Cerrejón


Cerrejón is a large open-pit coal mine in Colombia. It is located in the southeast of the department of La Guajira, close to the border with Venezuela. The coal mine is situated in the northeastern part of the Cesar-Ranchería Basin, the basin of the Ranchería River, between the Sierra Nevada de Santa Marta in the west and the Serranía del Perijá to the southeast. At Cerrejón, low-ash, low-sulphur bituminous coal from the Cerrejón Formation is excavated. The mine is one of the largest of its type, the largest in Latin America and the tenth biggest in the world. Cerrejón extends over. It is divided into three sections, North Zone, Central Zone and South Zone. Total proven reserves are estimated at 503 megatonnes. In 2016, the mine produced.
In June 2020, lawyers for the local Wayuu community lodged a request to the United Nations special rapporteur for work to be immediately halted over environmental and human rights concerns.

History

The 19th century

There is controversy about the discoverer of Cerrejon mine, and some names are shuffled: the American civil engineer John May, hired by the national government, which conducted the examination in 1864; the writer Jorge Isaacs; and Mr. Juan Gomez Osío, native of La Guajira. In the 19th century small scale mining began.

Cerrejón North Zone

A major part of the history of the Cerrejón mine should be mentioned: the "defunct" company Intercor was in its time called "The Cerrejón Zona Norte Coal Project".
In December 1976, a partnership contract was signed between Carbocol S. A., a state-owned firm, and Intercor , at the time Exxon, today ExxonMobil subsidiary, to develop the north zone of Cerrejón. This contract considered three stages: exploration, construction, and production. In January 1999, the Colombian government extended the concession for a further 25 years, to 2034.
In this zone, there are two areas under concession:
In 2001, after a public tender, this area was ceded to a consortium comprising Carbones del Cerrejón S. A. and Cerrejón Zona Norte S.A., which is currently concessioned to subsidiaries of BHP Billiton, Anglo American, and Xstrata.

Cerrejón South Zone

In 1997, after a tender process, the exploration and mining contract for this zone was awarded to the consortium now comprising subsidiaries of BHP Billiton, Anglo American, and Xstrata. Currently, the Cerrejón South Zone is under exploration.

Description

Cerrejón is the tenth largest coal mine in the world and the biggest in Latin America. Production started in 1985, when the mine was operated by Carbocol, a Colombian state company and Intercor, a subsidiary of ExxonMobil. The proven reserves in 2009 were and the probable reserves. The coal is low-ash, low-sulphur bituminous coal, mined from the Paleocene Cerrejón Formation in the northeastern part of the Cesar-Ranchería Basin. The coal seams reach a thickness of. The total production in 2016 was.

Operation, installations and operator

Cerrejón is owned in equal parts by subsidiaries of the international mining companies BHP, Anglo American and Glencore. The mine produces over 32 million tonnes of thermal coal a year and has estimated reserves of over five billion tonnes
Unique in Colombia, the mine has an integrated railway line and shipping terminal, which gives increased efficiency and lower environmental impact. As well exporting coal, the port and railway are used to transport supplies to the mine.
The mine has maintenance workshops of over.

Railway

The integrated railway line is long. Each train can haul 109 freight wagons, each of which can carry of 96 to 110 tonnes of coal.

Port

The Puerto Bolívar shipping terminal loads bulk carrier ships of up to. The port also has a supply dock for ships of up to 70,000 tonnes which is used to supply machinery, spare parts, fuel, and other goods for the mining operation. The navigable channel is deep, wide, and. It is one of the largest coal maritime ports in South America with clean technology.

Integrated operation

Figures

Carbones del Cerrejón has a mining fleet comprising 493 pieces of equipment: 258 trucks with a load capacity of 190, 240, and 320 tonnes, 50 hydraulic shovels, and 185 pieces of auxiliary equipment.
;Railway
;Puerto Bolívar
;Airports
;Mine-Puerto Bolívar Motorway
;Mushaisa Residential Unit
The extraction process begins with the identification and relocation of wildlife in the area slated for intervention. Then the land is cleared and the topsoil is removed and stored in soil banks for the future reclamation of areas intervened by the mining operation. Subsequently, the area is drilled and explosives inserted for blasting so the hydraulic shovels can remove the overburden. This waste rock is loaded on 240-tonne and 320-tonne trucks and deposited in waste rock dump sites.