Clerk of works


The Clerk of Works, often abbreviated CoW, is employed by an architect or a client on a construction site. The role is primarily to represent the interests of the client in regard to ensuring that the quality of both materials and workmanship are in accordance with the design information such as specification and engineering drawings, in addition to recognized quality standards. The role is defined in standard forms of contract such as those published by the Joint Contracts Tribunal. "Clerks of works" are also the most highly qualified non-commissioned tradesmen in the Royal Engineers. The qualification can be held in three specialisms: electrical, mechanical and construction.
Historically, the Clerk of Works was employed by the architect on behalf of a client, or by local authorities to oversee public works. The CoW can also be employed by the client to monitor design and build projects where the traditional role of the architect is within the design and build project team.
Maître d'oeuvre is a term used in many Francophone jurisdictions for the office that carries out this job in major projects; the Channel Tunnel project had such an office. In Italy, the term used is direttore dei lavori.

Origins of the title

The job title is believed to derive from the 13th century when monks and priests were accepted as being more literate than the builders of the age and took on the responsibility of supervising the works associated with the erection of churches and other religious property. As craftsmen and masons became more educated they in turn took on the role, but the title did not change. By the 19th century the role had expanded to cover the majority of building works, and the clerk of works was drawn from experienced tradesmen who had wide knowledge and understanding of the building process.

The role

The role, to this day, is based on the impartiality of the clerk of works in ensuring that value for money for the client - rather than the contractor - is achieved through rigorous and detailed inspection of materials and workmanship throughout the building process. In many cases, the traditional title has been discarded to comply with modern trends, such as site inspector, architectural inspector and quality inspector, but the requirement for the role remains unchanged since the origins of the title.
The clerk of works is a very isolated profession on site. He/she is the person that must ensure quality of both materials and workmanship and, to this end, must be absolutely impartial and independent in decisions and judgments. He/she cannot normally, by virtue of the quality role, be employed by the contractor - only the client, normally by the architect on behalf of the client. His/her role is not to judge, but simply to report all occurrences that are relevant to the role.
Clerks of Works are either on site all the time or make regular visits. They must be vigilant in their inspections of a large range of technical aspects of the work. This involves:
The ICWCI - motto: Potestate, Probitate et Vigilantia - is the professional body that supports quality construction through systematic inspection. As a membership organisation, it provides a support network of meeting centres, technical advice, publications and events to help keep members up to date with the ever-changing construction industry.
Post-nominals for members are FICWCI, MICWCI and LICWCI.

History

The Institute was founded in 1882 as the Clerk of Works Association, becoming the Incorporated Clerk of Works Association of Great Britain in 1903. In 1947, its name was amended again to the Institute of Clerks of Works of Great Britain Incorporated, a title it retained until 2009 when it was expanded to the Institute of Clerks of Works and Construction Inspectorate of Great Britain Incorporated.
The organisation was founded to allow those who were required to operate in isolation on site, a central organisation to look after the interests of their chosen profession, be it through association with other professional bodies, educational means or simply through social intercourse among their own peers and contemporaries. Essential to this, as the Institute developed, was the development of a central body that could lobby Parliament in relation to their profession, and the quality issues that it stands for.
Though the means of construction, training of individuals, and the way individuals are employed have changed dramatically over the years, the principles the Institute originally formed for remain sacrosanct. Experience in the many facets of the building trade is essential and, in general terms, most practitioners have come from the tools, though further third level education in the built environment is essential.

'Building on Quality' Awards

The Institute of Clerks of Works and Construction Inspectorate hold the biannual Building on Quality Awards, and nominations are accepted from all involved in quality site inspection regardless of whether they are members of the Institute. Judging is based on the Clerk of Works' ability, his/her contribution to the projects he/she is involved with, his/her record keeping and reports, and his/her commitment to the role of Clerk of Works.
Awards given in each category are Overall Winner, Highly Commended and Commended. The Overall Winner is chosen from all categories and is widely considered the highest accolade that can be awarded to a clerk of works in recognition of his work. Newly introduced in 2013 was the Peter Wilson Memorial trophy, which has now had two deserving recipients. The trophy was donated by the Cumbria and North Lancashire Chapter to the ICWCI in memoriam of Vice President Peter Wilson FICWCI.
2019 Award Winners
2017 Award Winners
2015 Award Winners
2013 Award Winners
2011 Award Winners:
2009 Award Winners:
Cumbria and North Lancashire, Deeside, Devon and Cornwall, Dublin, East Anglia, East Midlands, East of Scotland, Gibraltar, Home Counties North, Hong Kong, Isle of Man, London, Merseyside, North Cheshire, North East, Northern, Northern Ireland, Nottingham, Scotland, South Wales, Southern, Staffordshire and District & Western Counties

Clerk of Works in Canada

The earliest record of a Clerk of Works in Canada was John Mactaggart who was the Clerk of Works for the Rideau Canal project in 1826. John MacTaggart was a British civil engineer and the chief clerk of works in charge of the project, reporting to Lt. Col. John By. John Morris is a notable Clerk of Works from the mid 1800s completing several notable projects such as University College, Univ. of Toronto,, Parliament Building, the Departmental Buildings, and for Government House.
During the renovations to Pembroke City Hall, W.J. Moore was Clerk of the Works for the addition in 1912 and J.L. Morris for the alterations in 1914.