The road is in a bad state on several parts of the route, partly due to damage because of the Suriname Guerrilla War. Various revitalization projects have been started.
Western East-West Link
A 32-kilometre-long section between Nieuw Nickerie and the ferry near South Drain was not paved until recently. The European Union funded the reconstruction, which started in 2007, with 13.2 million euro. The section was due to be completed in the first quarter of 2010. There is a jeep trail between South Drain and Apoera, connecting the Northern East-West Link with the Southern East-West Link. Contrary to earlier plans, the pavement of this road is not imminent.
Eastern East-West Link
The eastern part of the East-West Link, that is the section between Meerzorg and Albina, is being repaved with funds from the European Union, the Agence française de développement and the Inter-American Development Bank. In August 2009, a Project Executing Unit was installed, whose task it is to safeguard quality guidelines, project planning, and the total budget of USD 140 million. The project entails a total section of 138 kilometres and the rehabilitation is planned to be finished in 30 months’ time. The reconstruction will adhere to the standards of the Initiative for the Integration of the Regional Infrastructure of South America. In March 2010, the Dutch company MNO Vervat was to begin repaving the road between Tamanredjo and Moengo. The section between Moengo and Albina will be repaved by the Chinese company Dalian. The tender for the section between Meerzorg and Tamanredjo will be put out in 2011. The road will be widened in several places and cycling lanes will be added in built-up areas.
Southern East-West Link
Suriname aims for reconstructing the Southern East-West Link between 2010 and 2015. In the IIRSA project, this road is part of Group 3 of the Guyana Shield Hub region, which links Ciudad Guayana in Venezuela via San Martín de Turumbang, Linden and Apoera with Paramaribo. The project includes the building of a bridge on the Courantyne River between Apoera and Orealla in Guyana. According to a study by Pitou van Dijk, the Linden-Paramaribo section has only secondary priority with IIRSA at the moment.
Connections with neighbouring countries
The East-West Link has a ferry connection with Guyana on the western side since 1998, connecting South Drain with Moleson Creek. In the east there has been a ferry between Albina and Saint-Laurent-du-Maroni in French Guiana since 1969. Within the framework of the IIRSA, the Suriname Planning Bureau has done some studies on the incorporation of the East-West Link in the Pan-American Highway. Suriname has been part of the Pan-American Highway project since 1982. Apart from the reconstruction of the East West Link as described above, a feasibility study has been started for a bridge between Suriname and French Guiana. Also a North-South Link connecting Suriname with Brazil via the Vier Gebroeders mountains is being considered.