Great Eastern Railway


The Great Eastern Railway was a pre-grouping British railway company, whose main line linked London Liverpool Street to Norwich and which had other lines through East Anglia. The company was grouped into the London and North Eastern Railway in 1923.
Formed in 1862 after the amalgamation of the Eastern Counties Railway and several other smaller railway companies the GER served Cambridge, Chelmsford, Colchester, Great Yarmouth, Ipswich, King's Lynn, Lowestoft, Norwich, Southend-on-Sea, and East Anglian seaside resorts such as Hunstanton and Cromer. It also served a suburban area, including Enfield, Chingford, Loughton and Ilford. This suburban network was, in the early 20th century, the busiest steam-hauled commuter system in the world.
The majority of the Great Eastern's locomotives and rolling stock were built at Stratford Works, part of which was on the site of today's Stratford International station and the rest was adjacent to Stratford Regional station. The GER owned of line and had a near-monopoly in East Anglia until the opening of the Midland and Great Northern Joint Railway in 1893 although there were a number of minor lines, such as the Mid-Suffolk Light Railway that stayed resolutely independent until after the grouping in 1923.

History

Amalgamation

Between 1851 and 1854 the Eastern Counties Railway under the chairmanship of David Waddington had negotiated arrangements to work most of the other railways in East Anglia resulting in a network of lines totalling. Whilst Parliament favoured competition it was also aware that the ECR was constantly at war with its neighbours and whilst these working arrangements were approved there was a condition that a bill for full amalgamation was presented by 1861.
Waddington departed under a cloud in 1856 and was replaced by Horatio Love. By 1860 many shareholders were unhappy listing several grievances they saw as getting in the way of their dividend payments. These included continual conflict over working of other lines, suspicion and distrust of the joint committee, inadequate services to and from London, on-going litigation and law costs and a lack of progress on amalgamation.
By February 1862 the bill had its second reading and was then followed by a lengthy committee process where various parties petitioned against the bill. On 7 August 1862 the bill passed and the Great Eastern Railway was formed by the amalgamation of the Eastern Counties Railway and a number of smaller railways.

Early years (1862-1869)

Unsurprisingly the first GER board had a strong Eastern Counties flavour with Horatio Love in the chair and James Goodson the deputy chair. The board consisted of six former ECR directors with two Eastern Union Railway, two Norfolk Railway and one each from the Northern and Eastern Railway and East Anglian Railway.
Operational costs were high on the new railway and new sources of revenue needed quickly. Work at improving suburban services was put in hand and trains from London to Norwich speeded up to give businessmen and merchants more time to conduct their business. A new suburban line to Enfield Town via Seven Sisters was proposed as well as a new London terminus to replace an inadequate Bishopsgate. By August 1863 receipts were increasing and many of the pre-amalgamation disputes were being settled.
The GER and Great Northern Railway each submitted bills for a line from March to Spalding and although the GNR was successful the GER was awarded running rights over the new line which would later become part of the Great Northern and Great Eastern Joint Railway. Steamboat services were also seen as a new source of revenue with services running from Harwich to Rotterdam, Flushing and Antwerp.
A change of leadership also occurred with Horatio Love being replaced by James Goodson as Chairman with Captain Henry Jervis-White-Jervis as his deputy. Love was considered too cautious and some on the board still resented his role prior to amalgamation at the ECR. Various directors were allocated specific responsibilities leaving Goodson free to develop new schemes and represent the GER on lines where they had a financial interest.
Following an accident at North Wootton in early August 1863, where the deaths of five passengers was partially attributed to the poor state of the rolling stock, a large rolling stock order was placed.
By December 1863 the financial picture was looking better and in early 1864 the GER started looking a new railway to move coal from South Yorkshire to London via Spalding and the GN link from Spalding to March. The Great Eastern was clearly in an expansionist phase with further locomotives, carriages and wagons under construction. More ships were being ordered for Antwerp and Rotterdam traffic and proposals for 28 miles of new metropolitan lines and a new city terminus.
In March 1864, a joint committee of the House of Commons and House of Lords approved the East London Line which would link the North London, Great Eastern and London and Blackwall railways. The parliamentary bill for the new freight line failed although other bills including the construction of a new London terminus were approved. Later that year the GER was in talks about expansion northwards with the Lancashire and Yorkshire Railway which lead to the deposition of a bill in early 1865.
The board meeting of February 1865 saw passenger receipts outstripping goods receipts. Fish traffic from Lowestoft and Great Yarmouth was growing and money was being spent on stations, replacing wooden bridges and upgrading the track. However, a number of shareholders voiced concern. The following month the House of Commons rejected the joint GER/L&YR bill forcing the GER to restart negotiations with the Great Northern Railway. The chairman of the parliamentary committee suggested to the board that the next bill should include a direct Spalding to Lincoln link.
Board unity was about to be shattered when a short paragraph in The Times reported serious differences of opinions existed between the directors. In August 1865 deputy chairman Jervis-White-Jervis issued an appeal raising concerns about the management of the railway. This prompted an internal investigation and in a board meeting at the end of the month, an absent Jervis-White-Jervis was replaced by William Shaw as deputy chairman. The internal investigation concluded that many of Jervis-White-Jervis's concerns were relevant including borrowing more money than authorised and the poor deal the GER got on leasing the London and Blackwell Railway. In a meeting in January the following year many of the directors were duly replaced and at the following board meeting in February, Charles Turner was elected as the new chairman.
The new board, facing a financial crisis, had identified a number of issues including the provision of a new terminus station at Liverpool Street, Bishopsgate was to be converted to a goods terminal and a new coal depot to be built in Whitechapel. The financial environment was still proving difficult with losses on the London and Blackwell line and a cattle plague seriously affecting that traffic. By March the board was meeting most days in an effort to keep the railway running.
The financial crisis of 1866 saw loan interest rates rise to 10% on 12 May. On 8 June the board approached Parliament for the right to borrow more money and raise additional money through new shares to fund the expansion programme outlined above. This was confirmed on 4 July. By this time there was little money available for dividends and the company looked very carefully at their expansion programme and unprofitable branch lines. By December 1866 little interest was being shown in the new shares, so the board went unsuccessfully to the Bank of England and Union Bank for further loans. The GER did, however, manage to agree running rights via the Great Northern Railway as far as Wakefield and with the Manchester, Sheffield and Lincolnshire Railway to interchange traffic at Lincoln and Retford.
The crisis continued into 1867 and by March it was apparent that the preference share payments due in April could not be paid. The board also received a letter from the drivers seeking improved working conditions. Additionally The Times suggested the GER may be about to appoint a receiver. Early April saw daily negotiations with the Union Bank although agreement was reached with the drivers by the middle of that month.
May saw the company trying to raise further funds via a parliamentary bill. However, by June 25, the House of Lords had rejected the bill and the board took steps to protect the company's property from its creditors. Matters were hardly helped when deputy chairman Samuel Laing resigned to become the chairman of the London, Brighton & South Coast Railway on July 1. On July 2 a suit was bought before vice-chancellor Sir Richard Malins and the GER was placed into chancery.
Regrouping after this, the board pursued Edward Watkin, an MP with many other railway interests, as chairman. He did advise that the board that it needed to reconstitute itself in order to rebuild confidence in order to acquire new capital. Some existing members of the board were not pleased with this and it was not until 3 January 1868 that a reduced board of eleven members met with six new members including Watkin and Viscount Cranbourne MP who was elected as the new chairman.
The new directors were all allocated specific roles and a number of changes were made to reduce costs and improve profitability. Cranbourne also approached the London & North Western Railway to report on the state of the permanent way and rolling stock. By August 1868 the tide was turning with increased receipts and some debts being paid off. The GER had done a deal with the Midland Railway to route their coal traffic via their lines and a new coal depot at Whitechapel opened in December further improving profitability.
By August 1869 the financial position had improved enough to restore a dividend and this was whilst the Walthamstow line was under construction. In the same month, Deputy Chairman Charles Turner resigned due to suspected fraud which was to lead to his bankruptcy later in the year. Although proceedings were initiated no prosecution resulted.

1870-1879 A new London terminus

The original London terminus was opened at Shoreditch in east London by the Eastern Counties Railway on 1 July 1840 when the railway was extended westwards from an earlier temporary terminus in Devonshire Street, near Mile End. The station was renamed Bishopsgate on 27 July 1847.
The Great Eastern attempted to obtain a West End terminus, alongside the one in east London, via the Tottenham and Hampstead Junction Railway, formed by an Act of Parliament of 28 July 1862. Plans to extend the western end of this line via a proposed 'London Main Trunk Railway', underneath Hampstead Road, the Metropolitan Railway and Tottenham Court Road, to Charing Cross, were rejected by Parliament in 1864.
A new London terminus at Liverpool Street was opened to traffic on 2 February 1874, and was completely operational from 1 November 1875. From this date the original terminus at Bishopsgate closed to passengers, although it reopened as a goods station in 1881.

1900-1914

In 1902 the Northern and Eastern Railway was finally absorbed by the GER, although it had been worked by the Eastern Counties Railway under a 999-year lease taken on 1 January 1844 whereby the Eastern Counties Railway would work the Northern and Eastern Railway in return for an annual rent and division of the profits.
Despite several half-hearted attempts by the GER during the latter part of the nineteenth century, it was the Midland Railway that finally bought the London, Tilbury and Southend Railway in 1912 with the MR offering a better deal for the LT&SR shareholders than the GER ever had. The agreement was ratified by the LT&SR shareholders on 26 June 1911. During the following parliamentary session, the official parliamentary bill allowing the takeover by the MR was passed on 7 August 1912 although it was legally backdated to 1 January 1912. At the time of the sale the LT&SR was one of the most prosperous railways in the UK but too small to fund the changes it needed to make.
In 1914 The GER became the first UK railway company to employ a General Manager from overseas, Henry Worth Thornton. He had previously worked as the General Superintendent of the Long Island Railroad in the USA.

During the First World War 1914-1918

The Railway Executive Committee was set up in 1912 after an incident between France and Germany in the Moroccan Port of Agadir and would take directions from the military and liaise with the railway companies. As it adjoined the North Sea the GER undertook a significant role in the war.
Had there been an invasion then the railways had evacuation plans for the civilian populations. The GER did require some upgrading to deal with the increased levels of traffic – lines were doubled, additional passing loops provided, platforms extended and watering facilities improved. A number of link lines were provided including the link between the Tottenham and Hampstead at Gospel Oak to the Midland Railway and between the T&H and Great Northern Railway at Crouch Hill, Both links remain part of the national network.
When the war started several jobs fell to the railway – reserve troops and naval personnel had to be returned to their units and this saw an upsurge in usage of normal services. Various units were moved to the coast for defensive purposes and at the same time the government had started buying horses throughout the area leading to additional trains. There were also then the units that were being moved to the front line. The Royal Navy was using coal as its primary source of propulsion and additional coal trains would have been operated through the area as well.
In August 1914 the Germans disguised a passenger steamer in GER colours and deployed it as a minelayer. This ruse was spotted on 5 August 1914 and the ship sunk by the British light cruiser and destroyers and.
The GER employed significant numbers of women during this period as many men had joined the army.
By 1916 unnecessary travel was being discouraged to conserve coal supplies.
The company set up a section dedicated to the movement of military traffic and between 1914 and 1918 nearly 10.5 million men were moved on GER services as well as significant numbers of horses and supplies. Specific military traffic was generated at Brimsdown, Ponders End and Stowmarket. Because of attacks on east coast shipping, traffic previously moved by sea was also carried on the GER.
The GER also suffered from a number of Zeppelin attacks with, amongst others, the dormitory at Stratford engine shed and the royal shelter at King's Lynn both being hit.

After World War 1 (1918-1923)

In 1922, a large marble memorial was installed at Liverpool Street station commemorating GER staff who had answered the call of duty to fight but died in action in the First World War. The memorial was unveiled by Sir Henry Wilson, who was assassinated by two Irish Republican Army gunmen on his way home from the unveiling ceremony. A smaller memorial to Wilson was later placed adjacent to the GER memorial, alongside one to Charles Fryatt, a British mariner who was executed by the Germans for attempting to ram a U-boat in 1915.
The Great Eastern name has survived, being used both for the Great Eastern Main Line route between London and Norwich, and also for the First Great Eastern train operating company which served much of the old GER route between 1997 and 2004.

Constituent companies

The Great Eastern Railway was made up of a number of constituent companies when it was formed in 1862. The most notable was the Eastern Counties Railway, which had taken over most of the main companies by this time. After 1862 there were still a number of companies operating independently in East Anglia, but most of these were eventually taken over by Great Eastern, although some such as the Mid-Suffolk Light Railway survived until 1923.
The history and exact status of many of these railways is quite complex. In many cases the operation of the railway that built the line was taken over although the original railway company often existed in legal form after that date.
The 1862 Act stated that the purpose of the legislation was "to amalgamate the Eastern Counties, the East Anglian, the Newmarket, the Eastern Union and the Norfolk railway companies, and for other purposes". This suggests that despite the fact that some of these railway companies had been taken over by the Eastern Counties Railway prior to the 1862 Act, they still legally existed.
The table below shows the building dates of the railways that made up the Great Eastern and the companies that built them. Abbreviations from above list.
Opening DateLineOpening CompanyNotes
1839Mile End - RomfordECRInitially built to gauge
1840Shoreditch - Mile EndECRInitially built to gauge
1840Romford - BrentwoodECRInitially built to gauge
1840Minories - BlackwallLBRMinories used as a temporary terminus - initially a rope worked line.
1840Stratford - BroxbourneN&ERStratford was on the ECR line - initially built to gauge
1841Fenchurch Street - MinoriesLBR
1841Broxbourne - SpelbrookN&ERTo Harlow, to Spelbrook
1842Spelbrook - Bishops StortfordN&ER
1843Brentwood - ColchesterECR
1843Broxbourne Junction - HertfordN&ERLater named Hertford East
1844Norwich - Great Yarmouth Y&NRRoute via Reedham
1845Bishops Stortford - NewportN&ER
1845Newport - BrandonECRFirst line to Cambridge - working of Ely - Brandon taken over by Norfolk Railway March 1846
1845Brandon - TrowseNorwich & Brandon RailwayOpen 30 June - bridge at Trowse unfinished
1845Trowse - Thorpe JunctionNR15 - December. Trowse bridge opened - through running from Norwich to London starts
1846Colchester - Ipswich EUR
1846King's Lynn - DownhamL&ERKing's Lynn Harbour branch also opened same day
1846King's Lynn - NarboroughL&ER
1846Dereham - WymondhamNR
1846Ipswich - Bury St EdmundsI&BRThe line did not serve the original Ipswich station directly - trains had to reverse into the station at Halifax Junction a short distance to the south
1847Ely North Junction - Peterborough JunctionECR
1847Colchester - Hythe QuaySVRFreight only - leased to the EUR and operated by them
1847Lowestoft - ReedhamLRHLeased to NR from opening
1847March - WisbechECR
1847Stratford - North WoolwichECR
1847Thames Wharf branchSTJROpened same day as North Woolwich line
1847Narborough - SwaffhamEAR
1847Chesterton Junction -St IvesECRLater part of GNGEJR route
1847Huntingdon - St IvesEAR
1847Bentley - HadleighEURNote: this is in Suffolk
1847Downham - Ely North JunctionEARKing's Lynn to Cambridge and London, now a through route
1848Swaffham - SporleEAR
1848Great Chesterford - NewmarketNEWSee below - possibly first passenger route to close in the UK?
1848Watlington - WisbechEAR
1848St Ives - March South JunctionECRLater part of GNGEJR route
1848Haughley - FinninghamEURThe first part of the link joining the Ipswich to Bury St Edmunds line to Norwich
1848Maldon - WithamECRWitham - Braintree opened same day
1848Witham - BraintreeECRMaldon - Witham opened same day
1849Sporle - DerehamECR
1849Water Lane - Enfield TownECR
1849Stepney - Bow JunctionLBRMost trains only worked as far as Bow Road with a few trains being extended to a short lived interchange station called Victoria Park & Bow which is located near the modern day Bow Junction on the Great Eastern Main Line.
1849Marks Tey - SudburySVRLeased to the EUR and operated by them. The EUR had running powers over the ECR route between Marks Tey and Colchester
1849Finningham - Norwich EURLink between Ipswich and Norwich completed
1851Shelford - SheprethECREnd on working with GNR allowing through trains between Cambridge and Kings Cross
1851Trowse Upper Junction - Trowse Lower JunctionEURThis allowed EUR services from Ipswich to use Norwich Thorpe station rather than Norwich Victoria.
1851Cambridge - Six Mile BottomNEWThrough route Cambridge to Newmarket now complete. This used materials from the closed Newmarket and Chesterford Railway
1854Newmarket - Bury St EdmundsECRThrough route Cambridge to Ipswich now complete
1854Manningtree-HarwichECRConstruction started by EUR but the ECR leased the EUR about one week before opening.
1854Victoria Park -Stratford Market ECRLink to NLR. Note A
1854Halesworth - HaddiscoeESR
1855Tivetshall - HarlestonWVR
1856Loughton Branch Junction - LoughtonECRNow part of London Underground Central line
1857Wells - FakenhamWFR
1859East Suffolk Junction-WoodbridgeECROpened same day as all East Suffolk lines listed below.
1859Woodbridge - HalesworthESR
1859Saxmundham - LeistonESR
1859Wickham Market - FramlinghamESR
1859Snape Junction - SnapeESRFreight only
1859Haddiscoe - Great Yarmouth ESRGreat Yarmouth - Ipswich through route complete
1859Beccles - LowestoftESRLowestoft - Ipswich through route complete. Note ESR taken over by ECR on opening day
1860Leiston - AldeburghECRBuilt by ESR but completed by ECR
1860Harleston - BungayWVR
1862King's Lynn - HunstantonLHRWorked by GER in return for share of gross receipts
1863Bungay - BecclesWVRTaken over by GER on opening
1863Hythe - WivenhoeTEN
1863St Margarets - BuntingfordWHBRBranch off the Hertford East line - operated by the GER from opening and taken over in 1868
1865Loughton - OngarGERNow part of London Underground Central line as far as Epping. The rest is run as preserved line. Original station at Loughton abandoned
1865Shelford - Haverhill - SudburyGER
1865Haverhill - Colne Valley JunctionGERJunction with independent Colne Valley Line
1865Bury St Edmunds - Long MelfordGER
1865Saffron Walden - Audley End.SAWR
1866Wivenhoe - WeeleyTEN
1866Sutton Bridge Junction - Sutton BridgeEHSR
1866Wivenhoe - BrightlingseaTEN
1866Weeley - Kirby CrossTEN
1866Heacham - WellsGER
1866Saffron Walden - Bartlow.SAWR
1867Mellis - EyeGER
1867Kirby Cross - Walton-on-the-NazeTEN
1868Tottenham North and South junction - Highgate RoadT&HJRNote B
1869Roudham Junction - WattonTWR
1869Bishops Stortford - BraintreeGERCompletion of through Witham to Bishops Stortford line
1869Wapping - New CrossELJRFirst part of East London line
1870Lea Bridge - Shern Hall Street GERFirst section of modern-day Chingford branch
1870Lynn Docks branchGER
1872Bethnal Green - Bury Street JunctionGERopened in three stages. Gave shorter route to Enfield Town.
1872Hackney Downs - Coppermill junctionGERThis route is now used as main route to Cambridge
1872Bethnal Green - Bishopsgate Low LevelGERFirst part of line into Liverpool Street
1872Clapton - Hall Farm Junction GERRoute used by present-day Chingford trains
1872Haddiscoe SpurGEREnabled through running from Yarmouth South Town to Lowestoft
1873Shern Hall Street - ChingfordGER
1874Bishopsgate Low Level - Liverpool StreetGERSuburban traffic only
1874Custom House - BecktonGER
1874Whitlingham Junction - North WalshamENRNote C
1875Watton - SwaffhamTSR
1875Liverpool StreetGEROpen to all traffic
1876Bury St Edmunds - ThetfordBTR
1876Thetford Junction - Thetford EastTSR
1876East London Jn - WappingELJRNorthern section of the East London Line
1876North Walsham - GuntonENRNote C
1877Gunton - Cromer High railway stationENRNote C. Note also this is not the current Cromer station site
1877Westerfield Junction - Felixstowe FRExtended to Pier later in year.
1878Chingford - Chingford -
1878Seven Sisters - Palace GatesGERBranch to Alexandra Palace - opened in two stages during year
1878Sutton - Needingworth Junction - St IvesE&SIR
1879Wroxham - Buxton LamasENRNote C
1879Wensum Curve GERNorwich avoiding line
1879Ely - Fordham - NewmarketE&NRBuilt by Ely and Newmarket Railway but operated by GER from outset
1880Chippenham Junction - Snailwell JunctionE&NRCompleted direct route Ipswich to Ely line. Trains had had to reverse at Newmarket in 1879.
1880Buxton Lamas - AylshamENRNote C
1880Limehouse Jn - Salmons Lane JnGER
1880Custom House - GallionsLID
1880Aylsham - CawstonENRNote C
1881Cawston - ReephamENRNote C
1881Forncett - WymondhamGER
1882Spalding - LincolnGNGEJROpened in two sections - through running from the GE to Doncaster and York was now possible
1882Reepham - County SchoolGER
1882Manningtree North CurveGERHarwich branch doubled in the same year.
1882Thorpe-le-soken - ClactonTEN
1882Stoke Ferry - DenverGERThe Wissington Light Railway had a junction with the Stoke Ferry branch from 1905.
1883Breydon Junction - BrundallGEROpened in two stages
1884Wisbech - Outwell BasinGEROperated by tram type locomotives
1884Barnwell Junction - FordhamGER
1885Fordham - MildenhallGER
1886Norwich Thorpe StationGER
1888Highgate Road - Gospel OakTHJ
1888Shenfield - WickfordGERInitially open for goods traffic only
1889Wickford - Southend VictoriaGERInitially open for goods traffic only
1889Wickford - SouthminsterGERInitially open for goods traffic only
1889Somersham - RamseyESJR
1891Edmonton Jn - CheshuntGERKnown as the Southbury Loop
1894Liverpool Street GER
1896Newmarket CurveGER
1897Three Horse Shoes Jn - Burnt HouseGER
1898North Walsham - MundesleyNSJR
1898Burnt House - BenwickGER
1898Felixstowe TownGERDirect route closed to Beach and Pier station at this date and all trains had to run via Town for these stations.
1903Woodford - Fairlop - IlfordGERRemaining section part of LUL Central line
1903Yarmouth - Gorleston - LowestoftNSJRProvided a more direct route than the Haddiscoe spur.
1904Kelvedon - TollesburyGER
1906Cromer Junction - Roughton Road JunctionGER
1906Roughton Road Junction - Runton West JunctionNSJR
1906Roughton Road Junction - MundesleyNSJR
1907Tollesbury - Tollesbury PierGER
1913Elsenham - ThaxtedGERKnown as the 'Gin and Toffee' line

Other railways
Notes

Stations

Engine sheds

The Great Eastern had one of the largest engine sheds in the country at Stratford which in January 1923 had an allocation of 555 locomotives. At the other end of the scale, small engine sheds at the end of country branch lines had perhaps one or two locomotives in their charge. At this time the locomotives were generally allocated to the major shed in the area and the smaller sheds had no actual allocation.
Before 1914 the engine sheds were organised into districts, with sheds at: Stratford; Ipswich; Norwich; Cambridge; Peterborough; King's Lynn; and Doncaster. In 1914 this was reduced to five with King's Lynn and Doncaster being abolished. By 1915 they were organised onto four districts : Southern ; Eastern ; Northern ; and Western.
The Great Eastern did not see the maintenance of engine sheds as one of its top priorities. Many original structures it inherited from constituent railways struggled on in various states of disrepair, not only through Great Eastern days, but through its successor company London & North Eastern Railway from 1923 until 1947 and indeed to the end of steam on the Great Eastern in 1959.
Coaling at engine sheds was generally done by hand with the coaling stages constructed of wood. At a busy engine shed such as Stratford, each individual coaler employed on the coaling stage was expected to empty the contents of a coal truck during his shift.
Turntables were generally small – in 1900 the longest was – enough to turn the later B12 Class 4-6-0 locomotive. By 1932, with the advent of bigger locomotives and the working of other companies' locomotives onto GE territory, turntables had grown, with the major sheds generally having turntables.
In 1922 the GER locomotive allocation across its sheds was: Cambridge - 178; Colchester - 47; Doncaster - 5; Ipswich - 131; King's Lynn - 37; Lincoln - 12; Lowestoft - 22; March - 97; Norwich - 119; Parkeston - 20; Peterborough East - 86; Stratford - 555; Wisbech - 7; and Yarmouth - 20. Each main shed had a number of sub-sheds and locomotives would work from these sheds for significant periods. For instance it is estimated that some 150 engines were outbased from Stratford at any one time.

Works

The main workshops were located at Stratford Works and was responsible for the building of locomotives and carriages. Wagons were initially built here as well but as the railway grew a new wagon works was built at Temple Mills in 1896.
In 1894 a carriage painting facility was opened at Felixstowe Beach station which dealt with the painting of around 200 carriages each year.
Many engine sheds carried out heavier repairs. Ipswich engine shed for instance had a tube shop and a smithy containing eight forges and a steamhammer.
Another wagon works was located at Ipswich.
Stratford Works and Ipswich lasted until the 1990s but Temple Mills closed in 1983.

Signal boxes

The GER always allowed contractors a certain amount of freedom within their specified design, and three early types evolved built by Saxby & Farmer, Stevens or McKenzie & Holland. By 1877 the GER were consolidating their own design, which featured a gabled roof, with large overhang, and weatherboarding. Windows were always two panes high in this design. A more ornate style of construction replaced this type in 1882, but this did not last long - the GER was never a rich railway. By 1883 brick boxes were being built to a plainer design, although 1884 saw some ornateness returning. For instance, March West box contained mock stonework in the gables, fancy window design and decorated bargeboards.
By 1886 timber boxes were being constructed again as well as brick examples but this - with some variation - was the last design for Great Eastern signal boxes.
By 1997 there were still 90 of these in service, but with recent changes, and more changes expected.
, then it is unlikely that many will remain in service for much longer.

Operations and timetables

Main line

Over the years the principal main line services between Norwich and Liverpool Street were routed via Ipswich or Cambridge, generally depending on the quickest journey time available. Before the GER was formed its predecessor the Eastern Counties Railway had a reputation for speed second only to the Great Western and Great Northern Railways. From 1850 to 1855 Cambridge could be reached in 75 minutes, a further 20 minutes to Ely and a further 55 minutes to Wymondham giving an average speed of. There is some doubt as to the reliability of these times; as the writer Thackeray observed in The Lamentable Ballad of the Foundling of Shoreditch, "For even the Heastern Counties' trains must come in at last."
In the early days of the GER the 5 p.m. departure from Shoreditch took 52 minutes to reach Bishop's Stortford and 92 to get to Cambridge.
Because the route via Colchester had been built by a number of different companies, mostly in dubious states of financial stability, it was some years before the Colchester route rose to prominence. Then, as line speeds on this or the Cambridge line improved, the focus of the Norwich services would shift from one to another. On taking over the entire route in 1862, the GER improved speeds on the Colchester line so that Colchester was reached in 70 minutes and Yarmouth could be reached in 3 hours 25 minutes. Norwich was 3 hours and 15 minutes via Ipswich and 4 hours via Cambridge.
In 1869 the situation had been reversed and it was quicker to get to Norwich via Cambridge compared to 4 hours 15 minutes via Ipswich. In 1870/1 the balance shifted back to the Ipswich route, with a time of 3 hours 35 minutes compared to 3 hours 53 minutes via Cambridge. By 1878 the Cambridge route was ascendant, with times of 3 hours 12 minutes for the fastest trains compared to a time of 4 hours 10 minutes via Ipswich. In the 1880s both routes had similar times, but by 1887 the Ipswich route offered a time of 2 hours 40 minutes which improved to 2 hours 31 minutes in 1897 and by a further five minutes in 1906.

Main line boat trains

s commenced running to Harwich Parkeston Quay in 1882 and were timed at 1 hour 45 minutes from Liverpool Street. By 1895 this was down to 1 hour 30 minutes. In 1897 the 8:30 pm train was run as two separate trains - 8:30 pm for the Hook of Holland and 8:35 pm for Antwerp. With the introduction of the corridor restaurant cars in 1904, the time was eased to 87 minutes, but the introduction of the Class 1500 4-6-0 express engines in 1912 saw a running time of 82 minutes.

Suburban services (the Jazz)

The Great Eastern was renowned for operating an intensive suburban service known as the "Jazz" service. The different classes on the trains were indicated by different coloured stripes along the top of the carriage sides. The stripes allowed passengers to find their compartments more quickly at stations and reduced stopping times. They were yellow for first class and blue for second class. In 1920, the GER also introduced a system of colour-coded boards on the side and rear of the guard's van, which would be nearest the gates and concourse at terminus stations and thus allow passengers to identify the service they needed. This colourful combination was regarded, in the parlance of the time, as 'jazzy'.
Serving the East End of London, the London Docklands and the capital's eastern suburbs, the Great Eastern's suburban services had a much greater proportion of working class industrial workers, labourers and lower-ranking office workers than the suburban networks of the likes of the London and South Western Railway or the Metropolitan. The GER had to transport greater numbers of passengers commuting in and out of the urban centre and at lower fares. The GER encouraged passenger numbers with low-price 'workman fares' services which ran in the early morning and late evening. There was a symbiotic relationship between the railway and property development - the existence of the railway made it possible for even industrial workers to move into new housing developments in the suburbs which then provided extra custom for the GER. The GER itself invested in property development near its routes and in some cases even built its own housing on land purchased as part of railway construction.
The service was initially operated by 2-4-2T engines and these were later superseded by 0-6-2T engines of the N7 class. At Liverpool Street station alterations were made to the signalling so once a train had arrived and was emptying, an engine was attached to the other end of the train whilst the train engine was detached. When the train departed, the locomotive on the buffer stops moved to the locomotive siding at the other end of the platform to await the arrival of the next terminating service.
Turn round could be achieved in as little as four minutes.
The GER also operated suburban services out of Fenchurch Street station with trains to North Woolwich, Blackwall Gallions and Loughton sharing the station with the London Tilbury and Southend until 1912 when the Midland railway took over operation of that railway.

Named trains

The Cathedrals Express operated from Liverpool Street via Cambridge, Ely, Lincoln and Doncaster to York. Three services were run each day although it was never a particularly well patronised service.
The North Country Continental operated between Harwich and Manchester Piccadilly usually being routed via March and the GNGEJR route.
This train included the first restaurant car on the Great Eastern and this was also the first service in the UK to allow third-class passengers to dine. A new train set was built for this service in 1906 and generally operated in the following formation:
ENGINE+THIRD CLASS BRAKE+CORRIDOR THIRD+OPEN THIRD+KITCHEN AND OPEN FIRST+SEMI-OPEN FIRST+SIX WHEEL BRAKE. Then followed various corridor composite brakes followed each detached from the rear of the northbound train en route. These were for LIVERPOOL + LIVERPOOL + MANCHESTER + BIRMINGHAM + BIRMINGHAM.
The Norfolk Coast Express operated between Cromer and Liverpool Street and a purpose-built train was built for this service in 1907. This was the first formation without six-wheeler carriages in the 12-car formation, which included eight carriages for Cromer, two for Sheringham and two for Mundesley. The portions were detached at North Walsham.
However whether all of these trains carried nameboards in Great Eastern days is doubtful.

Branch line services

Typically branch line services were worked by small tank engines usually with ancient carriages handed down from main line or suburban services. Generally many branch services would be timed to connect to services to the main line thus providing through journeys. Many rural branch lines had no more than a handful of services each day.
For instance in the July 1922 Bradshaws Timetable Guide, Table 316 showed five departures from Framlingham at 07:20, 08:30, 12:40, 16:25 and 18:30. All services had connections to London Liverpool Street. All trains called at the two stations on the branch, taking 18 minutes to get to the junction station at Wickham Market.
From Wickham Market the trains departed at 07:56, 09:35, 13:14, 17:52 and 19:10. All services except the 09:35 departure had a connection from London Liverpool Street.
In 1865, when the Saffron Walden Railway opened, the GER provided some of its most modern rolling stock on opening day before reverting to stock of more dubious quality for general operation of the line.

Other services

The GER ran a number of trains from Ely and Cambridge to St Pancras after the Midland Railway completed the Tottenham and Hampstead Junction Railway in 1880. in 1914 there were three express services from St Pancras to Cambridge with the 12:22 pm reaching Cambridge in a creditable 71 minutes. Suspended during the First World War, these were briefly revived but stopped running in 1922.
Royal trains were also worked from St Pancras to Sandringham in Norfolk, and race day trains to Newmarket also operated into St Pancras.
The GER also operated services from Liverpool Street via the East London Line to New Cross and New Cross Gate with some services being extended to East Croydon.

Freight traffic

As the GER served a predominantly rural area, the majority of outward traffic was agricultural in nature. The opening of the Great Northern and Great Eastern Joint railway in 1882 gave the GER access to the coal fields in South Yorkshire and East Nottinghamshire and this became an important source of traffic for the railway.
There were a number of ports on the GER including King's Lynn, Great Yarmouth, Lowestoft, Felixstowe and Parkeston Quay. Fish traffic emanated from Lowestoft and Great Yarmouth.
One of the more obscure services the GER offered was the delivery of sea water. This service started in the 1870s and by 1880 it was reported that had been delivered on a single day. A redundant steam locomotive was employed in the task at Lowestoft and a number of fish and open carriage wagons were converted to saltwater tanks. The trains ran to London where the water was distilled into barrels and sold for sixpence. The sea water was used in baths and was still running as late as 1910 although the exact final date of operation is unknown.

Accidents and incidents

Locomotives

Prior to 1862

Prior to 1862 the companies that had built the various parts of the network operated locomotives from a variety of engineering companies. Generally the wheel arrangements were and for most classes of locomotives. It was not until 1850 that the Eastern Counties Railway under Gooch built a locomotive at the then newly opened Stratford Works. Number 20 was the first of a class of six locomotives. Slightly bigger improved versions of the class followed in 1853 and 1854.
In 1859 Sinclair started some form of standardisation with the Y Class locomotives, of which 110 were built by various engineering firms. The last locomotives of this class were withdrawn in 1894.

1862 to 1880

Sinclair's first design for the GER was the W class single drivers built between 1862 and 1867 by a number of engineering firms. Two of these locomotives were rebuilt from the to a configuration later in their lives and these two, plus one of the original locomotives, carried a canary yellow livery. Another member of this class carried a cream livery "encircled by garlands of roses" when it was used to haul a special train in 1863 for the Prince and Princess of Wales after their marriage at Westminster Abbey. These locomotives were responsible for running express services on the Great Eastern and in later life worked the Cathedrals Express to Lincoln and York.
Scrapping began in 1883 with the last two locomotives being withdrawn in 1894. The only other classes of locomotive that Sinclair designed were a class of five engines built for the North Woolwich line and a class of engines known as Scotchmen because they were built by Neilson,Reid & Co of Glasgow. Both classes entered service in 1864/65.
Generally Great Eastern locomotives carried a pea-green livery with black lining at this time.
When Johnson took over as CME, the GER was so short of locomotives that he persuaded the North British Railway to let the GER have five locomotives of a class being built by the Neilson, Reid & Co for them on loan. These formed the basis of the 40 strong 'little Sharpie' class, with 10 being built by Stratford Works and the other 30 by Sharp Stewart hence the nickname. The GER was working many trains on the London Tilbury and Southend Railway at this time and the Sharpies were deployed on this traffic. The last two were withdrawn in 1913.
The next Johnson class was an goods engine introduced in 1867 and 1868 and numbering 60 engines. A number of these engines had hinged chimneys for use through Silvertown tunnel on the North Woolwich line which had limited headroom. Scrapping began in 1888 with the final locomotive withdrawn in 1899.
Another more powerful design followed in 1872/3 and was known as the 477 class. Introduced in 1872 and 1873, this 50-strong class was built by 5 different companies, and was notable for being the first GER engines with a six-wheeled tender. All were withdrawn between 1898 and 1902.
The growth of London suburban traffic saw a requirement for additional tank engines. The GER borrowed some Metropolitan Railway A Class engines in the early 1870s and had 15 T7 class engines built, followed by some engines, one of which was the first locomotive to carry the distinctive GER Royal Blue livery.
The final locomotives introduced by Johnson were two C8 class locomotives which were built with no engine brakes and no dedicated tenders. These locomotives, numbers 305 and 306, were frequently used on royal trains and finished their careers as station pilots at St Pancras and Liverpool Street.
The 0-4-4T 61 class was the first Adams engine, and these 50 engines were built for suburban traffic. Ten locomotives followed between 1877 and 1879 and these lasted until 1907. Adams next design was a class known as Ironclads. Unfortunately these were not very successful on passenger traffic and were soon deployed on freight workings.
The next Adams locomotive was the first UK locomotive built in 1877. Another failure, this class of 15 locomotives were withdrawn after a working life of eight years, mostly working coal traffic between Peterborough and London.
Adams was succeeded by Massey Bromley who made the decision that henceforth more locomotives would be built at Stratford Works. Up to this point only 80 had been built.
However Bromley's first class of locomotives were built by Dubs and Kitson with 12 allocated to Stratford and four each to Norwich and Yarmouth sheds. One of these locomotives was later equipped with oil-burning capabilities, but the increasing demands of railway traffic saw these engines withdrawn by 1893 after a relatively short life. Bromley also designed an class which lasted some 24 years in traffic. He also designed the E10 class some of which were fitted with condensing gear and operated over the East London Line to New Cross and East Croydon.

1880 to 1922

Between 1880 and 1922 the Great Eastern produced some distinctive locomotives, and several of these have been preserved. Almost all of the Great Eastern's locomotives were, after 1880, built at Stratford Works and many lasted until the end of steam on the Great Eastern.
Express services on the GER were latterly in the hands of the Class S69 locomotives. Designed by James Holden and also known as the '1500 class', these engines were built at Stratford Works and William Beardmore. Ten engines were later built for the London and North Eastern Railway by Beyer Peacock, and it is one of these locomotives that is preserved today.
These locomotives were built to succeed the three classes of employed by the GER on express services which were becoming heavier as the railways prospered. Classes S46, D56 and H88 were collectively nicknamed "Claud Hamiltons" because the first S46 was named after the then-current chairman of the GER, Lord Claud Hamilton. Most of the "Clauds" were later rebuilt by the LNER; the final one was withdrawn in 1960 and scrapped.
Local suburban traffic was dealt with by numerous 2-4-2T and 0-6-0T locomotives belonging to several different classes. Stratford Engine Shed, for instance, had 163 2-4-2T engines of four classes. As trains got heavier, these locomotives were replaced by the Class L77 0-6-2T designed by Alfred John Hill and introduced in 1915. 134 were built, including a number after the LNER took over in 1923; one is preserved. The 2-4-2Ts, of which none survive, were mostly cascaded out of suburban traffic by the 1940s and worked until the late 1950s on branch lines.
Mention should also be made of the T26 s, which remained in service as the last locomotives of this wheel arrangement in Great Britain. Derived from the larger T19, 100 of these locomotives were built between 1891 and 1902 and worked a variety of trains across East Anglia. The last one, GER no. 490, was preserved as part of the National Collection when withdrawn in 1959. Today it resides at Bressingham Steam Museum, Norfolk. Some of the T19s, incidentally, were rebuilt as s between 1905 and 1908, having been taken off express work by the "Claud Hamiltons". As LNER class D13, the last worked until 1944.
GER goods designs of this period were invariably tender engines. The main freight class built by the GER was Worsdell's Y14 class. 289 examples were produced between 1883 and 1913 with most being built at Stratford Works, although a small number were built by Sharp Stewart. On 10–11 December 1891, the Great Eastern Railway's Stratford Works built one of these locomotives and had it in steam with a coat of grey primer in just 9 hours 47 minutes; this remains a world record. The locomotive then went off to run on Peterborough to London coal trains before coming back to the works for the final coat of paint. It lasted 40 years and ran a total of 1,. As freight traffic grew heavier after 1900, more 0-6-0 freight locomotives were built including classes F48, E72, G58 and D81 ; the Y14s, meanwhile, went into general local and branch line service, on both passenger and freight trains. The last Y14s ran until 1962, and no. 564 is preserved on the North Norfolk Railway; and G58 no. 1217 is in the National Railway Museum, York.
Shunting was generally in the hands of locomotives although of note were the Class J70 tram engines employed at Ipswich docks and on the Wisbech and Outwell tramway. This class of locomotive was later the inspiration of the Reverend Awdry's Toby the tram engine.
Finally mention must be made of the Decapod which was the first built in Britain, and possibly the only locomotive built for purely political purposes in order to block the passage through Parliament of a new rival scheme for an electric railway.

Livery

In the early years, the Great Eastern locomotive livery changed often, first being held in various shades of green and later black. In 1882 the well-known Ultramarine Blue livery was introduced. It consisted of Ultramarine Blue over an undercoat of French Grey, with black smokebox and vermillion buffer beams and lining. From 1915 locos were not given a top coat and ran in French Grey undercoat but with the boiler bands picked out in black.

Locomotive stock (1923)

Numbers of each GER locomotive class and running numbers in 1922, prior to the 1923 Grouping. Note that the numbering is not necessarily contiguous:
ClassLNER
Class
Wheel ArrangementTotalTraffic typeRunning Numbers
S69B1270Express Passenger1500–1570
T19D1358Passenger700–779 1012–1039
S46D1421Passenger1862–1900
D56D1590Passenger1790–1899 Note D14/15 numbered in same series
T26E4100Passenger407–506
C32F350Branch Passenger1040–1099
M15F4118Suburban Passenger71–189 211–244 572–591 650–679 791–800
M15F530Suburban Passenger91–96 100–110 141–147 170 179 188 589/90 780–788
G69F622Suburban Passenger1-10 61–70 789 790 Note F4/F5/F6 numbered in same series.
Y65F712Passenger1300–1311
S44G440Suburban Passenger1100–1139
N31J1418Freight604 951–998
Y14J15272Freight37–39 119–124 507–699 801–945
F48J1646Freight1150–1209
G58J1744Freight1153–1198 numbered in same series as J16. 1201–1239
E72J1810Freight1240–1249
T77J1925Freight1140–1149 1250–1269
D81J2025Freight1270–1294
E22J6520Shunting/Local Freight150–159 245–254
T18J6650Shunting/Local Freight275–326
R24J6751Shunting/Local Freight/Suburban Passenger11–20 161 164 169 199–264 327–336 397–406
C72J6820Shunting/Local Freight/Suburban Passenger21–30 41–50
R24 / S56J69109Shunting/Local Freight/Suburban Passenger51–60 81–90 160–168 190–198 265–274 305 328 335 337–396
C53J70 Tram12Tram type shunting locos125–139
J923Crane Tank enginesB C and D were Stratford works shunters.
L77N712Suburban Passenger1000–1011
B74Y45Dock/Works shunters210 226–229
209Y54Dock/Works shunters209 0228 230 231
G15Y6 tram6Dock/Works shunters0125 0126 0129 132–134 - all allocated to Wisbech and Outwell tramway

Preserved locomotives

The following GE locomotives are preserved:
NumberGE classLNER classWheel arrangementLocation
BR 61572S69B12North Norfolk Railway
GER 490T26E4Bressingham Steam and Gardens
GER 564Y14J15North Norfolk Railway
LNE 8217G58J17Barrow Hill Engine Shed
GER 87R24J67Bressingham Steam and Gardens
BR 69621L77N7East Anglian Railway Museum
GER 225GER Class 209Y5The Flour Mill, Lydney

there are plans to build two replica steam locomotives - a class D15 and an F5.

Coaching stock

Whilst not being at the forefront of carriage development, there were a number of interesting developments on the GER worth noting.

Main line

Even by 1900 bogie coaches were rare on GER, with trains of six-wheelers being the norm. It was not until 1897 that the first bogie stock appeared, and these were a comparatively short long. They contained two first-class compartments with lavatories sandwiched between four third-class compartments and a luggage compartment. The GER supplied separate luggage compartments for most of its main line stock. In 1900 an updated version had a corridor and third-class access to the lavatories but no corridor connections to other carriages.
In 1904 Stratford produced a complete corridor train. Despite the trend to bogied stock, Stratford still included three 6-wheeler carriages and a 4-wheeled luggage van in this formation. The other vehicles were all bogied stock and included a kitchen car. This train was also fitted for steam heating throughout and was employed on Liverpool Street - Parkeston Quay services.
In 1906 a new train set was produced for the North Country Continental train and in 1907 for the Norfolk Coast Express. The latter was notable for being the first all corridor set built by Stratford Works. However, with the restaurant sets built in 1900 being corridor coaches, more corridor coaches were being added to main line sets.
The livery of the stock was teak but in 1919 the decision was taken to paint all stock dark red. At the grouping in 1923 however all stock reverted to the teak livery.

Pullman

The introduction of Pullman cars to the GER was the idea of American General Manager Henry Worth Thornton. These were tried across the network and required payment of a supplementary fare. Unfortunately it was not a success although they were used on Liverpool Street - Harwich Continental trains for many years.

Dining and restaurant

In 1891 the Great Eastern introduced the first restaurant car to its North Country Continental service.
In 1899 Stratford Works produced four restaurant car sets consisting of three cars vestibuled together but without any corridor connections. This meant passengers had to spend the whole journey in the restaurant car. These were employed on services from Cromer and Yarmouth to Liverpool Street.

Suburban

In 1900 the majority of GER suburban trains were composed of four-wheeler carriages.
Interior design was spartan and around 1900 third-class passengers sat on bare boards five abreast, second-class passengers on cushions also five abreast, while first-class passengers sat four abreast and enjoyed more legroom. In 1899 James Holden produced the first six passengers sat abreast carriages in a 13-carriage, third-class only train. This set, which also included such modern features as slam lock doors and gas tail lamps became the model for future suburban carriage design.
In 1899 Holden built the first GER all-bogied suburban train and although a success, the next one did not follow until 1911.
The GER made every effort to maximise the capacity of its suburban carriages to deal with the rise in usage. In the early 1900s some four-wheeler carriages were cut in half longitudinally and a section inserted to make them wider in order to increase the capacity.
More bogied suburban trains followed in 1911 and were deployed on the Ilford, Gidea Park and Loughton services. By 1915 A. J. Hill instigated a policy of converting old four-wheel carriages into bogied stock and some 500 four-wheeled carriages were converted this way. The GER had a reputation for doing things on the cheap and this certainly was cheaper than building new stock.

Ships

The GER also operated a number of ferries.
ShipLaunchedTonnage Notes
1880969Built by Barrow Shipbuilding Company. The company's first steel ship and last paddle steamer on Harwich – Rotterdam route. Named after Adelaide Simpson the wife of GER director Lightly Simpson and launched by her.
Sold for scrapping in 1896
18941,745Built by Earle's Shipbuilding of Hull for Harwich – Hook of Holland route, and later transferred to Antwerp service in 1910 when replaced by modern tonnage. Scrapped in 1928
19192,957Built by John Brown and Company of Clydebank for Harwich – Antwerp service. She served as a Q-ship in the First World War. Scrapped in 1951
19102,570Built by John Brown and Company of Clydebank for Harwich – Hook of Holland service. Bombed and sunk off east coast of Scotland in May 1941
1864670Built by J & W Dudgeon at Cubitt Town on the River Thames for service Harwich – Rotterdam. Sold in 1888 to Earle's Shipbuilding, Hull and wrecked off Jamaica in 1909.
18941,745Built for Harwich – Hook of Holland service by Earle's Shipbuilding of Hull. Sister of SS Amsterdam. Sank whilst entering Hook of Holland in February 1907 with loss of 112 lives.
1871718Built as the "Richard Young" by J & W Dudgeon at Cubitt Town on the River Thames for the Harwich – Rotterdam service. Converted to a single screw by Earle's Shipbuilding in 1890 and renamed "Brandon", after which she was used for secondary and relief services. Scrapped in 1905.
192551Built by Rowhedge Ironworks. Launch used between Harwich, Felixstowe Docks and occasionally Shotley, Suffolk. Passed to LNER, British Railways and Orwell and Harwich Navigation Co. Ltd., who re-opened Felixstowe Docks service in 1962.
19202,949Built by John Brown and Company at Clydebank for the Harwich – Antwerp service. Bombed and sunk at Le Havre in 1940
19021,380Built by Gourlay Brothers, of Dundee for the Harwich – Antwerp service. Switched to Tilbury – Rotterdam when Harwich taken over by Admiralty in 1914. Captured by Germany in 1916 under command of Capt.Charles Fryatt who was tried and executed for an earlier war-like act. Scuttled 1918 at Zeebrugge. The ship was raised in 1919, sold at auction and repaired in 1920. She was eventually scrapped in 1929.
18861,196Built by Earle's Shipbuilding of Hull for service from Harwich and her career included Antwerp, Rotterdam and Hook of Holland routes. Sold in 1912 to Anglo-Ottoman Steamship Company.
SS Chelmsford18931,635Built by Earle's Shipbuilding of Hull for the Harwich – Hook of Holland service. The first triple expansion vessel for the company and inaugurated the new terminal at Hook of Holland in June 1893. Sold in 1910 to the Great Western Railway and renamed Bretonne where she was placed on the PlymouthNantes route.
1904820Built by Earle's Shipbuilding in 1904. Sunk during the First World War in 1917.
1875922Built by John Elder and Company, who were later known as Fairfield Shipbuilding and Engineering Company in Govan and launched the Harwich – Hook of Holland service. The vessel was named after the Chairman of the company. Sold in 1897 to the City of London as a cattle carrier. Vessel broken up in 1914.
18891,160Built by Earle's Shipbuilding of Hull and with her sister "Cambridge" operated the three main routes from Harwich. Was operating to neutral Holland when captured by Germany in 1916. She grounded at Kiel in 1918 and was scrapped in 1919.
19072,570Built by John Brown and Company at Clydebank as a replacement for the lost "Berlin" and was so successful that she was quickly followed by her sisters "Munich" and "St. Petersburg" on the Harwich – Hook of Holland service. The vessel was torpedoed and sunk in the North Sea in 1917 en route to Hook of Holland.
1902812A freight vessel which served until 1934.
18961,805Built by Earle's Shipbuilding of Hull for the Harwich – Antwerp service. Dr.Rudolf Diesel was travelling on the vessel in 1913 when he disappeared overboard in uncertain circumstances. The vessel was requisitioned by the Admiralty in 1915 and renamed Louvain, and was lost when torpedoed in the Aegean Sea in 1918.
191421Small launch used between Harwich and Shotley, Suffolk.
1896297Built by Earle's Shipbuilding of Hull and employed on local services and coastal excursions from Harwich. Sold in 1913 and became a River Thames excursion vessel.
1918892Built by Hawthorns of Leith as a cargo steamer. Renamed HMS Colchester in 1942 and back to Felixstowe in 1946. Sold in 1951 to the Limerick Steam Ship Company and renamed Kylemore.
19031,419Previously Kilkenny, the vessel served the Harwich – Antwerp route. She passed to the LNER in 1923 and was sold on again in 1926.
1866731A freight vessel which served the Harwich – Antwerp route from 1866 to 1873.
191421Small launch used between Harwich and Shotley, Suffolk.
186487Built by James Ash of Cubitt Town on the River Thames she served as a river steamer between Ipswich and Harwich. She was the first GER vessel having replaced the "Cardinal Wolsey" which was an Eastern Counties Railway ship on this service. Withdrawn 1873.
18831,067Built by Earle's Shipbuilding of Hull, she was designed with her sister "Norwich" for the Company's new quay at Parkeston, Essex. Operated on the Antwerp service until retired in 1905. Sold in 1906 to Shah Steam Navigation Co, Bombay, where she was broken up in 1909.
19031,419Purchased in 1917 from City of Dublin Steam Packet Company, renamed Frinton in 1919. She was built at Port Glasgow and served on the Dublin – Liverpool and Cork – Liverpool routes.
1880995Built by T and W Smith at North Shields she operated on the Harwich – Rotterdam service. Sold in 1893 to Earle's Shipbuilding of Hull.
19212,969Built by Armstrong Whitworth and Company at Newcastle, she was the final steamer ordered by the GER and entered service on the Harwich – Antwerp route. She was torpedoed by an air attack and was beached off Port Said in July 1942. Having been raised in September 1943 and towed back to her builders, the machinery damage caused her to be laid up 1945 and finally scrapped in 1948.
1879103Built in 1879 for the Woolwich Ferry and used in 1908.
19082,570Built by John Brown and Company of Clydebank for the Harwich – Hook of Holland service. A sister of "Copenhagen". Requisitioned in 1918, renamed St Denis and converted to a hospital ship. She retained her new name on return to GER and passed to LNER in 1923. She was relegated to relief and secondary services in 1932. Was scuttled when cornered in Amsterdam in 1940. Having been raised by the Germans, she had her name changed to "Barbara" and was found in Kiel in 1945 where she served as an accommodation ship for Kiel University. In 1950 she was towed to Sunderland and scrapped.
1907833Built by Earle's Shipbuilding in 1907. Sunk during the First World War in 1918.
1882295Built on the Thames she was employed on summer excursions from Harwich to Felixstowe and Ipswich. Sold to the Eastham Ferry Pleasure Gardens and Hotel Company in 1897 and renamed Onyx.
1900295Built by Gourlay Brothers, of Dundee. Used on local services and coastal excursions. Passed to LNER in 1923 and withdrawn in 1931. Scrapped in 1935.
18831,062Built by Earle's Shipbuilding at Hull as a sister to "Ipswich" for the Harwich – Antwerp service. Sold in 1905 to Channel Drydock & Shipbuilding Company, Harwich. Re-sold several times to companies in Cape Verde, Montevideo, New York and Mexico and sank in 1920.
1873114Built by Lewis and Stockwell in London and operated on Ipswich – Harwich ferry service with her sister "Stour". Sold in 1890 for scrapping.
1864700Built in 1864 by C. Lungley of Deptford, this ship was acquired by the Great Eastern Railway in 1872 and withdrawn in 1887
191211Small launch used between Harwich and Shotley. Withdrawn from ferry service in 1925, converted to work boat. Still in service in 1985.
18781,098Built by London and Glasgow Shipbuilding Company at Govan. Entered Harwich – Rotterdam service and transferred to the Hook of Holland service when it opened in 1893. Sold and scrapped in May 1896.
1871718Built by J & W Dudgeon at Cubitt Town in London. Served on the Harwich – Rotterdam service. Converted to single screw propulsion by Earle's Shipbuilding of Hull and was renamed Brandon in 1890.
18941,753Built by Earle's Shipbuilding at Hull and was launched as "Vienna". Entered Harwich – Hook of Holland service with sister "Amsterdam" Was transferred to the Antwerp service in 1910. Renamed "Roulers" when she entered Harwich – Zeebrugge service in 1920. Passed to LNER in 1923. Was withdrawn and scrapped in 1930.
19082,570Built by John Brown and Company at Clydebank and launched as "Munich" for the Harwich – Hook of Holland service. Renamed "St. Denis" in 1914 and returned to GER service with the new name after the war. Passed to LNER in 1923 and relegated to relief work in 1932. Scuttled in 1940 at Amsterdam, salvaged by the Germans and repaired. Scrapped 1950.
St George19062,456Built by Cammell Laird at Birkenhead for the GWR and was sold to Canadian interests in 1913. Purchased from the Canadian Pacific Railway in 1919 by GER. Passed to LNER in 1923 and scrapped in 1929.
186487Built by James Ash at Cubitt Town on the River Thames. A sister of "Ipswich" and operated as a river steamer from Ipswich to Harwich. Withdrawn in 1878 and replaced by a slightly larger newbuilding with the same name.
1878112Built by Thames Ironworks and Shipbuilding Company and a sister of the "Orwell". Based in Ipswich for the river service to Harwich. Replaced slightly smaller vessel of same name. Sold in 1900 for River Thames river service.
19102,570Built by John Brown and Company of Clydebank. A sister of the very successful "Copenhagen" for the Harwich – Hook of Holland service. Renamed Archangel in 1916 and used a cross-channel troop ship. Resumed service after the war and passed to LNER in 1923. The vessel was bombed and sank off Scotland in 1941.
1895245Built by Earle's Shipbuilding of Hull and employed on local services and coastal excursions from Harwich. Used as a picket ship at Harwich from 1914 to 1918. re-opened her pre-war services in 1919. Withdrawn in 1931.
18941,753Built by Earle's Shipbuilding as a sister for "Amsterdam". Entered Hook of Holland service. Transferred to the Antwerp service in 1910. Renamed Roulers in 1920 when transferred to the Harwich – Zeebrugge route. Passed to LNER in 1923 and withdrawn in 1930.
1890148Built as a sister to PS Middlesex for the Woolwich Ferry Service. Sold in 1908 to David Wilson and Sons for the service between North and South Queensferry on the Forth.
1903805Built by Gourlay Brothers, Dundee, for the Rotterdam–Harwich cargo service. Sank with all hands in the North Sea on 27 October 1908.
1864613Built by J & W Dudgeon at Cubitt Town on the Thames. Served on the Harwich – Rotterdam and Antwerp routes. Scrapped in 1887.

Cranes

The GER had a total of 11 breakdown cranes. Numbers 1a, 2a and 3a were built at Stratford Works in 1885 initially as hand cranes. They were converted to steam cranes at Stratford c 1905/06 and lasted into LNER days.
Three examples built by Cowans, Sheldon & Company were purchased between 1892 and 1899. With lifting capacity of they were employed on permanent way work.
Three more cranes were also built at Stratford c1907. The unnumbered example was lost at sea during the First World War whilst in War Department use. All three cranes had a lifting capacity of and were used as breakdown cranes. 4a and 5a worked from Ipswich and March.
The last two cranes were built by Ransomes & Rapier of Ipswich in 1913 and 1919. With a lifting capacity of both were employed on railway work until the 1960s. During LNER days SB4 was frequently used at publicity events to give people an aerial ride in an old wagon body. While 6a was transferred away from the GER shortly after 1923, SB4 was allocated to Stratford, Norwich and March before moving north to the Sheffield area.

Buses and horses

The May 1911 issue of the Great Eastern Railway Magazine stated the company had 1,750 horses the majority of which worked in the London area. Some wagon shunting work was carried out by horses but they would have found widespread work hauling delivery carts.
The Great Eastern built buses at Stratford and ran a number of omnibus services including Halesworth to Southwold.

Hotels and other business interests

The GER owned five hotels at the end of their existence in 1922.

The Great Eastern Hotel

The Great Eastern Hotel was located at Liverpool Street Railway station opened in May 1884 and enlarged in 1901. This was the biggest hotel on the system.
The large function room known as the Hamilton Hall was restored in the 1990s and re-opened as a pub. The hotel is still open today.

The Felix Hotel

The Felix Hotel located in Felixstowe was purchased by the GER in the 1920s. Built by the local Tollemache family in 1902, the hotel was lavishly equipped with tennis courts, winter gardens, a putting course, croquet lawns and a squash court. Hugely popular when Felixstowe was a resort by the 1930s it was in decline and sold to Fisons in 1952. Visitors included Kaiser Wilhelm in 1891 and in later post GER days, Wallis Simpson and Fred Perry. In the 1980s the building - then named Harvest House – was converted to apartments.

The Harwich Hotel

This was opened in 1865 and, although well-equipped and furnished, struggled to make a profit. The GER tried to sell it in early 1907 but it failed to meet its reserve price so closed in July 1907. THE GER refurbished the hotel and re-opened it in 1912 but when the First World War started in 1914 it became a naval hospital. After the war the GER opened the hotel again, but it closed in 1923. It was later used as council offices.

The Parkeston Quay Hotel

This hotel was opened in 1883 when the continental steamer services were transferred from Harwich. It had 26 rooms. It was part of the station buildings – later used as shipping agent's offices.

Sandringham Hotel

The Sandringham Hotel at Hunstanton was opened on 1 May 1876 and built by the Lynn and Hunstanton Railway. It was not acquired by the GER until 1 July 1890 when an act of parliament incorporated the Hunstanton and West Norfolk Railway. The GER expanded the premises in the early 1900s with rooms numbering over 100. The hotel prospered until the Second World War where it first housed the LNER Accounts department and was then requisitioned by the War department and used by various British and Canadian regiments during the rest of the war.
It was bought by Hunstanton Urban District Council in 1950 and used as offices and a library until 1959 when the property was converted into flats. The building was demolished in 1967.

Laundry

The GER built a laundry in 1888 in Colchester that supplied the hotels with bed linen, tablecloths etc. At one point it employed 70 people.

Farming

During 1916 the GER ran a poultry demonstration trains throughout East Anglia often visiting towns on market day. The purpose of this train was to encourage self-sufficiency during the food shortages of the First World War. Encouraged by the reception this train got, the GER purchased Dodnash Priory Farm in Bentley, Suffolk as a poultry demonstration farm. The hen houses were built at Stratford Works and had individual works numbers. By 1920 the farm was producing 40,000 eggs per month for the GER as well as chickens, turkeys, fruit and vegetables for the GER hotels, restaurants, dining cars and buffets. Another establishment at Chigwell has been doing this for some years previously.
Dodnash Priory also served as a rest home for GER horses. A siding about three quarters of a mile south of Bentley railway station on the down side served the farm.
The farm survived into LNER days being sold in 1927 when the farmer reached 70 and retired. The siding had been removed in May 1925.

People

Chief mechanical engineers

The chief mechanical engineers of the Great Eastern Railway were:
The chairmen of the Great Eastern Railway were:
Viscount Cranborne went on to be the British prime minister between 1885 and 1892 and between 1895 and 1903. Parkeston Quay is named after Cecil Parkes and the famous Great Eastern 4-4-0 class was named after Claud Hamilton.
Some details of other directors can be found.