One of the longer streets in the city, it runs in a north/south direction for more than 30 miles from its southern terminus at Harry Bridges Boulevard in the Wilmington neighborhood to Chevy Chase Drive in the city ofLa Cañada Flintridge at the north end. From its south end at Harry Bridges Boulevard to Downtown Los Angeles, Figueroa Street runs north parallel to the Harbor Freeway in South Los Angeles. The only portion of this segment of Figueroa Street that lies outside Los Angeles city limits is in the city of Carson. South of the Los Angeles Financial District, Figueroa Street passes well-known locations including the University of Southern California, the Los Angeles Convention Center, and Staples Center/L.A. Live. After passing through downtown Los Angeles near Bunker Hill and South Park, the southern portion of Figueroa Street ends near the overcrossing of Sunset Boulevard over the Arroyo Seco Parkway in Chinatown. The northern portion of the street resumes at San Fernando Road in Cypress Park. An early routing of Figueroa Street in this area was originally part of U.S. Route 66, today a part of the Arroyo Seco Parkway. The noted Figueroa Street Tunnels were once a part of that same stretch of roadway. After resuming at San Fernando Road, Figueroa continues to run roughly parallel to the Arroyo Seco Parkway until it reaches York Boulevard in Highland Park. Afterwards, it heads north to its terminus near the Scholl Canyon Landfill just past its junction with the Ventura Freeway in Eagle Rock. A short, unconnected continuation of Figueroa Street runs from a residential area just south of Marengo Drive in Glendale to end at Chevy Chase Drive just over the city limit line in La Cañada Flintridge. Early maps produced by the Automobile Club of Southern California measured distances to Los Angeles from the club's headquarters at the intersection of Figueroa Street with Adams Boulevard. On April 2, 2011, a portion of Figueroa Street at Jefferson Boulevard was blocked off for the "Orange Carpet" and the grandstand for the broadcasting of the 2011 Kids' Choice Awards.
History
Figueroa was originally called Calle de los Chapules. Later in the 1880s it became known as "Pearl Street". The section of what is now Figueroa in Highland Park above Avenue 39 was known as "Pasadena Avenue" until Figueroa was extended through Elysian Park. The portion of what is now Figueroa between the Los Angeles River and Avenue 39 was originally known as Dayton Avenue until the Arroyo Parkway went through.
The Metro C and J lines operates a station underneath Interstate 105 at Figueroa Street. Metro Local Line 81 operates on Figueroa Street between Colorado Boulevard and Interstate 105 and Torrance Transit Line 1 between Interstate 105 and the Harbor Gateway Transit Center. The Metro E Line has 5 stations nearby. Two of which are shared with the Metro A Line, one being a major hub connecting to the Metro B and D lines. The Metro J Line runs on Figueroa Street in Gardena and between 23rd and 6th Streets in Downtown: Northbound J line trips to El Monte Bus Station continue north on Figueroa Street to serve the 7th Street / Metro Center and finally turn right on 6th street, leaving Figueroa Street. Southbound J Line trips to Harbor Gateway Transit Center or San Pedro run south on Flower Street from 5th Street to the Harbor Transitway. There are 6 J Line street stops located on Figueroa Street: Figueroa/190th/Victoria; Northbound only: Figueroa/23rd, Figueroa/Washington, Figueroa/Pico, Figueroa/Olympic, and Figueroa/7th. In addition, there are 7 Metro Silver Line Stations served on the Harbor Transitway and Harbor Freeway close to Figueroa Street: 37th Street/USC, Slauson, Manchester, Harbor Freeway, Rosecrans, Carson, and Pacific Coast Hwy. The Harbor Transitway is located on the I-110 freeway, between Figueroa Street and Broadway. The Lincoln/Cypress Station for the Metro L Line on Avenue 26 at its intersection with Lacy Street is about a 5-minute walk from Figueroa Street.
The Figueroa Corridor Streetscape project is a city led effort to beautify and improve the boulevard by adding pedestrian friendly amenities. The beautification project began on 7th street in Downtown Los Angeles, by Staples Center and terminates at Exposition Park at USC. The project began in 2017 and was completed by the end of 2018. It aimed to improve transit and pedestrian access, protected bike lanes totally protected by physical barriers, a more organized and efficient street by adding better signalization and signage, high-visibility crosswalks, transit platforms, more street trees, public art and wider sidewalks. The $20 million Figueroa Corridor Streetscape project was funded by a Proposition 1C grant. After delays, work was expected to commence in the summer of 2016 and was expected to be completed by March 2017, when the prop 1C grant expires. The Los Angeles 2028organizing committee plan to use this corridor as a planned "Live Site", an area dedicated as a central pedestrian corridor, linking all of the Downtown LA venues together during the 2028 Olympic & Paralympic Games.