The South Fork and North Fork of the Holston River merge to form the Holston River proper in Kingsport, Tennessee, from which the river proceeds southwestward for just over across northeastern Tennessee before joining with the French Broad River in Knoxville to form the Tennessee River. Cherokee Dam is located approximately upstream from the Holston's mouth. The dam was built immediately downstream from a point where Mossy Creek, which flows northeastward from Jefferson City, joins the Holston to create a T-shaped formation. The dam's immediate headwaters and tailwaters still resemble this formation. Cherokee Lake stretches for from the dam to the John Sevier Combined Cycle Plant just south of Rogersville, Tennessee, and includes parts of Jefferson, Grainger, Hamblen, and Hawkins counties. The lake's Mossy Creek embayment reaches all the way to the city limits of Jefferson City. Tennessee State Route 92 crosses the Holston just downstream from the dam.
Background and construction
In 1940, with World War II raging across Europe, the United States government saw an urgent need to strengthen its military and defense infrastructure. This required a massive expansion of aluminum production facilities, many of which were located in the Tennessee Valley. To provide the necessary electricity, the Tennessee Valley Authority submitted a proposal for the construction of a new dam on the Holston River, the construction of a new coal plant and for the expansion of the generating capacity of the existing Wilson and Pickwick Landing dams to Congress in July 1940. Congress approved funds for the measure within a few days and President Franklin D. Roosevelt signed the measure into law on July 1, 1940. Construction on Cherokee Dam began the following day. The Cherokee project required the purchase of of land, nearly of which were wooded and required clearing. The project also required the relocation of 875 families, 51 cemeteries, and a historical tavern at Bean Station. The water supplies of Jefferson City and Morristown had to be modified, and of roadway had to be redirected. Fourteen new bridges were constructed and five existing bridges were raised above reservoir operating levels. Three earthen saddle dams, with a combined length of, were constructed to fill gaps in the ridge immediately south of the main dam. As Congress eliminated a number bureaucratic obstacles regarding delivery of materials, construction proceeded at a smooth and rapid pace. On December 5, 1941, construction was completed, the gates were closed, and the reservoir began to fill. Power generation began on April 16, 1942, less than two years after the dam was first proposed.
Operation and output
Cherokee Dam is a gravity-type concrete spillway dam consisting of nine crest gates and eight sluice gates. The combined capacity of the dam's four hydroelectric generators is 135,200 kilowatts. Cherokee Lake has a flood-storage capacity of. The reservoir operates up to an elevation of, and varies by in a typical year. The dam lacks navigational locks, although its design allows them to be added if the necessity for them should arise. While Cherokee's primary purpose is hydroelectric power production, like other TVA dams it also helps control flooding, which was rampant in the Tennessee Valley before the 1930s. Numerous recreational areas exist along Cherokee Lake, including Panther Creek State Park, several smaller parks, and 20 public boat launches. The Tennessee Wildlife Resources Agency regularly stocks the lake with walleye, crappie, and hybrid striped bass for recreational fishing. As the arrival of Hurricane Florence approached, the TVA released water at Cherokee from its spill gates. These spill gates were used for the first time since 1994.