Construction of the power station started in late 1991 and it was opened in December 1993. It was built just south of a former British Sugarsugar beet factory, which is the planned location of Brigg Renewable Energy Plant, by European Gas Turbines, which was a division of GEC Alsthom. GEC Alsthom won the £90m contract in March 1991. Initially, it was owned by Yorkshire Electricity, but operated by a Finnish company, Fortum, under the name Regional Power Generators Ltd. RPG was joint venture between Yorkshire Electricity and Newcastle upon Tyne-based Berisford Bristar, of which YE took 75% control in January 1991, with Total Gas Marketing owning the rest. The gas was supplied by British Gas. In 2000 it was bought by Fortum. In July 2002 the plant was bought by Centrica for £37 million, with the operating company known as Centrica Brigg Ltd.
Operations
Glanford Brigg power station is a natural gas fuelled, combined cycle gas turbine power station with four gas turbines, four Stein Industrie heat recovery steam generators, and two 40 MW GEC Alsthom steam turbines, divided into two modules. It can produce 240 MW of base load electricity and 272 MW at peak load, from a thermal input of around 515 MW. In the event of interruption of main fuel supply, it can burn diesel instead. It can run at a maximum thermal efficiency of 46.8% when on constant running; the actual efficiency depends on factors in the local weather conditions such as temperature and humidity. It is used to fulfill peak load requirements from the National Grid, as the electricity output can be decreased when demand is less. Each gas turbine and both steam turbines are connected to a 40 MW electrical generator. The station's four flue gas stacks are high. The gas turbines are a General Electric Frame 6 type, producing 39.16 MW at 31.6% thermal efficiency. They rotate at 5135 revolutions per minute, and are connected via a gearbox to the electrical generator revolving at 3000 rpm. Exhaust gas reaches the steam generator at 541 °C. The gas turbine electrical generators are rated at 50.2 MVA, with a terminal voltage of 11 kilovolts. The electricity enters the National Grid via a transformer at 132 kV. The station falls within the supply area formerly ran by Yorkshire Electricity, with distribution currently run by Northern Powergrid. The site employs thirty six people.