City Centre Aquatic Complex


The City Centre Aquatic Complex is an indoor aquatic centre featuring an Olympic size swimming pool in the Town Centre area of Coquitlam, British Columbia. The building was designed by Vic Davies Architect Ltd., built at a cost of $8.2 million, and opened in March 1994. The interior is orange with rope railings around the wave pool. The pools use ozone for secondary water purification.
The 8-lane, 50-meter Olympic length swimming pool features:
The adjacent free form play area features:
In addition, the fitness centre is equipped with cardiovascular conditioning equipment, strength-training equipment, and free weights. The facility also includes a poolside café, viewing terrace, multi-purpose rooms, and a physiotherapy clinic.
The temperature in the pool area is kept at approximately 29.5 °C, while the fitness centre is air conditioned to a cooler temperature.