Halifax Armoury


The Halifax Armoury is a military structure in central Halifax, Nova Scotia, Canada. The armoury is the home base of 36 Signal Regiment, The Princess Louise Fusiliers, and several other reserve units.

Architecture

The armoury was designed in 1895 by Chief Dominion Architect Thomas Fuller, and was opened the next year and work on the structure was completed in 1899. While the sandstone exterior is based on a medieval castle, it was actually one of the most advanced structures of its day. It was pioneering in its use of a series of Fink trusses to create a large interior space with no columns or walls, and is today the oldest surviving example of such a building. It was also one of the first buildings in Halifax to be lit by electricity. The plan is similar to that of Fuller's Toronto Armoury, completed in 1894.

History

It has played an important part in many Canadian wars, being an important transit point for soldiers before departing by ship for the Boer War and both World Wars. It was damaged in the Halifax Explosion in 1917, the west wall being displaced by about 60 centimetres. Still usable after the explosion, the armoury provided shelter for many who had lost their homes.
The armoury again served as an emergency shelter during the 1945 Bedford Magazine explosions, when thousands of North End residents evacuated toward the Halifax Common. The St. John Ambulance Brigade and the army worked together to shelter the evacuees for about 25 hours following the first explosion.
The building was designated a National Historic Site of Canada in 1989. In 1991, it was designated a Classified Federal Heritage Building.

Restoration

Major renovations were announced in January 2017 to restore the west wall to its original position after being damaged in 1917 by the powerful blast of the Halifax Explosion. Up to 20 per cent of the wall required replacement and it was decided to use stone from the original quarry after the source was located in Beckwith, near Pugwash, Nova Scotia.

First phase

The first phase of the rehabilitation project centres on restoring the damaged west wall, as a tilt caused by the Halifax Explosion has gradually been increasing. Reconstruction of the wall is expected to be complete in October 2019.

Second phase

The restoration's second phase is expected to be complete by 2024. The interior will be restored, as will the other three facades as well as the building's roof.