Eglinton Maintenance and Storage Facility


The Eglinton LRT maintenance and storage facility will be required by Toronto, Ontario, for Line 5 Eglinton, currently under construction. The facility is being built near the line's western terminus at Mount Dennis station, on lands formerly occupied by Kodak's Toronto campus.
The Eglinton line will use Flexity Freedom rolling stock, and will not be connected to the TTC's current streetcar lines, which all use.
The facility was substantially complete in October 2018, and was ready for the delivery of the first Flexity Freedom vehicle on January 8, 2019. Five more were delivered by February 2019.

Grounds

The facility's footprint is. The facility will initially service 76 Bombardier Flexity Freedom vehicles, but has capacity for 135 vehicles to handle any expansion of Line 5 Eglinton. According to Metrolinx, the site's "ultimate" capacity could be 162 Flexity Freedom vehicles.
Structures within the MSF will include:
The October 2015 design for the facility incorporated two artificial ponds, and green tracks, so its landscaping would better integrate with the adjacent parkland, in the Black Creek valley. The facility will have a "green roof".

Operations

is used to move trains within the facility without a driver on board. ATC moves trains automatically around the facility for cleaning, inspection and storage, and will deliver trains from the yard to a hand-over area where drivers take control to move trains onto the mainline tracks.
A backup power facility is being constructed adjacent the CN/CP rail corridor at the northwest corner of the Eglinton facility. In the event of a wide-spread power outage, the new facility will provide Line 5 trains with up to 4 hours of electrical power. The facility will use lithium-ion batteries, which will be charged overnight in order to reduce peak-period power demands and operating costs. The batteries will have a capacity of 10 MW / 30 MWh, equivalent to what is needed to power 8000 homes for a year. The roof of the facility will have about 250 solar panels to generate 90 kW DC of electricity. In addition to providing emergency power, the battery power would be used daily during peak hours to avoid Ontario Hydro's peak hour surcharge.

History

The site was chosen because it was a sufficiently large "brownfield" immediately adjacent to one terminus of the line. At first, Metrolinx was not open to input from neighbouring residents, but in May 2013, they announced that they would organize a mechanism for taking feedback.
In 2013, Metrolinx announced that the facility would not be operated by the TTC and they would contract with a private company to operate it instead.
Originally, the backup power facility was to have a natural gas–fired generator to power Line 5 in order to avoid peak demand times on the provincial power grid and to handle a power outage. The facility would have saved about 40 per cent on the price of electricity and would have been wide, long and tall. Some local residents and environmental activists were critical of Metrolinx's plan to use a backup generator powered by fossil fuel. Thus, on March 28, 2017, the province announced that the facility would use a system of batteries instead of a natural gas generator, and that the battery system's operating costs would not be greater than the operating cost of a gas backup power system.
By October 2018, the Eglinton Maintenance and Storage Facility was substantially complete and on January 8, 2019, received delivery of the first Flexity Freedom vehicle.