Guangzhou–Foshan–Zhaoqing intercity railway


Guangzhou–Foshan–Zhaoqing intercity railway, also known as Guangfozhao intercity railway or Foshan–Zhaoqing intercity railway, is a regional railway within Guangdong province, China. It connects the provincial capital of Guangzhou with Zhaoqing, via Foshan. It is a part of the Pearl River Delta Metropolitan Region intercity railway network. It commenced operations on March 30, 2016.

Overview

From Guangzhou to Foshan, the line is 53 km long, and it continues for another 112.9 km to Zhaoqing. Between Guangzhou and Foshan, the line has a westerly heading. From Foshan West railway station, the line continues west through Shishan Town in Nanhai District, across Shishan Industrial Park, over the Guangzhou–Zhuhai railway and entering Sanshui District. The line then crosses the Bei River and passes through the Zhaoqing High-tech Industrial Development Zone. The line then turns southwest, crossing the Sui river, the Guangzhou–Maoming Railway and State Road 321, and passes through Dinghu District before reaching Zhaoqing. The line has 19 stations, 8 between Guangzhou and Foshan, and 11 between Foshan and Zhaoqing. The line is connected to the Guiyang–Guangzhou high-speed railway and the Nanning–Guangzhou high-speed railway. The operational speed on the line is 200 km/h.

History

Construction of the Foshan and Sanshui segments of the line started on September 29, 2009 and June 18, 2010 respectively. As of April 20, 2011, the planned terminus was tentatively set at Dachong railway station.
On March 8, 2012 the line was renamed from "Foshan–Zhaoqing intercity railway" to "Guangzhou–Zhaoqing intercity railway". Plans for the line were also revised, extending the line to Guangzhou South railway station.
In July 2012, the plans were revised yet again, with the line being extended to Zhaoqing railway station. The route for this section was determined by September 2012.
Construction of the Dachong elevated viaduct started on December 18, 2012, and construction of the Guangzhou-Foshan segment of the line started in 2013. The line commenced operations on March 30, 2016.

Stations