In 1923 Ipswich power station comprised two 3 MW turbo alternators and one 225 kW reciprocating machine providing a 3-phase, 50 Hz, 230 and 400 Volt AC supply. In addition there were two 1 MW turbines and one 500 kW reciprocating machines generating a 230 and 460 Volt DC supply. The generators were powered by 93,500 pounds per hour of steam. In 1923 the maximum load on the system was 3,867 kW from 13,349 consumers. A total of 5.750 GWh of electricity was sold in 1923 for £67,198. This produced a surplus of revenue over expenses of £35,773. Upon nationalisation of the British electricity supply industry in 1948 the ownership of Ipswich power station was vested in the British Electricity Authority, and subsequently the Central Electricity Authority and the Central Electricity Generating Board. At the same time the electricity distribution and sales responsibilities of the Ipswich electricity undertaking were transferred to the Eastern Electricity Board. In 1961 Ipswich power station had an installed electricity generating capacity of 17.25 MW. This was from one 6.25 MW, one 5 MW and two 3 MW Brush-Ljungstrom turbo-alternators. A DC supply was available from two 2 MW and one 1 MW Mather Platt and one 1.5 MW British Thomson-Houstonrotary converters. The three Babcock and Wilcox chain grate boilers produced steam at a rate of 162,000 lb/hr at a pressure of 250 psi and 338°C. The station used water from the rivers Orwell and Gipping for condensing and cooling. In 1961 the thermal efficiency of the station was 6.09 per cent. The electricity output over the period 1954-66 was as follows.
Year
Output GWh
1954
6.38
1955
8.98
1956
11.03
1957
7.28
1958
2.12
1961
0.214
1962
1.117
1963
5.628
1964
2.731
1965
9.068
1966
8.622
Ipswich power station was decommissioned in 1967.
Cliff Quay
Cliff Quay power station was sanctioned in March 1939 and construction commenced in June 1945 undertaken by the Ipswich Corporation. Upon nationalisation on 1 April 1948 ownership and construction became the responsibility of the British Electricity Authority. The first generating set was commissioned in March 1949 and the following sets in June 1949, September 1949, May 1950, December 1950 and September 1952. Cliff Quay power station was built on a 104 acre site on the north bank of the River Orwell 2 miles south of Ipswich. The area included 17 acres of foreshore reclaimed as a coal store and 40 acres reclaimed as an ash lagoon.
Specification
The station had a total installed generating capacity of 276 megawatt and comprised six 46 MW turbo generators made by Metropolitan-Vickers. The station's nine boilers were made by Babcock Power Ltd, and burned pulverised bituminous coal. The boilers produced steam at a total rate of 3,285,000 lb/hr at a pressure of 600 psi and 441°C. River / sea water was used for condensing and cooling. In 1961 the thermal efficiency of the station was 25.28 per cent. The electricity output of the station in GWh over the period 1954-84 was as follows.
Closure
A fire in September 1982 caused major damage to the station. It finally closed in 1985. The station was then demolished in November 1994. The station was demolished by MJ Finnigan & Co. In 1997, a 7,500 square metre bulk storage shed was built on the site of the power station.