Greenock and Ayrshire Railway
The Greenock and Ayrshire Railway ran from Greenock, Scotland to Bridge of Weir, connecting there to the Glasgow and South Western Railway and making a through connection between Glasgow and Greenock. It closed progressively between 1959 and 1983.
Formation
By the 1860s the Glasgow and South Western Railway was established in the south-western quadrant of Scotland, but the rival Caledonian Railway was dominant in the central region, with an important branch line to Greenock. There was bitter rivalry between the two companies, and each sought to retain primacy in its own area.In 1864 an independent Bridge of Weir Railway, encouraged by the G&SWR, opened their line from Johnstone to Bridge of Weir. At that time the G&SWR was interested in reaching Greenock, where there was lucrative business associated with coastal and international shipping. The Caledonian Railway had a monopoly of the rail connection, and in October 1864 the Chairman of the G&SWR negotiated with the Provost of the Burgh of Greenock regarding improved rail and harbour facilities. The Caledonian Railway ended in the town at Cathcart Street, and had restricted rail access to the East Harbour involving street running. The growing trade in passenger steamer transits to towns and resorts in the Firth of Clyde was limited by the necessary walk from the station to the berth.
The G&SWR offered the possibility of a new direct rail connection to a new harbour to the north-west of the town, which the Burgh was prepared to develop. This was a prodigious scheme for both parties, involving lengthy tunnelling and the excavation and construction of the harbour facilities at a cost of £250,000. The pier cost a further £100,000. The railway part of the scheme was to involve the upgrading of the Bridge of Weir line, the construction of a short line from Cart Junction to Elderslie, and a new line from Bridge of Weir to Greenock.
The Greenock and Ayrshire Railway was authorised on 5 July 1865, with capital of £350,000, but money had become scarce again and the G&SWR was obliged to subscribe for £300,000 of the share capital.
Opening
Construction proceeded and the line opened to goods trains on or soon after 30 August 1869, and to passengers on 23 December 1869; the line was worked by the G&SWR. The Greenock terminal was named Albert Harbour, and as well as Clyde coastal shipping, there was a considerable emigrant trade at this time. Intermediate traffic was relatively insignificant and passenger traffic between Glasgow and Paisley and Greenock was in direct competition, both routes using the Bridge Street station in Glasgow. A fares war quickly took hold in 1870, but in early 1871 a common fares arrangement was agreed, by which the G&SWR received 42.68% of ticket receipts. Evidently the supposed advantage of proximity to the quayside at Greenock did not result in dominance in traffic share. Goods traffic to Greenock could use either company to reach the East Dock or the west via the G&SWR.Amalgamation
The Greenock and Ayrshire had been nominally independent but the G&SWR had £300,000 of the £350,000 capital; an amalgamation Bill was enacted on 29 June 1872, and it became effective on 1 August 1872. The line was now part of the G&SWR.Subsequent history
The Greenock Harbour Trust had been continuing improvement of the harbour, providing alongside berthing for quick turnrounds, and with more capacity. In 1875, Prince Alfred, Duke of Edinburgh, landed at the pier and the opportunity was taken to rename the harbour facility Prince's Pier. The station itself was renamed at the same time. In 1894 the station was relocated a little to the north-west, closer to the steamer berths, and providing more lavish facilities, and with six italianate towers.In 1880 the harbour facilities to the eastern side of Greenock were being further extended, at Garvel, at the east end of the waterfront. When completed it provided three miles of quays with the most modern mechanical handling equipment. The G&SWR wished to retain its place in the marine activity and decided to build a connecting line eastwards from Lynedoch, requiring a short tunnel. The line opened on 5 August 1886; the junction at Lynedoch was named Cartsburn Junction, and G&SWR trains reversed there, descending to a spur at Inchgreen, where they reversed again to reach the quay. The Caledonian Railway also had a connection to the new facility; their access was somewhat easier. The G&SWR's branch had cost £262,467.
The west curve at Johnstone, giving through running from that station towards Greenock, was an accident of history. Use of the curve by passenger trains was discontinued on 1 October 1900.
1936 runaway
David Smith records an accident:A most destructive breakaway occurred on... 10 April 1936. A train of 37 wagons of cattle left Albert Harbour for Carlisle at 9.00 p.m., double headed, the pilot engine being a 2-6-4 tank. They were up abouta train for Glasgow. the runaway crashed into no. 637. There was terrible destruction of wagons and beasts... Fifty-one of the cattle were killed or had to be slaughtered.
Closure
Stopping services over the northern section of line, beyond Kilmacolm, were cut in February 1959 although goods trains, and also special boat trains from Glasgow St Enoch continued to run until 30 November 1965; during this period the line beyond Kilmacolm was singled. Stopping passenger services ceased running beyond Kilmacolm in February 1959. However the Glasgow St Enoch railway station to Greenock Prince's Pier Ocean Liner boat trains continued running until 30 November 1965. The tracks were then cut at Kilmacolm in September 1966.However this was not the end of rail connection to Princes Pier: it was redeveloped as a container terminal, operated by the Clyde Port Authority, and rail connection was reinstated in 1971. The original line and the James Watt Dock connection were close alongside the Wemyss Bay line from Port Glasgow immediately east of Lynedoch, and a connection was made there: so the original G&AR line was re-opened to container traffic west of Lynedoch. The line was now single and laid in the centre of the tunnels, enabling 8 foot containers to pass.
In fact this did not prove a long-term opportunity, and rail movement became dormant for many years; containers in use were larger than the original 8-foot size, and cannot be moved through the tunnels, and the line was officially closed on 30 September 1991.
The 1966 closure at Greenock left the line open from Elderslie to Kilmacolm; local passenger services continued, using diesel multiple units. That section too closed completely on 10 January 1983.
Topography
The line ran from Bridge of Weir to Greenock, with a connection from Cartsburn Junction to James Watt Dock.The main line opened to passengers on 23 December 1869; locations were:
- Connection at Bridge of Weir to the former Bridge of Weir Railway;
- Bridge of Weir station; the Bridge of Weir Railway station there was by-passed;
- Upper Port Glasgow; goods station only;
- Cartsburn Junction; not a passenger station;
- Lynedoch; renamed Greenock Lynedoch May 1898; closed 2 February 1959
- Greenock, Albert Harbour; renamed Greenock Princes Pier 1 May 1875; relocated a short distance north-west 25 May 1894; closed except to boat trains 2 February 1959; closed 30 November 1965.
The James Watt branch was goods only; locations were
- Cartsburn Junction;
- Inch Green; reversing siding;
- James Watt Dock.