East Rail line


The East Rail line is one of eleven rapid transit lines of the Mass Transit Railway system in Hong Kong. It used to be one of the three lines of the Kowloon–Canton Railway network. It was known as the KCR British Section from 1910 to 1996, and the KCR East Rail from 1996 to 2007. The East Rail was the only railway line of the Kowloon-Canton Railway Corporation before the construction of KCR West Rail.
The railway line starts at Hung Hom station in Kowloon and branches in the north at Sheung Shui to terminate at Lo Wu or Lok Ma Chau stations. Both are border crossing points into Shenzhen. All of the stations are at- grade or elevated before the opening of Shatin to Central Link which will provide underground track. The distance between Hung Hom and Lo Wu stations is. The total distance of the line is approximately, making it the longest line in total distance within the system network. The line is coloured light blue on the MTR map.
The same railway is used for passenger and freight services crossing the boundary to other cities, including Guangzhou, Shanghai and Beijing. These longer distance passenger services start at Hung Hom and end at their termini in the mainland. The line is generally double tracked and electrified, except for certain goods sheds. Immigration and customs facilities are available at Hung Hom and Lo Wu/Lok Ma Chau stations.
The railway line was operated by KCRC prior to the MTR-KCR merger and has since been taken over by MTR Corporation on 2 December 2007 after the merger was completed. KCRC continues to own the line and its infrastructure while leasing its operations to MTRC.
A southern extension is under construction which will take the line under Victoria Harbour to a new terminus,
Admiralty station, on Hong Kong Island. The extension, the centrepiece of the Sha Tin to Central Link expansion project, is due to be ready for service by 2022.

History

Background

Proposal

The United Kingdom and China signed an agreement to cooperate on the construction of a railway from Kowloon to Canton. The whole project was 87 miles long, with 22 miles in the British Section and 65 miles for the Chinese Section. However, the English could earn 65% of the income while China could only earn 35% of it. Construction started in 1906. The most difficult section was the approx. 7200 feet long Beacon Hill Tunnel, and about a hundred workers died in the construction.

Construction

The construction was mainly done by Chinese. The government built camps in Kowloon to support the construction. Most of the railway were flat land, so construction was relatively easy in those places. However, the construction of the Beacon Hill Tunnel involved digging and blasting, and the rocks made construction difficult. The two ends were of soft soil, but the centre was granite. This caused a huge delay in construction as it was not suitable to use explosives at the two ends while the explosives could not blast off a lot of rock in the centre.

Pre-electrification era

Opening of British section

The railway line to the Chinese border, then called the Kowloon-Canton Railway, opened for passenger services on 1 October 1910. The remaining section from Lo Wu to Canton was called the "Chinese Section". Initially, service was only provided from Yau Ma Ti station to Fanling station with a tunnel through Beacon Hill.

Opening of Chinese sector

After the "Chinese Section" was completed, through train service became available to Canton, through Sham Chun. Lo Wu station also serves as a border crossing, with a bridge across the Sham Chun River, the natural border between Hong Kong and Mainland China. Trains had to stop at Lo Wu station after Communist China closed the border and suspended the through train service in 1949.
The line was generally single track, with a passing loop at each station.

Closing of Sha Tau Kok Branch

The line was originally built with narrow gauge tracks, but just before opening standard gauge track was laid and the original tracks were used to build a branch line, the Sha Tau Kok Railway from Fanling to Sha Tau Kok. This branch was unsuccessful and closed on 1 April 1928 following the opening of a road that ran parallel to the tracks.

Post-1930s

Through the years, more stations were added to the line. Sheung Shui station was opened in the 1930s, and Ma Liu Shui station opened in 1955.
The KCR engines were powered by steam engines before the 1950s. There were 20 engines. However, diesel engines were purchased starting from 1950, with the first one with number 51. Steam engines then disappeared from KCR.

Change of terminus

The development of the towns along the line began to grow immensely during the 1970s, prompting a modernisation of the Kowloon-Canton Railway. The original Kowloon station terminus at Tsim Sha Tsui was too small and had no room for expansion, so a new terminus site was chosen in Hung Hom, then known as Kowloon station. The new Kowloon station replaced the old one in 1975. Today, the clock tower is the only structure left from the old terminus, and is a landmark near the Cultural Centre, Space Museum and the Star Ferry pier. Six pillars were relocated to the Urban Council Centenary Garden in Tsim Sha Tsui East. A big bell is stored at Ho Tung Lau. The original Hung Hom station at Chatham Road South was also demolished.

1980s modernisation

In 1975, the KCR asked two consultancies, Sofrerail and Transmark, to make proposals on the modernisation of the line. In 1979, Transmark's proposal to double-track and electrify the entire line for $2.5 billion was accepted by the government. This work involved building a new tunnel through Beacon Hill as the existing tunnel was not wide enough to accommodate two tracks. New stations were added, including Kowloon Tong station, which was completed in 1982 to provide an interchange with the new MTR network. Tai Po Kau station and the original Tai Po Market station were closed, with the latter being redeveloped into the Hong Kong Railway Museum. The development finished in sections between 1982 and 1983, with new Metro Cammell EMUs, manufactured by Metro-Cammell in England, replacing diesel locomotives.
With the modernisation of the railway and the concurrent urbanisation of the New Territories, ridership rose quickly, from a daily average of 190,000 in 1983 to 491,000 in 1990. A temporary station in Tai Wai opened in 1983 while the permanent Tai Wai station was completed in 1986. Fo Tan station opened in 1985 to serve the expanding industrial estate. Tai Wo station opened in 1989 to serve Tai Wo Estate.
The 1990s saw more rapid development and changes within the railway. The Kowloon-Canton Railway Corporation signed a contract with Anglo-French manufacturing giant GEC-Alsthom to refurbish the Metro-Cammell EMUs at the East Rail depot at Ho Tung Lau. In 1996, the first refurbished train was put into service, and trains now allow passengers to traverse from one end to another, when trains once ran on four three-car EMUs. All but three of the 351 railcars were refurbished except for unit E44, which is currently stored in Ho Tung Lau depot. Each set is still made up of 12 cars. Prior to the rule proclaimed in 1994 which fixed the number of cars on each set to 12, trains were inconsistent in terms of length, ranging from six cars, nine cars to 12 cars.
In terms of appearance, trains no longer have the monotonous design of having a red stripe running across the middle from the cab to the end; the doors now have a red coating, and the window panes along with the upper part are fashioned with blue paint. The original design of the train front, encapsulating the driver's cab and commonly referred to as the "Yellow-cab", was replaced with a more modern design capped with a silver coating, and a digital display added providing the train's destination.
The design of the EMU was modified as well: four more sets of doors being added to each car, adding up to a total of ten sets of doors, each side with five; the introduction of new passenger information plasma display; and more standing space by rearranging seating patterns from the traditional back-to-back seating to a longitudinal design. The yellow-cab train was formally retired with a "Farewell Ride" on 31 October 1999.
In 1998, a new signalling system, known as Transmission balise-locomotive, came into operation on the line. This Automatic Train Protection system, a replacement for the previous Automatic Warning System developed in Britain, ensures a safe distance is maintained between trains. It also allowed an increase in train frequencies from 20 to 24 per hour each way. The control centre was also relocated from Kowloon station to a new facility in the KCRC operations headquarters building at Fo Tan Railway House. Also as part of the ATP project, a two kilometre section of the tracks near the Pak Shek Kok reclamation, curving around the former coastline, was straightened out during the mid-1990s. The tracks now run alongside the Tolo Highway. A vestige of the former alignment, an old bridge beside Cheung Shue Tan village built between 1906 and 1909, was identified by the Antiquities and Monuments Office in 2008 as a historic asset.
In 2002 an automatic train operation system was added to TBL, which controls the speed of the train for the driver and ensures that all trains will stop when arriving at every station. Under normal circumstances, most trains are operated in ATO mode except for scenarios such as operation of trains in and out of train depots, driver training, or at times when the ATO system fails to function properly. However, intercity trains using the East Rail line continue to operate on AWS.

Recent developments

Tunnels on the East Rail line have numbers assigned to them. When the railway was first opened, there were five tunnels:
  1. North of today's Mong Kok East station
  2. Beacon Hill Tunnel
  3. South of where University station stands today
  4. North of University station
  5. At Tai Po Kau
During the construction of the Cross Harbour Tunnel, which opened in 1972, the section of tracks near Oi Man Estate, Ho Man Tin was covered to construct the section of Princess Margaret Road connecting to the Cross Harbour Tunnel. A new tunnel was therefore created and given the number 1A.
During the modernisation of the line in the early 1980s, Tunnels 1, 3, 4 were removed by demolishing the mounds above them. Tunnel 1A already had double track width when built; a completely new Beacon Hill Tunnel was constructed and took over the original one; and Tunnel 5 was doubled. The new one is known as Tunnel 5A.

Rolling stock

Two types of commuter trains currently run on the East Rail line, the 29 refurbished Metro-Cammell EMUs and eight sets of the newer SP1900 EMUs, manufactured by Kinki Sharyo of Japan in 2003. Both models share same exterior color scheme, door arrangement, as well as consisting of 12 carriages per train including a first class section. The interior design between the two models is different, and the transverse seating near the ends of the Metro-Cammell carriages has been replaced with longitudinal seating in the Kinki Sharyo models to allow for a wider gangway between compartments. All of the East Rail line Metro-Cammell trains are maintained at MTR Ho Tung Lau Depot in Sha Tin District.
With the construction of the Sha Tin to Central Link, which cannot accommodate trains of greater than nine cars, the MTR decided in December 2012 to phase out all of the aging Metro-Cammell trains between 2018 and 2020 and replace them with 37 sets of 9-car R-Stock trains built by Hyundai Rotem of South Korea. The first new train arrived in Hong Kong in September 2015 and would enter service in mid-2020, fully replacing the current fleet in time for the opening of the Hung Hom to Admiralty Section of the Sha Tin to Central Link.
As for the SP1900 EMUs, they will also be withdrawn from the East Rail line by 2018 and, together with the SP1900/1950 sets on the West Rail and Ma On Shan lines, will be reconfigured as 8-car trains to serve the future East West Corridor. The conversion project is taking place at MTR's Pat Heung Depot and converted sets will be placed into service on the West Rail and Ma On Shan lines alongside newly-delivered CRRC Changchun EMUs until the Kowloon extension is ready for service in 2019. The SP1900 first class cars will be shipped back to Kinki Sharyo factory in Osaka, Japan for conversion into standard-class compartments.

First class

East Rail line is the only railway in Hong Kong to offer first class commuter service. One of the 12 cars of each train is furbished as a first class carriage. These compartments have softer and wider seat arrangements; however, standing in the first class car is common during rush hour.
Riding on this carriage costs twice that of a standard-class journey and passengers are required to buy the first class ticket or revalidate their Octopus cards on the first class reader before entering the first-class car. Ticket Inspectors will perform random checks on train, and failing to produce a valid first class ticket or validated Octopus Card will be liable to a surcharge of $500.

Safety problems

The East Rail line is Hong Kong's oldest heavy railway. While generally regarded as very safe, the railway suffered some serious incidents during its history.

Train accidents

At about 11:00 on 14 June 1923, a train derailed at Ma Liu Shui due to a landslide following heavy rain. The locomotive and one coach derailed and slid down the embankment to the edge of Tide Cove. Nobody was injured.
The same locomotive involved in the 1923 incident was involved in a more serious derailment on 20 April 1931. Owing to heavy rains, an embankment at Ma Liu Shui south of today's University station was weakened. It collapsed as a Kowloon-bound train passed over it at about 17:10, causing the locomotive and four carriages to crash and pile atop one another. There were 12 deaths and eight serious injuries.
On 12 November 1955 a fatal accident occurred at Mile 17¼, the site of a private military level crossing. A speeding passenger train struck a British military "Comet" tank at the crossing. A new diesel electric locomotive, the Sir Alexander, derailed. Various other carriages were severely damaged. The train guard and a member of the tank crew were killed.
At 15:00 on 18 December 1980, a contractor building Mong Kok station accidentally severed signalling cables, disabling the automatic signalling system. At this time, the railway had been only partly doubled-tracked, and still made use of the old single-track Beacon Hill Tunnel. Later in the day, two trains were inadvertently put on a head-on collision course just south of the tunnel. At 18:40, a Lo Wu-bound train carrying about 1,500 passengers reached the point where the double-tracked section of the railway ended ahead of the tunnel, near Yau Yat Chuen. A safety device, a trap point, prevented the collision by forcing the train to derail, causing minor injuries to some passengers. A minute later, a southbound train came to a screeching halt at the accident site. A KCR spokesman blamed "a misunderstanding in a telephone communication".
On 25 November 1984, a train derailed between Sheung Shui and Lo Wu stations. The incident occurred when the driver, meaning to back the train up to Sheung Shui station, failed to follow a speed/stop signal while the train was exceeding the speed limit. The train was being driven from the rear cabin, with the driver relying on signals from the train guard who was in the front carriage. The train sped past a danger signal onto a siding at 30 km/h, rather than shunting onto the main line at 10 km/h as it was meant to. It crashed into a concrete buffer at the end of the siding, with the first two cars piling on top of each other. The damage was so severe that the cars never returned to service. Passengers had been unloaded prior to the crash while the two KCR employees escaped significant injury. However, the accident caused train services to be suspended for the rest of the day and the incident spurred a series of public outcries concerning railway safety. The KCR determined that the accident occurred due to human error and not any system failure, suspended the driver, and changed procedures such that drivers were required to operate the train from the front carriage while shunting at Sheung Shui.
In 1988, there were numerous separate incidents of Chinese freight trains derailing on the railway. On 28 May, a locomotive and a goods wagon jumped the tracks near Fo Tan station, blocking the line. Services were temporarily detoured through Racecourse station. On 4 June, a wagon derailed near University station, again blocking the line. Coupled with a lorry accident in the Lion Rock Tunnel the same day, Kowloon and Sha Tin were thrown into "traffic chaos". On 2 July, another goods wagon derailed on a siding in Lo Wu after arriving from Shenzhen. As it was being hauled to the Fo Tan workshop at 1:44 am the following day for examination, it derailed again, though damage to the tracks was minor. Nobody was injured in the above incidents. The problems were attributed to uneven loading of the freight trains, sharply curved trackage "unideal" for the freight wagons, and the structural characteristics of the Chinese trains. In response, KCRC carried out track improvements and liaised with the Guangzhou Railway Administration. At the time, the KCRC handled 6.25 million freight wagons per year, so the derailments were relatively isolated occurrences.
In the early morning of 31 May 1989, diesel locomotive L57 collided head-on with locomotive L56 at Mongkok station, causing injuries to four KCR staff. Three employees in L57 were taking the locomotive from Kowloon station to Fo Tan for repairs. The locomotive ran a red signal and struck the stationary L56 while traveling at about 50 km/h. Chan Yau-keung, a KCR Corporation construction supervisor, was critically injured and died on 8 June at Kwong Wah Hospital. He had been standing between the driver Ko Yuk-ching and co-driver Lee Kam-ming, both of whom were seated. Ko was a qualified driver while Lee, an assistant operator, was operating under Ko's supervision. Lee was driving at the time of the accident, but was seated in the left of the cabin and could not see the signals, which were on the right and were obscured by the long hood of the vehicle. According to procedures, Lee had to rely on Ko to relay him the status of the signals. Ko, speaking at an inquest following the accident, stated that he had felt dizzy and could not recall what colours the signals displayed. The advance warning system of locomotive L57, which would have automatically halted the train, was switched off. KCR officers in the control centre saw the impending collision but could not warn the crew as the L57 radio was switched off.
On 17 September 2019 at 08:32, a train carrying around 500 passengers derailed when approaching Hung Hom station, causing eight passenger injuries.

Underframe cracking

On 21 December 2005, a Metro Cammell EMU failed while in operation. Following examination of the train, KCRC staff detected minor cracks in the welding of mounting brackets for some underframe components. A review panel commissioned by KCRC looked into the problem from four aspects:
Since the full introduction of automatic train operation on the East Rail system in 2003, the rate of change of acceleration and deceleration resulting from ATO driving added stress to the underframe components. To allow a root cause investigation to be carried out, the use of the ATO system was suspended on 15 January 2006, leaving the operation of trains back in the hands of the train drivers, the safety of train operation under the control of the Automatic Train Protection system. This resulted in a decreased frequency and lengthened trip time. KCRC also temporarily transferred some staff from West Rail to cope with recent maintenance of trains.
The Environment, Transport and Works Bureau reprimanded the KCRC for not immediately notifying the Government when it found problems with its East Rail trains in 2005. Secretary for the Bureau Dr. Sarah Liao said she had ordered the KCRC to inspect all its trains, and did not rule out suspending services if there were safety doubts. Dr. Liao ordered the chairman to review the corporation's operations, including its management and overall system, and submit a report. KCRC chairman Michael Tien accepted responsibility for the corporation's poor judgement in not sharing the information with the public in a timely matter.
On 21 January 2006, Michael Tien stated that the safety problems of East Rail had been controlled, and the train service was expected to operate as usual, including train service in the Chinese New Year. KCRC East Rail trains reverted to the ATO operation on 6 August 2006, after the investigation confirmed that the ATO system was not a direct cause of the cracking.

Platform gaps

The wide platform gap at several stations is a safety concern. The KCRC has visually marked the "Gap Black Spots" on the platforms of those stations and stated that plates will be installed in the gap between the train and station. The platform gap is mainly caused by the curvature of the station and how the train enters the station area. A mechanical gap filler system, which extends the platform edge when a train is stopped at the station, was trialed at Lo Wu station.
After two incidents of children falling onto the tracks at University station in 1985, the issue was discussed in the Legislative Council. The Secretary for Transport asserted that the gaps were within "international safety limits", and that the gap could not be narrowed due to the curvature of the station as well as the "rather wider bodies" of the Chinese through trains which run through the station daily. A man who fractured his leg boarding a train at University station in 2008 asserted that he fell into a gap of about 35 cm, while the MTR claimed it was only 22 cm at the relevant section of platform.
The future MTR R-Stock trains will have wider compartments than the existing East Rail line rolling stock, therefore narrowing the gap. Also, due to the planned decrease in train lengths from 12 cars to nine cars, trains will stop at less curved sections of the platforms. MTR suggests that the width of the gap will be similar to that of the urban lines. In addition, automatic platform gates are being installed on East Rail line platforms as part of the Sha Tin to Central Link project. These will block passengers' view of the wide platform gaps. To reduce this safety risk, the MTR is installing 140 mechanical gap fillers at Mong Kok East, University, and Lo Wu stations.

Stations

This is a list of the stations on the East Rail line.

Train service

Trains run at around 4-minute intervals Mondays to Fridays from 05:00 to 01:00 the next day. However, Lo Wu and Lok Ma Chau stations close at approximately 00:30 the next day and 23:00 respectively, which means that trains terminate at Sheung Shui after both border checkpoints are closed. During peak hours, trains are more frequent, running every 2–3 minutes.

Special train departures

Some train trips may not be scheduled to depart in the usual way. For example, trains may call at Racecourse station, terminate at intermediate stations and/or enter the Ho Tung Lau Depot. These special services usually take place during morning peak hours on weekdays and Saturdays.
Examples of special train services:

Extension to Hong Kong Island

The Sha Tin to Central Link, a major expansion of the MTR network, is currently under construction. It will extend the East Rail line southward across Victoria Harbour to Hong Kong Island, via a new immersed tube. Trains will call on a new Exhibition Centre station before terminating at Admiralty station, where passengers can transfer to the Island line, Tsuen Wan line, or South Island line. Hung Hom station, the present terminus, is being reconstructed on an adjacent site and will act as an interchange with the East West Corridor, which will merge the West Rail and Ma On Shan lines into one line via Kowloon City and provide direct service to Tuen Mun and Wu Kai Sha.
This extension is scheduled for completion in 2021 and will include the first cross-harbour rail tunnel to be owned by KCRC and the first KCRC-owned stations on Hong Kong Island. As part of its construction, the entire East Rail line's signalling system will be further upgraded to a communications-based train control system, similar to that on the West Rail and Ma On Shan lines, and in December 2012 a HK$850 million contract was awarded to Siemens for the installation of its Trainguard MT CBTC system, which will replace the existing TBL and ATP/ATO systems. New Hyundai Rotem EMUs were ordered at a cost of HK$4 billion and will enter service in 2019, in advance of the signal upgrades, which are expected to be completed by 2020. However, due to the scandal at Hung Hom Station extension and damaged station facilities by revolutionaries, the target date of Hung Hom to Admiralty Section is possibly delayed to the first quarter of 2022.

Stations

Other proposals

The proposed Northern Link will connect Kam Sheung Road station to Lok Ma Chau station by 2023.
An infill station, Science Park station, has been proposed to serve the Hong Kong Science Park.