Dowlow Halt railway station


Dowlow Halt was opened in 1920 between Dowlow and Greatlow to the south east of Buxton, Derbyshire on the London and North Western Railway line to Ashbourne and the south.

History

The line utilised part of the Cromford and High Peak Railway joining it near Hindlow and proceeding to a branch to Ashbourne at Parsley Hay.
After leaving Hindlow the line began to climb at 1 in 60 through Hindlow Tunnel to Brigg's Sidings and its summit at Dowlow Halt. at the summit, this was the highest main line in England at the time. From Dowlow Halt the line travelled downhill at a gradient of 1 in 60 to Hurdlow.
Brigg's Sidings served Messrs. Briggs and the Dowlow Lime and Stone Company.
The halt itself was unstaffed with two short stone platforms and without buildings, since it was initially used by workmen's trains for the nearby works. It was opened for public services in November 1929. Passenger services on the line finished in 1954.
One section still exists, serving Buxton Lime Industries, and terminating a short distance further on at the Lafarge Dowlow sidings.

Route