The bank extends over about, and is about in extent. The water depth ranges from, about shallower than the surrounding sea. The bank is an important fishing area, with cod and herring being caught in large numbers. It gives its name to the Dogger sea area used in the BBC Radio 4Shipping Forecast. Several shipwrecks lie on the bank. Dogger Bank has been identified as an oceanic environment that exhibits high primary productivity throughout the year in the form of phytoplankton. As such, it has been proposed by various groups to designate the area a Marine Nature Reserve.
Geology
Geologically, the feature is most likely a moraine, formed during the Pleistocene. At differing times during the last glacial period it was either joined to the mainland or an island. The bank was part of a large landmass, now known as Doggerland, which connected Britain to the European mainland until it was flooded some time after the end of the last glacial period. Fishing trawlers working the area have dredged up large amounts of moorpeat, remains of mammoth and rhinoceros, and occasionally Palaeolithic hunting artefacts. The 1931 Dogger Bank earthquake took place below the bank, measuring 6.1 on the Richter scale and was the largest earthquake ever recorded in the United Kingdom. Its hypocentre was beneath the bank, and the quake was felt in countries all around the North Sea, causing damage across eastern England. South of Dogger Bank is the Cleaver Bank.
Battle of Dogger Bank, during the Fourth Anglo-Dutch War, a Royal Navy squadron fought a Dutch squadron on 5 August 1781.
Dogger Bank incident, during the Russo-Japanese War, Russian naval ships opened fire on British fishing boats in the area of Dogger Bank on 21 October 1904, mistaking them for Japanese torpedo boats.
The Dogger Bank is an attractive location for offshore wind farms because it is far away from shore, avoiding complaints about the visual impact of wind turbines, yet the water is shallow enough for traditional fixed foundation wind turbine designs. Fixed-foundation wind turbines are economically limited to maximum water depths of ; at greater water depths new floating wind turbine designs are required, which currently cost significantly more to build. In January 2010, a licence to develop a wind farm on Dogger Bank was granted to Forewind Ltd, a consortium of developers. Originally projected to develop up to 9 gigawatts of power as part of a planned nine zone project of 32 gigawatts, the plan was later scaled down to a 7.2-gigawatt installation in agreement with the area's owner Crown Estates. Construction was scheduled to start around 2014 at the earliest, but has been repeatedly postponed. Dutch, German, and Danish electrical grid operators are cooperating in a project to build a North Sea Wind Power Hub complex on one or more artificial islands to be constructed on Dogger Bank as part of a European system for sustainable electricity. At the North Seas Energy Forum in Brussels on 23 March 2017, Energinet.dk will sign a contract to work with the German and Dutch branches of TenneT; thereafter a feasibility study will be produced.