Goldington Power Station


Goldington Power Station was a 180 MW coal-fired electricity generating station located to the east of Bedford in Bedfordshire, England. It was commissioned in 1955 and closed in 1983 and was demolished during 1984-87.

History

The Corporation of Bedford obtained legal powers under the Bedford Electric Lighting Order to generate and supply electricity throughout the town. Electricity was first generated in the Bedford Power Station at Prebend Street Bridge Bedford on 6 December 1894. In 1897 the station generated 342.35 MWh and sold this to 325 customers with a total of 12,832 lamps and 352 public lamps. Electricity was sold at 6d. per kWh which provided an Income to the Corporation of £4718. This small station was operational until 1966.
In 1923 the generating plant comprised 2 × 275 kW and 1 × 500 kW reciprocating generators plus 1 × 1.0 MW and 2 × 1.5 MW turbo generators, these provided a 105 V and 210 V AC supply. The boilers had a combined evaporative capacity of 134,000 lb/hr. The total amount of electricity sold was 5.147 MWh, 4.611 MWh and 4.664 MWh. This generated a revenue of £72,708 and £60,440.
Year19551956195719581959196119621963
Station output, GWh16.23814.99012.1305.0691.3630.7993.668.13

To meet the post-war demand the British Electricity Authority commissioned the building of new generating plant. The Ministry of Fuel and Power granted consent for 60 MW of electricity generating plant at Goldington about 3 km east of Bedford in June 1950. The consent was increased to 180 MW in August 1951.

Facilities

The site at Goldington was chosen because it was remote from built-up areas; was adjacent to a railway for the delivery of coal and the disposal of ash; and was close to an ample water source for cooling the plant.
The site was liable to flooding from the River Great Ouse therefore the area was raised in level prior to construction of the power station. Reinforced concrete piles were used for load-bearing areas.
The power station was designed and constructed over the period 1951-58. The consultants were Sir Alexander Gibb & Partners and Merz & McLellan. The principal civil engineering contractors were Mitchell Construction Co. Ltd., Bierrum and Partners Ltd, and Film Cooling Towers Ltd. The first generator was commissioned in June 1955, then September 1955, November 1956, December 1956, June 1957 and the final set in March 1958.
Coal was initially supplied via a dedicated siding off the Bedford to Cambridge railway line. The open coal store was to the south of the station site.
Water was abstracted from the river and used for steam condensing and cooling. There were four reinforced concrete cooling towers on the east of the station site.
The 132 kV connection to the national grid was at a switching compound on the north side of the power station.

Specification and operation

The power station had an installed electricity generating capacity of 180 MW and comprised six 30 MW British Thomson-Houston turbo-alternators. The six Clarke Chapman boilers burned pulverised coal – up to 250 tonnes an hour –  to produce steam at a total rate of 1,800,000 lb/hr at a pressure of 600 psi and 454°C. In 1961 the thermal efficiency of the station was 26.56 per cent. The output in GWh over the operational life of the station was as follows.

The railway line from Bedford to Goldington power station was retained when the remainder of the line to Cambridge was closed in January 1968. The power station siding was not used after 1979 and coal was instead delivered by lorry. The line from Bedford St. Johns to Goldington was closed in April 1981.
Up to 6 million gallons an hour of water was abstracted from the River Great Ouse via a 720 ft channel off the river near the railway bridge. Goldington used a mixed cooling system: some river water was used in the cooling process and returned to the river 225 m downstream of the intake and some warmed water was pumped to the cooling towers and used again for cooling. The cooling towers each has a capacity of 1.2 million gallons per hour. A survey in August and September 1968 found that the river was 10.4°C warmer downstream of Goldington power station than upstream due to the heat input from the station.

Closure

The power station operated for 28 years from 1955 to 1983.
The station closed in October 1983. The four cooling towers were demolished in 1986 and the 300 ft high chimneys in March 1987. By 1996 the power station site had been redeveloped as housing. The station was located off Barkers Lane on what is now Riverfield Drive.