Enguri Dam


The Enguri Dam is a hydroelectric dam on the Enguri River in Georgia. Currently it is the world's second highest concrete arch dam with a height of. It is located north of the town Jvari. It is part of the Enguri hydroelectric power station which is partially located in Abkhazia.

History

initially proposed a major dam and hydroelectric power scheme on the Bzyb River as his favourite resort was located near the mouth of the river at Pitsunda. However, his experts informed him that a dam built on the Bzyb River would have had catastrophic effects in causing beach erosion at Pitsunda, so in the end the dam was built on the Enguri River instead, where the impact upon the coastline was assessed to be considerably less pronounced.
Construction of the Enguri dam began in 1961. The dam became temporarily operational in 1978, and was completed in 1987. In 1994, the dam was inspected by engineers of Hydro-Québec, who found that the dam was "in a rare state of dilapidation". In 1999, the European Commission granted €9.4 million to Georgia for urgent repairs at the Enguri HES, including replacing the stoplog at the arch dam on the Georgian side and, refurbishing one of the five generators of the power station at the Abkhaz side. In total, €116 million loans were granted by the EBRD, the European Union, the Japanese Government, KfW and Government of Georgia. In 2011 The European Investment Bank loaned €20 million in order to complete the rehabilitation of the Enguri hydropower plant and to ensure safe water evacuation towards the Black Sea at the Vardnili hydropower cascade.

Technical features

The Enguri hydroelectric power station is a cascade of hydroelectric facilities including, in addition to the dam - diversion installation of the Enguri HES proper, the near-dam installation of the Perepad HES-1 and three similar channel installations of the Perepad HESs-2, -3, and -4 located on the tailrace emptying into the Black Sea. While the arch dam is located on the Georgian controlled territory in Upper Svanetia, the power station is located in the Gali District of region Abkhazia of Georgia. Enguri HES has 20 turbines with a nominal capacity of 66 MW each, resulting in a total capacity of 1,320 MW. Its average annual capacity is 3.8 TWh, which is approximately 46% of the total electricity supply in Georgia as of 2007.
The facility's arched dam, located at the town of Jvari, was inscribed in the list of cultural heritage of Georgia in 2015.