Grytdalen Hydroelectric Power Station
The Grytdalen Hydroelectric Power Station is a hydroelectric power station in Valsøyfjord in the municipality of Heim in Trøndelag county, Norway. It stands about south of the village of Engan. It is a run-of-river plant that utilizes a drop from the lake Englivatnet to the intake dam of the Valsøyfjord Hydroelectric Power Station. It has a Francis turbine and operates at an installed capacity of, with an average annual production of about 5.3 GWh. The plant came into operation in March 2012 and is owned by Svorka Energi.