Carlingford railway line


The Carlingford railway line is a former railway line in Sydney, Australia. It was opened from Clyde to Subiaco in January 1885, then by means of the construction of a bridge across the Parramatta River, to Carlingford in April 1896. It closed on 5 January 2020 with much of the line to be converted to light rail as part of the Parramatta Light Rail network, while a short section of the line was retained for use by Sydney Trains.

Line description

The Carlingford line branched off the Western line at Clyde heading north and crossing Parramatta Road via a level crossing, before passing under the M4 Western Motorway to Rosehill station. It was a double track line to this point.
Immediately south of Rosehill, the two tracks joined, before dividing into two bi-directional tracks, the Sandown line and the Carlingford line. Rosehill station had two platforms; one four-car long platform on the Carlingford line and one platform which was approximately sixteen-cars long on the Sandown line track which was used for special events at Rosehill Gardens Racecourse.
Originally these operated as conventional platforms; the shorter platform being served by northbound services and the longer one by southbound services with the double track merging into a single track to the north of the station. However on race days, the shorter platform would be served by services in both directions to allow for the section immediately north of the station on the southbound track to stable race day trains. In June 1992 the junction was moved to south of Rosehill station with the shorter platform served by Calingford line services in both directions and the longer platform only by race day trains and Sandown line services.
The line then headed in a north-easterly direction over the Parramatta River to Carlingford. The stations from Camellia to Carlingford consisted of a single platform of a sufficient length to accommodate four-carriage trains. There were no crossing loops or any further sections of double track on the line, and thus no capacity for trains to pass each other.
There were no signals past Rosehill, meaning the entire section of line is one block, meaning only one train could be in this section at any time. Trains entering or exiting this block were detected using an axle counter. The lack of track circuits also meant that trains on this line appeared to be stopped at Rosehill on realtime apps when between Rosehill and Carlingford. The section between Rosehill and Clyde was controlled using conventional track circuits and signals.

Stations

Sidings

A number of industrial and car storage sidings have been built on the line.
Starting from the Clyde end:
The line was opened in two sections: Clyde to Camellia was opened on 17 November 1888, and Camellia to Carlingford was opened on 20 April 1896. Telopea station was added in 1925. Originally the line was privately owned by two companies: the line from Clyde to Rosehill was owned by John Bennett and the line from Rosehill to Carlingford was owned by the Rosehill Railway Company. The lines were taken over by their bank in 1896, with the Government purchasing the line in 1898 and recommencing services on 1 August 1900. The line was duplicated to just south of Camellia station on 19 June 1902.
The line from Clyde to Rosehill was electrified on 12 December 1936. The electrification was extended to Carlingford on 9 August 1959. Passenger services to Sandown ceased on 19 December 1991.
In 1996, the original iron lattice bridge over the Parramatta River was replaced. The new bridge only has one track, although it was built to allow a second track to be laid in the future. It sits on the refurbished piers of the original bridge.
In early 2007 the pedestrian crossings at Telopea and Dundas stations were rebuilt. The new automatic crossings provide audible and visual warnings of an approaching train and a short time later close the metal gates.
Over the week of 20 to 26 October 2007, the section of track from Telopea to Carlingford was completely replaced, utilising concrete sleepers instead of timber ones. The section from Telopea to Rosehill was similarly upgraded over the fortnight of 22 June to 3 July 2009. The railway remains on timber sleepers from Rosehill to Clyde.
The line was colour-coded orange in CityRail promotional material until 1991 when it was coded yellow. From 2000 it has been colour-coded dark blue.
Until June 2010, the line carried oil trains to and from the Clyde Refinery on the Sandown line. In October 2016, Sandown line traffic was officially suspended. A Stop Block was placed on the Sydney side of Access Road level crossing.

Modification proposals

The line's low frequency and low level of patronage led to various inquiries and studies into its future. A major problem was the level crossing over Parramatta Road, which held up traffic when trains travelled across it. Proposals included tunnel links to Clyde or Granville stations, or replacing the line altogether with a more frequent light rail or busway service.
The New South Wales Government originally planned for the Carlingford line to be part of Stage 2 of the Parramatta Rail Link. That plan would have incorporated the majority of the line, with the section between Carlingford and Camellia duplicated. Telopea, Dundas, and Rydalmere stations would also have been duplicated and upgraded to allow eight car trains. Camellia station would have been demolished, and Rosehill station closed and replaced by a new underground station with a preliminary name of 'Rosehill/Camellia'. Carlingford station would also have been replaced by an underground station. Various proposals were put forward, including a three-way underground junction near Carlingford, linking the station to the proposed North West Rail Link, as well as the line to Chatswood. In 2003, the Minister for Transport, Michael Costa announced that only Stage 1 of the line, from Chatswood to Epping, would be built, but the Carlingford line section was indefinitely postponed.
Under the Rail Clearways Project, announced in 2004, the line was to have had a crossing loop at Rydalmere, thus allowing an increase in train frequency to half-hourly throughout the day. However, that part of the Clearways Project was cancelled in November 2008.
In August 2010, the Federal Government promised $2.6 billion towards the project, which, along with funding from the New South Wales Government, would have allowed the line to be extended from Epping to Parramatta via the Carlingford line. Work was to commence in 2011, with a projected 2017 finish. Following a change of government at the 2011 state election, the project was shelved. A large amount of land lies behind Carlingford station, for future extensions of the line.

Parramatta Light Rail

In 2013, Parramatta City Council published a feasibility study into a Western Sydney Light Rail network. The study proposed the construction of a light rail line from Parramatta to the Macquarie Centre, running parallel to the Carlingford line between Camelia and Dundas. The report noted that while the future of the railway line was a matter for the state government, conversion of the line to light rail would reduce the cost of the light rail's construction significantly.
In December 2015, the NSW government announced the Camellia to Carlingford section of the line would be converted to light rail, forming a branch of the Parramatta Light Rail network. That would replace the connection to the Sydney Trains network at Clyde with a link to Parramatta and Westmead. As a consequence, the Carlingford line north of Parramatta Road was closed on 5 January 2020 to allow conversion works to take place. Much of the remaining section closed permanently. That included Rosehill station, which is not on the light rail route. The short section between Clyde and the Parramatta Road level crossing will remain open to allow access to Sydney Trains' track inspection depot. The Sandown line was formally closed in July 2019. A replacement bus service, the route 535, was introduced from Parramatta to Carlingford, and is operated by Hillsbus. The level crossing across Parramatta Road was removed in late January 2020.

Services

In its last years, all services on the line operated as shuttle services from Clyde. A few peak hour services operated to and from Central, but these had been withdrawn years before the line closed. With annual patronage of 569,000 for the year 2019, the Carlingford line was Sydney's least-used suburban railway line.

Remains

Very little of the line remains as of May 2020 as the tracks and overhead wiring were removed in January 2020 with the stations at Rydalmere, Telopea, Camellia and Carlingford demolished in April/May 2020.
The only remnants of the railway that will be left and integrated with the light rail are the Parramatta River bridge at Rydalmere and the former Dundas Station building.

Rolling stock

Prior to the line being electrified, services were hauled by Z13 and Z20 class locomotives. Some services were operated by CPH railmotors. Electric services were operated by Standard suburban carriages and Sputnik Carriages then S sets in two and later four carriage formations from 1993 to 2019 then finally K and M sets from July 2019 to the line's closure.