DeRoI-class locomotive (Toshiba)


The Toshiba DeRoI-class was a group of nine boxcab-style electric locomotives with regenerative braking and the capability for multiple-unit control manufactured by built by Toshiba in 1943-1944. They were very similar to the Mitsubishi-built DeRoI-class locomotives and the DeRoNi-class locomotives built by Hitachi. They were built for the Chosen Government Railway, and after the partition of Korea were inherited by the Korean State Railway of North Korea, where they were known as the Chŏngiha class.

Description

The first electrified railway in Korea was the narrow gauge streetcar line in Seoul running from Seodaemun to Cheongnyang-ni via Cheongno and Dongdaemun, which was opened on 18 April 1898 by the Hanseong Electric Company. This was actually the first railway of any type in Korea, having preceded the Gyeongin Railway from Noryangjin to Jemulpo, which opened on 18 September 1899. The first electrified standard gauge mainline railway in Korea was the privately owned Geumgangsan Electric Railway, which on 1 August 1924 opened a line from Cheorwon to Geumhwa electrified at 1,500 V DC. Later, the line was extended from Cheorwon to Naegeumgang; the extension was opened on 1 July 1931.
The Government-General of Korea began working on a national electric power policy in November 1926, and the resulting plan was completed in December 1931. Chapter 4, "Utilising Electricity in Transportation in Korea" dealt with the electrification of Korea's railways. In 1937, a plan to electrify the Bokgye–Gosan section of the Gyeongwon Line, the Jecheon–Punggi section of the Gyeonggyeong Line and the Gyeongseong–Incheon Gyeongin Line was submitted to the Imperial Diet, which approved it in 1940. Sentetsu issued its requirement for an electric locomotive in 1938, beginning discussions with Mitsubishi in that year regarding the implementation of the electrification plan. Part of the Railway Bureau's goal with the electrification plan was to set a new world speed record, and to go with that, a state-of-the-art locomotive was desired. The project entailed many Japanese firsts, including the first use of 3,000 V electrification, and, specific to the DeRoI class locomotive, the first use of regenerative brakes. The resulting design was very similar to the EF12 class of the Japanese National Railways.
When the electrification of rail lines in Korea was begun in 1943, Sentetsu ordered twenty DeRoI class locomotives of 135 tons - sixteen from Toshiba and four from Mitsubishi. The original class name, デロイ, comes from the Sentetsu classification system for electric locomotives: DeRoI = De, for "electric", Ro, to indicate six powered axles, and I, indicating the first class of electric locomotive with six powered axles.
Though generally quite similar in appearance to the Hitachi-built DeRoNi class and the Mitsubishi-built versions of the DeRoI class, there were a number of features that distinguished the Toshiba-built DeRoI class from the others. These were: unequal spacing of side windows; a distinctive ventilator shape; and a distinctive arrangement of the deck railings.
Although the major design work of the type was undertaken by Mitsubishi, the first DeRoI-type locomotives delivered to Sentetsu were those built by Toshiba; the first four were built by Kisha Seizō using Toshiba electrical components. DeRoI-1 arrived at Busan in December 1943, where it was assembled at Sentetsu's Busan works before being sent to Gyeongseong, where it was displayed for the public. As none of the planned electrification of Sentetsu lines had been completed yet, the first tests were carried out at Cheorwon Station, under the 1,500 V electrification of the Geumgangsan Electric Railway. The sixteen units ordered from Toshiba were intended for use on the Kyŏngwŏn Line; however, only five had been delivered by the end of the Pacific War - numbers 1 through 3 were built in 1943, numbers 4 and 5 in 1944 in Tokyo ordered the delivery of three Mitsubishi-built and seven Toshiba-built DeRoI class locomotives to Korea as reparations; these were all delivered to the South. DeRoI 6 had been completed in November 1944 and taken to the port at Kobe, Japan, for delivery, but was subsequently returned to the factory; this became the first of the ten new locomotives to be delivered to Korea, in March 1946. Numbers 7 through 9 were built and delivered in 1947, while the last three, numbers 10 through 12, were completed in 1949; however, after the outbreak of the Korean War and the destruction of the electrification in the south, these three units were scrapped in Japan, never having been delivered. Of the locomotives delivered after the partition, all but one were eventually captured by the North Korean army and taken to the North; the eighth unit had been in storage at Pusan, and was scrapped in 1958 without ever having been used. Thus of the 16 units actually built, 15 ended up in the North.
Plans were made for Toshiba to build some DeRoI class locomotives for the Soviet Union as war reparations, but due to the escalation of the Cold War after 1949, these were never built.
As the Korean War caused the destruction of the electrification of North Korea's rail lines, they sat disused until 1956. In that year they were reclassified Chŏngiha class and numbered 전기하1 through 전기하9, and were refurbished at the engine shops at Yangdŏk for use on the Yangdŏk-Ch'ŏnsŏng section of the P'yŏngra Line, which had been electrified in 1956 as the first stage of North Korea's electrification plans.
Originally painted brown, they were repainted in 1958-59 in the light blue over dark green livery to match the scheme that was made standard with the introduction of the Red Flag 1 class electric locomotives. At some point, the original pantographs were replaced with pantographs of the type used on the Red Flag 1 class locomotives.
As of 2011 at least one, Chŏngiha 3, is still operational, based at Kowŏn. This unit was inspected by Kim Il-sung and, as such, it is kept in a pristine state as a "historic monument of the Revolution".

Construction

Gallery