Green Line (RTA Rapid Transit)


The Green Line is a light rail line of the RTA Rapid Transit system in Cleveland and Shaker Heights, Ohio, running from Tower City Center downtown, then east to Green Road near Beachwood. of track, including two stations, are shared with the rapid transit Red Line, the stations have low platforms for the Green Line and high platforms for the Red Line. The Green Line shares the right-of-way with the Blue Line in Cleveland, and splits off after passing through Shaker Square. The Green Line also operates through service to the Waterfront Line. All RTA light rail lines use overhead lines and pantographs to draw power.

Interurban portion

From Tower City to just east of East 55th Street, the Blue and Green Lines share track with the Red Line for 2.6 miles along a private right-of-way originally acquired in 1930 to bring intercity trains into Cleveland Union Terminal. The Tri-C–Campus District station and the East 55th station are shared by the heavy rail rapid transit Red Line and the light rail Blue and Green Lines on the same platform, an arrangement unique in North American rail transit. The shared stations have low platforms for the Blue and Green Lines directly adjacent to high platforms for the Red Line. RTA Central Rail yards and headquarters are located at the East 55th station, where trains of all rail lines are stored and serviced.
East of East 55th, the Blue and Green Lines split from the Red Line and travel east on a separate, dedicated, grade-separated right-of-way. A complex of tunnels existed at this junction to provide means for the Blue and Green Line trains to switch from right to left side running from East 55th to Tower City, but right side running is now used throughout the system, and the tunnels have been closed.
The private right of way extends from this junction to Woodhill Road at the western end of Shaker Boulevard and then below grade through an excavated cut in the median of Shaker Boulevard to Shaker Square. Along this portion of the lines are East 79th station, Woodhill station and East 116th Station. The lines then rise to street level at Shaker Square.

Suburban portion

From Shaker Square eastward, both lines enter Shaker Heights and operate at street level with grade crossings, reflecting this portion of the lines' history as streetcar lines. The Green Line separates from the Blue Line just east of Shaker Square at, with the Green Line continuing east in the median of Shaker Boulevard. The station-stops east of Shaker Square are adjacent to street intersections and most comprise merely concrete platforms with simple shelters. The central median of Shaker Boulevard expands at Warrensville Road—it was originally planned for a high-speed parkway—and the Green Line continues along this median with Warrensville Road crossing on a bridge overhead. There is also a bridge at Green Road, although the station is actually just west of the bridge and only layover tracks extend beneath the bridge. The Green Line terminates at Green Road and Shaker Boulevard.

Designations

When the Shaker Heights Rapid Transit was absorbed into the RTA, The Green line held the designation of 67A. This was later changed to 67AX. This remained with the opening of the Waterfront "line" extension of the Blue and Green lines. In the mid 2010s, the Waterfront line became a separate designation from the 67 and 67A Blue and Green lines. The Waterfront line was briefly designated as 67W. The three routes have united under the 67 designation, which is now internal and no longer shown on official timetables.

History

The Green Line is the direct, continuously operating descendant of the privately-owned Cleveland & Youngstown Railroad, Cleveland Interurban Railroad and later the municipally owned Shaker Heights Rapid Transit, built as a branch of the Shaker Heights streetcar lines to connect the streetcar suburb of Shaker Heights to downtown Cleveland. This line, along with the Blue Line, were the only ones to survive the bustitution of Cleveland's transit system, partly due to their use of grade-separated trackage to across much of the east side of Cleveland.

Cleveland & Youngstown Railroad

The Van Sweringen brothers purchased the land of what is now Shaker Heights in 1906 intending to create a planned suburban community. They knew that the success of their plans depended upon the availability of streetcar service to downtown Cleveland, so they persuaded the Cleveland Railway to extend its Euclid Heights trolley line along Fairmount Boulevard from Cedar Road to Lee Road, which was completed by 1907.
To improve travel times to downtown, the Vans organized the Cleveland and Youngstown Railroad. On October 27, 1911, with a population of only 200, the Village of Shaker Heights was incorporated, and two years later on December 17, 1913, the first section of the C&Y opened, from Coventry Road east down the median of the future Shaker Boulevard to Fontenay Road. The line connected to downtown Cleveland via a line along Coventry Road, north to the 1907 Shaker Heights streetcar line on Fairmount Boulevard in Cleveland Heights. On May 20, 1915, the eastern terminus of the C&Y was extended from Fontenay Road to Courtland Boulevard.

Cleveland Interurban Railroad

Initially, the Shaker Line operated independently, being in operation seven years prior to the opening of what is now the Blue Line from Lynnfield to East 55th. When the Moreland line opened in April of 1920, the Shaker line continued to use the old line through Cleveland Heights. With the opening of the connection from Coventry to Shaker Square on August 16, 1920, the old line became a shuttle to Fairmount, and later closed on March 12, 1923.
There have been several other proposals to connect the Shaker Boulevard rapid transit line with the streetcar line on Fairmount Boulevard. The Fairmount line was perpetually plagued with low ridership, and a connection to the Shaker line was seen as a way to improve service and make the Fairmount line more attractive to riders. In 1922, Cleveland Railway proposed a connection from Moreland Circle along North Moreland Boulevard and what is now Fairhill Road to the existing tracks on Coventry Road. The trackage for the entire connection would run in the median of divided boulevards.
As the Van Sweringens' railroad plans grew, they constructed a new Union Terminal for Cleveland. Cleveland Union Terminal opened in 1930, along with a new grade-separated right-of-way with side-by-side lines for steam railroads and interurban streetcars, including the CIRR. Although their plans for another interurban line never materialized, the CIRR immediately began operations via the new right-of-way into the north part of CUT specially reserved for interurban train service. The CIRR no longer needed to run on city streetcar tracks and the ramp to Broadway and East 34th Street was removed. The first CIRR trains rolled into CUT on July 20. A further extension of the Shaker Boulevard line moved the eastern terminus to Green Road on November 1 1936.

Shaker Heights Rapid Transit

On September 6, 1944, the City of Shaker Heights took over the financially struggling lines and began operating them as Shaker Heights Rapid Transit. The city lacked funds for major line extensions. However, it did modernize the fleet with the purchase of PCC cars beginning in 1947.
Prior to the conversion of the Fairmount streetcar line to bus service in 1948, the Cleveland Transit System, which had taken over operation of the Cleveland streetcar lines in 1941 attempted to have the Shaker Heights Rapid Transit take over the Fairmount line from Coventry Road to its terminus at Canterbury Road. The same route as in 1922 was proposed to connect the lines, and CTS further proposed extending the Fairmount line eastward to Fairmount Circle where it could attract more riders from John Carroll University. However, Shaker Heights lacked the money to undertake the work, and Fairmount Boulevard streetcar service soon ended.
In 1955 the Cleveland Transit System opened the first section of the city's new rapid transit line, now known as the Red Line. It used much of the right-of-way and some of the catenary poles from the Van Sweringen's planned east-west interurban line adjacent to the NYC&StL tracks. The first section of the CTS rapid transit east from Cleveland Union Terminal included and two stations shared with the Shaker Heights Rapid Transit line, necessitating split platforms with low-level sections and high-level sections.

Greater Cleveland Regional Transit Authority

By the 1970s the City of Shaker Heights was struggling to maintain the Shaker Heights Rapid Transit and in Cleveland, CTS was facing financial problems with its rapid transit and bus system. Significant federal money was available, but only if a regional transit system was formed. In 1974, the Greater Cleveland Regional Transit Authority was organized to take over the municipal transit system in Cleveland and others throughout Cuyahoga County. Voters approved a county-wide sales tax increase to help subsidize the transit system and RTA officially took over the Shaker Heights Rapid Transit lines on July 14, 1975. On September 30, 1979, RTA adopted a new designation for the rapid transit lines. The Airport-Windermere Line became the Red Line, while the Shaker Rapid Transit lines became the Green and Blue Lines.
In 1980, RTA undertook a complete renovation of the Green Line, with new track, ballast, poles and overhead wiring. Existing stations were demolished and new stations constructed. The project necessitated closing the Green Line east of Shaker Square for most of the summer of 1980, with substitute bus shuttles and single-tracking along the remainder of the line from East 55th Street to Shaker Square. To run on the renovated lines, a fleet of new LRVs were purchased from an Italian firm, Breda Costruzioni Ferroviarie, to replace the aging PCC cars. The new line was dedicated on October 30, 1981.

Fare collection

Fares are paid upon entering when traveling eastbound and upon leaving when traveling westbound. Fares are collected on board the train except at Tower City Station, where they are collected at faregates entering or leaving the station. Certain other stations, notably those on the Waterfront Line, have facilities for collecting fares, but those facilities are not used except during special events, such as during Cleveland Browns games at West 3rd Street Station.

Schedule

Blue and Green Line trains operate from approximately 3:40 a.m. to 1:00 a.m. daily. On weekdays, each line operates every 10 minutes during rush hour and every 30 minutes at other times. Service between Tower City and Shaker Square operates every 5 minutes during rush hour and every 15 minutes at other times. Service on the Waterfront Line is limited to approximately every three westbound trains from 6:35 a.m. to 8:50 a.m. and again from 3:35 p.m. through 7:20 p.m. Between 8:50 a.m. and 3:35 p.m. and again between 7:20 p.m. and 10:20 p.m., all westbound trains travel along the Waterfront Line. No Waterfront Line service is provided between 10:45 p.m. and 6:35 a.m.
On weekends, each line operates every 30 minutes. Service between Tower City and Shaker Square operates every 15 minutes and all westbound trains from 9:20 a.m. through 10:20 p.m. operate on the Waterfront Line.

Rail Replacement Bus

During rail shutdowns, RTA uses replacement buses with the destination signs "67R GREEN LINE TO ______". Green Line shuttle buses run between Tower City and Green Road.

Rolling stock

The Blue and Green Lines use a fleet of 48 light rail vehicles manufactured by Breda Costruzioni Ferroviarie in 1980 and 1981. Each car is long, high, and wide and is articulated with operator cabs at each end, seating 84 passengers in 42 double transverse seats. The units are numbered 801–848. RTA needs 34 of the cars for regular use, and requires only 17 to operate currently scheduled service.
The cars originally had white exteriors with broad orange and red stripes, and an interior finished in earth tones with faux wood paneling and orange and brown vinyl padded seats. With the opening of the Waterfront Line in 1996, RTA renovated five cars with blue and white exteriors, gray interiors with new gray and blue fabric-covered seats, and portraits of famous Clevelanders.
The fleet is over 25 years old, and RTA is currently renovating up to 34 cars with the hope of making them last for another 15 years. The renovated cars have silver exteriors with blue and red stripes, and gray and silver interiors with blue and red seats.
The Breda LRV cars replaced a fleet of PCC cars, some built for the Shaker Rapid Transit in 1947 and some purchased in 1953 and 1959.

Stations

Stations between East 55th and Shaker Square were not served by the Green Line until August 16, 1920.
StationDate openedDate rebuiltLocationConnections / notes
July 20, 1930December 17, 1990DowntownRTA Rapid Transit: Red Line, Blue Line, Waterfront Line, HealthLine
RTA Bus: B-Line, C-Line and E-Line Trolleys; 1, 3, 8, 11, 14, 15, 19, 22, 26, 38, 39, 39F, 45, 51, 51A, 51B, 51C, 53F, 55A, 55B, 55C, 76, 77F, 79, 79A, 81, 90F, 246, 251, 263
METRO RTA: 60, 61
PARTA: 100
SARTA: 4
Laketran 10, 11, 12
July 20, 1930August 18, 2003
September 24, 2018
CentralRTA Rapid Transit: Red Line, Blue Line
RTA Bus: 15, 19, 76
Formerly East 34th–Campus
April 11, 1920October 11, 2011North BroadwayRTA Rapid Transit: Red Line, Blue Line
RTA Bus: 16
April 11, 1920October 30, 1981KinsmanRTA Rapid Transit: Blue Line
RTA Bus: 2
April 11, 1920October 30, 1981
October 23, 2012
Kinsman /
Woodland Hills
RTA Rapid Transit: Blue Line
RTA Bus: 10, 11
Formerly Woodhill
April 11, 1920October 30, 1981
March 8, 2019
Woodland HillsRTA Rapid Transit: Blue Line
RTA Bus: 8
Formerly East 116th
April 11, 1920October 1952
July 1986
Buckeye–ShakerRTA Rapid Transit: Blue Line
RTA Bus: 11, 48, 48A
Formerly Moreland Circle
December 17, 1913October 11, 1980Buckeye–Shaker /
Shaker Heights
December 17, 1913October 11, 1980Shaker Heights
December 17, 1913October 11, 1980Shaker Heights
December 17, 1913October 11, 1980
October 17, 2017
Shaker HeightsRTA Bus: 40
December 17, 1913October 11, 1980Shaker Heights
May 20, 1915October 11, 1980Shaker Heights
May 20, 1915October 11, 1980Shaker Heights
December 6, 1928October 11, 1980.
November 22, 2016
Shaker HeightsRTA Bus: 41, 41F
November 1, 1936October 11, 1980Shaker Heights
November 1, 1936October 11, 1980Shaker Heights
November 1, 1936October 11, 1980
2001
Shaker HeightsRTA Bus: 34, 94