative of the CFM56 series, the CFM56-3 was designed for Boeing 737 Classic series, with static thrust ratings from. A "cropped fan" derivative of the -2, the -3 engine has a smaller fan diameter at 60 in but retains the original basic engine layout. The new fan was primarily derived from GE's CF6-80 turbofan rather than the CFM56-2, and the booster was redesigned to match the new fan.
A significant challenge for this series was achieving ground clearance for the wing-mounted engine. This was overcome by reducing the intake fan diameter and relocating the gearbox and other accessories from beneath the engine to the sides. The resulting flattened nacelle bottom and intake lip yielded the distinctive appearance of the Boeing 737 with CFM56 engines.
ModelThrustDry weightApplications
CFM56-3B-16.027.5Boeing 737-300, Boeing 737-500
CFM56-3B-25.928.8Boeing 737-300, Boeing 737-400
CFM56-3C-16.030.6Boeing 737-300, Boeing 737-400, Boeing 737-500

CFM56-4 series

The CFM56-4 series was a proposed improved version of the CFM56-2 designed for the Airbus A320 family of aircraft. Competing with the RJ500 engine being developed by Rolls-Royce, the -4 series was designed to produce 25,000 lbf and was to feature a new 68 in fan, a new low-pressure compressor and a full authority digital engine controller. Soon after the upgrade project was launched in 1984, International Aero Engines offered their new V2500 engine for the A320. CFMI realized that the CFM56-4 did not compare favorably with the new engine and scrapped the project to begin working on the CFM56-5 series.

CFM56-5 series

The CFM56-5 series is designed for the Airbus aircraft and has a very wide thrust rating of between. It has three distinct sub-variants; the CFM56-5A, CFM56-5B and CFM56-5C, and differs from its Boeing 737 Classic-fitted cousins by featuring a FADEC and incorporating further aerodynamic design improvements.

CFM56-5A series

The CFM56-5A series is the initial CFM56-5 series, designed to power the short-to-medium range Airbus A320 family. Derived from the CFM56-2 and CFM56-3 families, the -5A series produces thrusts between 22,000 and 26,500 lbf. Aerodynamic improvements such as an updated fan, low-pressure compressor, high-pressure compressor and combustor make this variant 10–11% more fuel efficient than its predecessors.
ModelThrustDry weightApplications
CFM56-5A16.031.3Airbus A320
CFM56-5A36.031.3Airbus A320
CFM56-5A46.231.3Airbus A319
CFM56-5A56.231.3Airbus A319

CFM56-5B series

An improvement of the CFM56-5A series, it was originally designed to power the A321. With a thrust range between 22,000 and 33,000 lbf it can power every model in the A320 family and has superseded the CFM56-5A series. Among the changes from the CFM56-5A is the option of a double-annular combustor that reduces emissions, a new fan in a longer fan case, and a new low-pressure compressor with a fourth stage. It is the most numerous engine supplied to Airbus.
ModelThrustDry weightApplications
CFM56-5B15.535.4Airbus A321
CFM56-5B25.535.4Airbus A321
CFM56-5B35.435.5Airbus A321
CFM56-5B45.732.6Airbus A320
CFM56-5B56.032.6Airbus A319
CFM56-5B65.932.6Airbus A319, A320
CFM56-5B75.735.5Airbus A319, A319CJ
CFM56-5B86.032.6Airbus A318, A318CJ
CFM56-5B95.932.6Airbus A318, A318CJ

CFM56-5C series

With a thrust rating of between 31,200 and 34,000 lbf, the CFM56-5C series is the most powerful of the CFM56 family. It powers Airbus' long-range A340-200 and -300 airliners, and entered service in 1993. The major changes are a larger fan, a fifth low-pressure turbine stage, and the same four-stage low-pressure compressor found in the -5B variant.
Unlike every other variant of the CFM56, the -5C features a mixed-exhaust nozzle, which offers slightly higher efficiency.
ModelThrustDry weightApplications
CFM56-5C26.637.4Airbus A340-211/-311
CFM56-5C36.537.4Airbus A340-212/-312
CFM56-5C46.438.3Airbus A340-213/-313

CFM56-7 series

The CFM56-7 first ran on 21 April 1995. Rated with a takeoff thrust range of, it powers the -600/-700/-800/-900 Boeing 737 Next Generation; compared to the CFM56-3, it has greater durability, 8% fuel burn improvement and a 15% reduction in maintenance costs.
Improvements are due to its 61-inch titanium wide chord fan, 3D aerodynamics designed new core and low-pressure turbine with single crystal high-pressure turbine and Full Authority Digital Engine Control. Fan blades are reduced from 36 to 24 and it incorporates features from the CFM56-5B such as a double-annular combustor as an option.
Less than two years after entry into service, the Next-Generation 737 received 180 minutes Extended range twin engine Operations certification from the US Federal Aviation Administration. It also powers the Boeing 737 military versions : Airborne Early Warning & Control, C-40 Clipper transport and P-8 Poseidon Maritime Aircraft.
ModelThrustDry weightApplications
CFM56-7B185.532.7Boeing 737-600
CFM56-7B205.432.7Boeing 737-600, Boeing 737-700
CFM56-7B225.332.7Boeing 737-600, Boeing 737-700
CFM56-7B245.332.7Boeing 737-700, Boeing 737-800, Boeing 737-900
CFM56-7B265.132.7Boeing 737-700, Boeing 737-800, Boeing 737-900, BBJ
CFM56-7B275.132.7Boeing 737-800, Boeing 737-900, BBJ/BBJ2, AEW&C, MMA

Reliability

The CFM56 has an in-flight shutdown rate of 1 incident per 333,333 hours. Record time on wing before the first shop visit was 30,000 hours in 1996, to 40,729 hours in 2003 and 50,000 hours in 2016.
There have been several engine failures in the early service of the CFM56 family which were serious enough to either ground the fleet or require aspects of the engine to be redesigned. The engines have also suffered, periodically, from thrust instability events tentatively traced to Honeywell's hydromechanical unit.

Rain and hail ingestion

There are several recorded incidents of CFM56 engines flaming out in heavy rain and/or hail conditions, beginning early in the CFM56's career. In 1987, a double flameout occurred in hail conditions, followed by the TACA Flight 110 incident in 1988. Both CFM56 engines on the TACA 737 flamed out while passing through hail and heavy rain, and the crew was forced to land without engines on a grassy levee near New Orleans, Louisiana. CFMI modified the engines by adding a sensor to force the combustor to continuously ignite under these conditions.
In 2002, Garuda Indonesia Flight 421 had to ditch in a river because of hail-induced engine flameouts, killing a flight attendant and injuring dozens of passengers. Prior to this accident, there were several other incidents of single or dual flameouts due to these weather conditions. After three incidents through 1998, CFMI made modifications to the engine to improve the way in which the engine handled hail ingestion. The major changes included a modification to the fan/booster splitter and the use of an elliptical, rather than conical, spinner at the intake. These changes did not prevent the 2002 accident, and the investigation board found that the pilots did not follow the proper procedures for attempting to restart the engine, which contributed to the final result. Recommendations were made to better educate pilots on how to handle these conditions, as well as to revisit FAA rain and hail testing procedures. No further engine modifications were recommended.

Fan blade failure

One issue that led to accidents with the CFM56-3C engine was the failure of fan blades. This mode of failure led to the Kegworth air disaster in 1989, which killed 47 people and injured 74 more. After the fan blade failed, the pilots mistakenly shut down the wrong engine, resulting in the damaged engine failing completely when powered up for the final approach. Following the Kegworth accident, CFM56 engines fitted to a Dan-Air 737-400 and a British Midland 737-400 suffered fan blade failures under similar conditions; neither incident resulted in a crash or injuries. After the second incident, the 737-400 fleet was grounded.
At the time it was not mandatory to flight test new variants of existing engines, and certification testing failed to reveal vibration modes that the fan experienced during the regularly performed power climbs at high altitude. Analysis revealed that the fan was being subjected to high-cycle fatigue stresses worse than expected and also more severe than tested for certification; these higher stresses caused the blade to fracture. Less than a month after grounding, the fleet was allowed to resume operations once the fan blades and fan disc were replaced and the electronic engine controls were modified to reduce maximum engine thrust to 22,000 lbf from 23,500 lbf. The redesigned fan blades were installed on all CFM56-3C1 and CFM56-3B2 engines, including over 1,800 engines that had already been delivered to customers.
In August 2016 Southwest Airlines Flight 3472 suffered a fan blade failure, but landed later without further incident. While the aircraft sustained substantial damage, there were no injuries.
On 17 April 2018, Southwest Airlines Flight 1380 suffered from what appears to be a fan blade failure, debris from which punctured a window. The Boeing 737-700 landed safely, but one passenger was killed and several were injured.

Fuel flow problems

Airlines have reported 32 events involving sudden instability of thrust, at various points during flight, including high thrust settings during climb to altitude. The problem has been long-standing. In 1998, two 737 pilots reported that their engine throttles suddenly increased to full thrust during flight. A very recent investigation has led to the tentative conclusion that the problem originates in the Hydromechanical unit, and may involve an unacceptable level of fuel contamination, or overuse of biocides to reduce bacterial growth. Boeing told Aviation Week and Space Technology that CFM International had revised its FADEC software. The new software "...'reduces the duration and degree of thrust-instability events' by cycling the fuel monitoring valve and the EHSV to clean the EHSV spool." This software fix is not intended to be a definitive solution to the problem; CFM claimed that no further reports have reached it after this change was made.

Applications