Central Park Tower
Central Park Tower, also known as the Nordstrom Tower, is a residential supertall skyscraper being developed by Extell Development Company and Shanghai Municipal Investment Group along Billionaires' Row on 57th Street in Midtown Manhattan, New York City. Designed by Adrian Smith + Gordon Gill Architecture, the building rises and is the second-tallest skyscraper in the United States and the Western Hemisphere, the 15th tallest building in the world, the tallest residential building in the world, and the tallest building outside Asia by roof height.
The site of the Central Park Tower was formerly occupied by two buildings at 225 West 57th Street and 1780 Broadway, which were demolished in 2011–2012. In mid-2012, Nordstrom committed to opening their first store in New York City within the base of the tower. A proposed cantilever above the Art Students League of New York's building at 215 West 57th Street, intended to maximize views of nearby Central Park, resulted in several lawsuits, but was later allowed because construction had already started. Despite uncertainty about the final design and complications relating to the tower's financing, excavations at the site started in May 2014. Actual construction started in February 2015, with the building topping out in September 2019.
History
Planning
In the summer of 2005, Extell purchased the former home of the Hard Rock Cafe and Broadway Dance Center at 221 West 57th Street and the neighboring property fronting 58th Street for a total of $67.5 million. Combined, the two parcels yielded over of buildable space. The Broadway Dance Center, which occupied five stories of the building in a lease that ran until 2012, was served a notice of default by Extell in September 2005 for operating without the required public assembly permit. Extell also revoked the Center's use of the building's internal staircases due to theft concerns and offered the Center $1 million to move to a new home on 55th Street.In January 2006, Extell added to the assemblage by purchasing of air rights from the landmarked Osborne Apartments at 205 West 57th Street. The purchase of the former B. F. Goodrich Company showroom at 1780 Broadway and two contiguous properties for $57.5 million in June 2006 added of development rights. Extell added another 58th Street parcel in September 2006, paying $14 million for the 20 foot wide site which held of development rights. Two months later, Extell paid $2.23 million for of air rights from the Saint Thomas Choir School at 202 West 58th Street. In January 2007, the estate of developer Sol Goldman sold Extell the remaining air rights from the 13-story apartment building at 200 West 58th Street. Combined, these purchases created an assemblage which could yield a building.
The site at 225 West 57th Street was originally home to an eight-story building built in 1909 as part of Manhattan's "Automobile Row" on 57th Street. Designed by Howard Van Doren Shaw, the New York City Landmarks Preservation Commission attempted to protect the building and the neighboring 1780 Broadway in 2009, after a failed attempt at landmarking the structures in 1994. However, after pushback by Extell and Speaker of the New York City Council Christine Quinn, the Preservation Commission allowed Extell to tear down the structures while protecting only the facade of 1780 Broadway in a 6 to 3 vote.
Some preservationists such as the Historic Districts Council and New York Landmarks Conservancy expressed dissatisfaction that the New York City Council had influenced the decision by making clear that they would veto any designation the Landmarks Preservation Committee made on the properties. The American Institute of Architects, New York State Assembly member Richard N. Gottfried, and the Landmarks Preservation Council of Illinois spoke in favor of the building's designation while the Real Estate Board of New York and City Council members Melinda Katz, Daniel Garodnick, and Jessica Lappin spoke against landmark status. Extell demolished 225 West 57th Street in 2011 and tore down the interiors of 1780 Broadway at the end of 2012.
In the summer of 2012, Nordstrom committed to opening their first store in New York City, signaling their intent to occupy at the base of the tower. The company initially paid a $102.5 million down payment to occupy the first five floors of the building along with two basement floors. Around the same time, Extell purchased the neighboring building at 223 West 58th Street for $25 million and took out a new $300 million mortgage from The Blackstone Group on the assemblage. The new mortgage allowed Extell to repay a $250 million loan from HSBC on the properties.
At the end of the year, Extell revealed that Adrian Smith + Gordon Gill would design the tower and that it would rise to become the second-tallest building in New York City. Adrian Smith's firm, which had been recommended by Nordstrom, beat out other notable contenders for the design including Herzog & de Meuron, SHoP Architects, Jean Nouvel, Foster and Partners, and Rogers Stirk Harbour + Partners. At the time, the building was expected to rise, open in 2018, and contain a hotel on floors seven through twelve.
In July 2013, Extell also completed the site's assemblage by paying $25 million for the 20 foot wide lot at 232 West 58th Street, adding another of development rights. In October, Extell purchased of air rights from Peter Fine's Atlantic Development Group using New York's inclusionary zoning program to support affordable housing. Atlantic Development Group had earned the air rights after building an affordable apartment building on 35th Street in Murray Hill, Manhattan in 2005.
Cantilever controversy
In order to maximize views of Central Park, whose southern border is located two blocks north, Extell paid $31.8 million for of air rights and the ability to build a cantilever roughly above the Art Students League of New York's building at 215 West 57th Street. The cantilever would extend from the eastern side of Extell's building and cover roughly one third of the space above the Art Students League building. Extell had already purchased of air rights from the League in 2005 for $23.1 million. Without the cantilever, Vornado Realty Trust's under construction 220 Central Park South would have blocked the first of the tower.In October 2013, Manhattan Community Board 5 voted against allowing the cantilever, although the vote was merely advisory and final power over the decision rested with the Landmarks Preservation Commission. Weeks later, the Landmarks Preservation Commission approved the air rights sale and cantilever in a 6-1 vote. At the same meeting, Extell revealed a revised design which would rise tall. In February 2014, the Art Students League also approved the deal in a 1,342-227 vote among all members despite opposition from several third parties including the Municipal Art Society.
Afterwards, over 100 members of the Art Students League filed suit against Extell and the Art Students League organization itself to attempt to stop the air rights sale, but the lawsuit was dismissed in the summer of 2014. Nearly two years later, 300 members of the League filed another lawsuit, this time against the leadership of the League, claiming that instructions on how to vote on the sale were misleading and that the publicized voting procedure was not followed correctly. According to the lawsuit, materials distributed by the League's leadership indicated that abstaining from voting would count the same as a "no" vote which allegedly led many members not to vote on the issue. Thus, the vote's tally should have been 2,603–1,342 against the air rights sale, if the members not voting had been counted the same as a "no" vote. The second lawsuit was dismissed through summary judgment when a judge ruled that the League's leadership had acted in good faith while interpreting the League's by-laws regarding voting procedures. When the members appealed, the appeals court upheld the decision since construction had progressed to a point where it could not be undone without causing undue hardship that would cost Extell more than $200 million.
Early construction and financing difficulties
In the middle of 2013, the state-owned Export-Import Bank of China was reportedly in negotiations to provide a $1 billion construction loan for the project. The loan would have been the largest construction loan in New York City since the Financial crisis of 2007–2008 and also the Chinese bank's first loan in the United States. As part of the deal, fellow state-owned enterprise China State Construction Engineering would have acted as the co-general contractor on the project's construction alongside Australian Lendlease Group. By November, Extell had demolished all the previous buildings on the site and the company began excavating the building's deep foundations in May 2014.A new design for the tower was leaked in July 2014 that revealed a tower with a spire reaching, just a foot shy of One World Trade Center's pinnacle. After nearly a year of excavation, the building's concrete foundation was poured in February 2015.
New renderings were revealed on April 20, 2015, showing a roof height of and an architectural height of with the spire. However, new permits filed several months later showed the building without a spire but increased the roof height to. At the same time, the building's official name of "Central Park Tower" was unveiled and the completion date was pushed back to 2019. The building's tower crane was installed in July 2015 and the structure reached street level by the end of September. The structural steel for Nordstrom's retail base was complete by the middle of 2016.
In August 2016, Extell faced the maturation of the $285 million land loan from Blackstone. In June 2016, Extell announced they were seeking to raise $190 million in financing for the tower from foreign investors through the EB-5 visa program. The company had previously raised $400 million by selling the retail portion to Nordstrom and an additional $300 million by issuing bonds on the Tel Aviv Stock Exchange. Around the same time, Extell also brought in the Shanghai Municipal Investment Group as an additional equity investor for roughly $300 million. With the additional cash in hand, Extell repaid $50 million of the Blackstone loan and extended the maturity on the remaining $235 million another six months to December 2016.
The additional capital didn't put an end to Extell's financing struggles as the building still required a roughly $1 billion construction loan. If the loan was not secured by May 2017, SMI could force Extell to repay its $300 million equity investment with interest. SMI was also entitled to an annual interest of 4.5% in monthly payments, as well as 30% of the development fees, and held final say over all major decisions. Additionally, the interest rate on Extell's bonds on the Tel Aviv Stock Exchange soared from 6% to over 16%, effectively turning them into junk bonds. Most pressingly, the refinanced Blackstone land loan was maturing in December 2016 and the interest rate would jump from 8% to 14% if Extell defaulted. By December 2016, Extell still did not have the cash to repay the land loan and secured only a one-week extension from Blackstone. On December 17, the day the land loan was due, Extell closed a new $235 million bridge loan with JPMorgan Chase and hedge funds Fortress Investment Group and Baupost Group in order to repay Blackstone.
By March 2017, Extell disclosed that it had spent $939 million on the development of the tower since 2014 including over $300 million in 2016 alone. The tower's completion date was also pushed back another year to November 2020. At the same time, the company raised another $25 million from Nordstrom, bringing the company's total commitment to $426 million. However, Nordstrom included a put option on its investment which allowed the company to force Extell to repurchase the space if the store was not delivered by December 2018. A further $168 million came from EB-5 investors and Extell hoped to raise that number to a total of $340 million, $150 million above their original goal.
At the end of May, Extell received approval to begin sales at the development. The company was targeting a total $4.02 billion sellout for the project's 179 condominiums, down from a $4.4 billion target two years earlier. However, the average unit price of $22.5 million was twice as much as the average sales price for a top New York City luxury apartment. Additionally, Extell hoped to sell 20 of the units for more than $60 million a piece, including a $95 million penthouse. An additional three duplex penthouses at the top of the tower were unpriced.
In May 2017, SMI could have exercised their put option to require Extell to repay their $300 million equity investment with interest, but instead the company extended the deadline. The new terms required Extell to secure a construction loan by the end of 2017. In June 2017, Israeli bondholders became concerned that Extell would be unable to meet its bond obligations as it held only $120 million in cash and still had not closed a construction loan for Central Park Tower. The yield on the bonds jumped by 7% to 13%, below their 2016 peak of 16% but still well into junk bond territory. A month later, over 40 private and institutional bondholders met to discuss whether to force early repayment on the bonds. Extell was scheduled to repay $180 million in December 2018 but investors were worried that the company could not raise the cash due to unrealistic pricing at Central Park Tower given the state of the luxury market.
Following the bondholder's meeting, Extell signed a term sheet for a $900 million construction loan with JPMorgan Chase in August 2017 after negotiating with lenders for over 18 months. Despite the term sheet, in August all of Extell's bonds' credit rating were downgraded by an Israeli bond rating agency after the company revealed it had just $36 million in cash on hand. In response, Extell revealed that they intended to close on the loan with JPMorgan before the end of the year. However, the company also admitted that while cash on hand was enough to cover construction costs in the "short term", they would not be able to sustain construction through 2018 without a loan. SMI also agreed to push back the deadline on their put option for a third time, from December 2017 to June 2018.
Final financing and construction
The first glass was installed on the building in September 2017 when the building was roughly a third of the way to its peak. At the end of 2017, Extell announced they closed on $900 million in construction financing from JPMorgan Chase and an additional $235 million preferred equity investment from a hedge fund. The preferred equity carried an interest rate of 11% while the senior loan carried the unusually high rate of Libor plus 4.5%. JPMorgan required repayment of the loan by December 2021 and also stipulated that Extell must sell $500 million worth of apartments in three years by December 2020 or face default.In March 2018, Extell announced they would be selling 17% of the equity in the tower to a group of investors for $107 million. The news sparked another downgrade of Extell's bonds, the second in less than a year. The same month, the tower's sales director left to rejoin Brown Harris Stevens after less than 6 months on the job. The tower reached the mark in the spring of 2018 and approximately by the end of the year.
In October 2018, Extell officially launched sales at the project. By the end of 2018, Extell had spent $1.7 billion on construction of the tower and expected to spend another $1.3 billion before the building opened. This total project cost of $3 billion was over $1 billion higher than the $1.9 billion that Extell expected construction to cost in 2016. Extell also increased the projected sellout of the building's condominiums to $4.5 billion or $7,450 per square foot, up from projections of $4.02 billion in May 2017 and higher even than the $4.4 billion in sales Extell expected in 2016. The company also unveiled new buyer's incentives in early 2019, offering to waive three years of common charges and pay 50% of broker's commissions.
Central Park Tower surpassed 432 Park Avenue in March 2019, reaching. Central Park Tower reached over by the end of July 2019, surpassing Willis Tower in Chicago. In a September 2019 interview with Bloomberg Television, Extell founder Gary Barnett admitted that, " flying off the shelves like One57 did when we started six or seven years ago, when we were the only game in town. There's certainly much more competition." He also signaled an openness to discounting units to increase sales in addition to the existing buyer's incentives. Barnett reaffirmed this sentiment in a December interview with The Real Deal, stating "we don’t have the velocity we’d like to see, but we are signing deals. We are chipping away at the inventory."
Central Park Tower topped out on September 17, 2019, the same day as One Vanderbilt. By the end of the year, the building's glass curtain wall had been almost completely installed. However, further construction was temporarily halted in March 2020 due to the COVID-19 pandemic in New York City.
Incidents
On July 12, 2017, a crate containing window panes fell from the building's 16th floor after a ramp connecting the construction hoist to the building collapsed. The New York City Fire Department closed 58th Street for the rest of the day to investigate.On December 18, 2019, ice falling from Central Park Tower injured a pedestrian, who required hospitalization. Multiple blocks near the building were closed to traffic and pedestrians by the Department of Emergency Management, and the Department of Buildings stopped construction on the building indefinitely. The falling ice was considered problematic because ice sliding down a flat facade, such as that of Central Park Tower, could reach a maximum speed of from a height of as little as 15 stories.
Security guard death
At 10:25 am on May 26, 2018, a glass panel standing at the ground floor was accidentally hit with a forklift while a teamster attempted to move a piece of ducting and tipped over on top of a security guard. A construction worker at the scene had tried to rescue the security guard, and ended up fracturing his right foot. Emergency medical technicians were called at 10:31 and arrived at 10:36 to find a “completely crushed patient" who was in cardiac arrest when they arrived. A group of between 15 and 20 men were able to lift the glass off him at which point the paramedics tried CPR and gave him an IV. The security guard, 67-year old Harry Ramnauth from the Bronx, was rushed to Mount Sinai Hospital where he was pronounced dead at 11:02. The autopsy listed the cause of death as blunt force trauma of the neck and torso.After the incident, the New York City Department of Buildings ordered a temporary halt to construction, though work soon resumed. Ramnauth's family also sued Extell, contractor Pinnacle Industries, and the developer's insurer AIG for the pain and suffering Ramnauth endured between the time the glass panel fell on him and when he lost consciousness six to eight minutes later. The family proposed a $4.75 million settlement, but Extell initially refused. In January 2020, Lendlease Group, contractor Pinnacle Industries, and Extell paid the guard's family $1.25 million to settle the family's wrongful death claim.
Following an investigation by the federal Occupational Safety and Health Administration, both general contractor Lendlease and subcontractor Permasteelisa North America were cited and fined $12,934 each. According to OSHA, the contractors failed to keep the construction site's aisles and passageways clear so that material handling equipment or employees could move freely, leading to the guard's death. Both contractors filed disputes with OSHA's findings and appealed the fines. Lendlease was also fined $25,000 by the New York City Office of Administration Trials and Hearings for failing to adequately safeguard the construction site which led to the guard's death. Lendlease later filed a lawsuit seeking to overturn the City's findings, arguing that the security guard did not qualify as a "member of the public" and that the City did not inspect the site until three days following the incident and therefore lacked direct knowledge of what occurred.
Design
The building is designed by Adrian Smith + Gordon Gill Architecture. The first seven floors of the tower are anchored by New York City's first Nordstrom department store. Floors eight to twelve will house amenity spaces for residents.looking east along 58th Street, September 2019
Condominiums
The building contains 179 condominiums starting on the 32nd floor, spanning on average, with open layouts and floor-to-ceiling windows overlooking Central Park. Interiors of the building's condominiums are designed by Rottet Studio. Interior features include Miele and Sub-Zero appliances, custom cabinetry and white oak floors. A triplex penthouse at the top of the building will span across floors 129 through 131.Amenities
There will be of amenities on floors eight to twelve. On the 14th floor, the building will feature the “Central Park Club” with a lounge, theater, conference room, play area and a tween lounge. A landscaped terrace designed by HMWhite will feature a 60-foot outdoor pool with pergolas and trellises, central lawn and two gardens. On the 16th floor, there will be a 63-foot indoor pool, exercise room, spa, gym, basketball court and children's playroom.There will also be a three-floor private club named "The 100th Floor" near the building's apex, marketed as the highest private club in the world. The space will contain a 126-person ballroom, a cigar bar, and a private dining room.