Double tee


A double tee or double-T beam is a load-bearing structure that resembles two T-beams connected to each other side by side. The strong bond of the flange and the two webs creates a structure that is capable of withstanding high loads while having a long span. The typical sizes of double tees are up to for flange width, up to for web depth, and up to or more for span length. Double tees are pre-manufactured from prestressed concrete which allows construction time to be shortened.

History

The first application long-span double tees was on a two-story office building in Winter Haven, Florida, designed and built in 1961 by Gene Leedy. Leedy experimented when building his architectural office by using structural elements of prestressed concrete and designing the new "double-tee" structural elements. In their early days, the applications of double tees were limited to multi-story car park structures and roof structures of buildings, but they have now been used in highway structures as well.

Manufacturing process

Double tees are manufactured in factories. The process is the same as in other prestressed concrete manufacturing by building them on pretensioning beds. The beds for making double tees are of the typical sizes of the area that double tees will be used. In most cases, the lengths of the pretensioning beds are of about long.

Applications

Roofing

In non-residential buildings, the roof structure may be flat. Structural concrete is an alternative for flat roof construction. There are three main categories for such method: precast/prestressed, cast-in-place and shell. Within the precast/prestressed concrete roofing, the double tees are the most common products used for roof span up to.

Parking structures

Modern multi-story parking structures are built from precast/prestressed concrete systems. The floor systems are mostly built from pre-topped double tees. This system evolved from the earlier use of tee systems where the flanges of the T-beams were connected. The concrete is then poured at the top of the tees during the construction to create the floor surface, hence the process is called field-placed concrete topping. In double-tee structures, the top concrete is usually made at the factory as an integral part of the precast double tee structure. Double tees are connected during the construction without topping with concrete to create the parking structure floor surface.
A benefit of pre-topped double tees is a higher quality concrete for more durable surface to reduce traffic wears. Factories can produce the topping with minimum concrete strength of 5,000 psi. In some areas, the strength can be 6,000-8,000 psi. This compares to the field-placed concrete topping with the lower concrete strength of 4,000 psi.
Typically, the double-tees are hung over a supporting structure. This is done by having dapped ends at the webs of the double tee. The dapped ends are sensitive to cracking at the supporting area. A recommendation to prevent cracking is to include reinforcing steel in the double-tee design to transfer the loads from the bearing area to the full-depth section of the web. In case that the cracks are developed after the parking structure is already in use, other methods to provide external support to the double-tees are needed. One of such alternatives is to use externally bonded carbon fiber reinforced polymer to provide reinforcement.

Bridges

Prefabricated bridge designs have been used in many bridge constructions to reduce the construction time. In the United States, there are efforts to come up with Prefabricated Bridge Elements and Systems in many states. Double tee structure is an alternative for short to medium spans between. There are many standards such as double-tee beam of Texas Department of Transportation and the Northeast Extreme Tee Beam of the Northeast.
A benefit of using double tees for bridge replacements is to shorten the construction time. Texas has a goal of shortening short-span bridge replacements to one month or less instead of 6 months in traditional bridge constructions.
NEXT Beam development started in 2006 by the Precast/Prestressed Concrete Institute North East to update regional standard on Accelerated Bridge Construction. The NEXT Beam design was inspired by double-tee designs that have been used to build railroad platform slabs. The use of double tees with wide flange allows to have less number of beams and to have them stay in place to form the deck, resulting in a shorter construction time. The first design was introduced in 2008 called "NEXT F" with flange thickness requires topping. This was used for the construction of the Maine State Route 103 bridge that crosses the York River. The seven-span long bridge was completed in 2010 as the first NEXT Beam bridge. The second design was introduced in 2010 for Sibley Pond Bridge at the border of Canaan and Pittsfield, Maine. The design was called "NEXT D" with flange thickness that does not require deck topping allowing the wearing surface can be applied directly on to the beams. The combination of F and D called "NEXT E" was introduced in 2016.
Concerns of using double tees in bridge constructions include bridge deck longitudinal cracks. As the connection points between the double tee beams are longitudinally along the traffic flow, any lateral movements of double tees can cause the road surface to crack longitudinally. These include differential rotation of double-tee flanges that can cause asphalt surface to raise or crack. A separation of the flanges can cause asphalt to sag into the gap forming a reflective crack. To reduce these problems, many methods have been developed to manage the lateral connections of the double tees. The materials used in the connections are backer rods, steel bars, welded plates, and grouts.