Environmental Planning and Assessment Act 1979


The Environmental Planning and Assessment Act 1979 was passed in the Australian state of New South Wales.
It is an "Act to institute a system of environmental planning and assessment for the State of New South Wales".
The act incorporated a three-tired system of state, regional and local levels of significance, and required the relevant planning authority to take into consideration the impacts to the environment and the community of proposed development or land-use change. Most development requires a Statement of Environmental Effects detailing the impacts to both natural and human environments, which should be taken into consideration by the regulatory authority, while larger projects require a more thorough Environmental Impact Assessment and greater public scrutiny.

Parts of the Act

The Act covers the entire spectrum of environmental assessment and was divided into 11 Parts.
It was amended in 2017 by the Environmental Planning and Assessment Amendment Act 2017, and is now divided into 10 Parts.
The Act gained considerable controversy with the introduction of section part 3a that effectively allowed the Planning Minister to declare a project as of “State significance” and assume direct approval delegation. Although it was introduced to streamline the planning process and fast track the assessment of large infrastructure projects, a public perception of its misuse was a significant factor in the defeat of the Keneally government.
Part 3a has now been repealed.