The East Anglia Zone is in the North Sea off the east coast of East Anglia. It is one of nine offshore zones belonging to the Crown Estate which formed part of the third licence round for UK offshore wind farms. At the closest point the zone is 14 km from shore. East Anglia Offshore Wind is a partnership between ScottishPower Renewables and Vattenfall. In December 2009, EAOW was announced as the developer for the East Anglia Zone. The target capacity for the entire East Anglia Zone is 7200 MW which could require up to 1200 turbines. Up to six individual projects could be set up in the area. The first project is the East Anglia ONE windfarm, which was commissioned in July 2020. EAOW has also announced plans for further projects named East Anglia TWO and THREE.
East Anglia ONE
East Anglia ONE is located in the southern area of the East Anglia Zone, and is approximately 43 km from the shore. The initial proposal was to achieve an installed capacity of 1200 MW. Cabling for East Anglia ONE will land near the River Deben at Bawdsey and run north of Ipswich, and then be connected to the National Grid at Bramford. A plan was formally submitted to the government in December 2012, and planning consent was granted in June 2014. In October 2014 ScottishPower announced that it intended to scale down East Anglia ONE because of insufficient subsidies. In February 2015 it was announced that ScottishPower would proceed with a scaled-down 714 MW project. A contract for £119/MWh was published on 27 April 2016, using 102 Siemens Wind Power gearless turbines of 7 MW each. Nacelles will be built in Cuxhaven, while blades are to be made in Hull. Due to water depths between 30-40 m, the turbines will use jacketed foundations. Cabling is to be at 66 kV as opposed to the traditional 33 kV. Two export cables at 220 kV AC send the power to shore.
Construction
Onshore construction began in 2017, with offshore construction starting in 2018. The first foundation was completed in June 2018 and the first turbine was completed in June 2019. The windfarm's offshore substation was installed in August 2018. First power was generated in September 2019, turbine installation was completed in April 2020, and commercial operation began in July 2020.
East Anglia TWO
The East Anglia TWO wind farm is proposed to be 31km off-shore from Lowestoft and to have a generating capacity of 900MW. It is planned to be ready by 2030.
East Anglia THREE
The proposed East Anglia THREE wind farm is located in the northern half of the East Anglia Zone, and is approximately 69 km from the shore. It is expected to provide an installed capacity of 1200 MW from up to 172 turbines.