Hanford Site


The Hanford Site is a decommissioned nuclear production complex operated by the United States federal government on the Columbia River in Benton County in the U.S. state of Washington. The site has been known by many names, including Hanford Project, Hanford Works, Hanford Engineer Works and Hanford Nuclear Reservation.
Established in 1943 as part of the Manhattan Project in Hanford, south-central Washington, the site was home to the B Reactor, the first full-scale plutonium production reactor in the world. Plutonium manufactured at the site was used in the first nuclear bomb, tested at the Trinity site, and in Fat Man, the bomb detonated over Nagasaki, Japan.
During the Cold War, the project expanded to include nine nuclear reactors and five large plutonium processing complexes, which produced plutonium for most of the more than 60,000 weapons built for the U.S. nuclear arsenal. Nuclear technology developed rapidly during this period, and Hanford scientists produced major technological achievements. Many early safety procedures and waste disposal practices were inadequate, and government documents have confirmed that Hanford's operations released significant amounts of radioactive materials into the air and the Columbia River.
In 1989, the State of Washington, US Environmental Protection Agency, and the US Department of Energy entered into the Tri-Party Agreement which sets targets, or milestones, for cleanup. EPA and Ecology share regulatory oversight based on CERCLA and RCRA.
The weapons production reactors were decommissioned at the end of the Cold War, and decades of manufacturing left behind of high-level radioactive waste stored within 177 storage tanks, an additional of solid radioactive waste, and areas of heavy Technetium-99 and uranium contaminated groundwater beneath three tank farms on the site as well as the potential for future groundwater contamination beneath currently contaminated soils. In 2011, DOE, the federal agency charged with overseeing the site, "interim stabilized" 149 single-shell tanks by pumping nearly all of the liquid waste out into 28 newer double-shell tanks. Solids, known as salt cake and sludge, remained.
DOE later found water intruding into at least 14 single-shell tanks and that one of them had been leaking about per year into the ground since about 2010. In 2012, DOE discovered a leak also from a double-shell tank caused by construction flaws and corrosion in the bottom, and that 12 double-shell tanks have similar construction flaws. Since then, the DOE changed to monitoring single-shell tanks monthly and double-shell tanks every three years, and also changed monitoring methods. In March 2014, the DOE announced further delays in the construction of the Waste Treatment Plant, which will affect the schedule for removing waste from the tanks. Intermittent discoveries of undocumented contamination have slowed the pace and raised the cost of cleanup.
In 2007, the Hanford site represented 60% of high-level radioactive waste by volume managed by the US Department of Energy and 7–9% of all nuclear waste in the United States. Hanford is currently the most contaminated nuclear site in the United States and is the focus of the nation's largest environmental cleanup. Besides the cleanup project, Hanford also hosts a commercial nuclear power plant, the Columbia Generating Station, and various centers for scientific research and development, such as the Pacific Northwest National Laboratory, the Fast Flux Test Facility and the LIGO Hanford Observatory.
On November 10, 2015, it was designated as part of the Manhattan Project National Historical Park alongside other sites in Oak Ridge and Los Alamos.

Geography

The Hanford Site occupies —roughly equivalent to half of the total area of Rhode Island—within Benton County, Washington. This land is closed to the general public. It is a desert environment receiving under 10 inches of annual precipitation, covered mostly by shrub-steppe vegetation. The Columbia River flows along the site for approximately, forming its northern and eastern boundary. The original site was and included buffer areas across the river in Grant and Franklin counties. Some of this land has been returned to private use and is now covered with orchards, vineyards, and irrigated fields.
In 2000, large portions of the site were turned over to the Hanford Reach National Monument. The site is divided by function into three main areas. The nuclear reactors were located along the river in an area designated as the 100 Area; the chemical separations complexes were located inland in the Central Plateau, designated as the 200 Area; and various support facilities were located in the southeast corner of the site, designated as the 300 Area.
The site is bordered on the southeast by the Tri-Cities, a metropolitan area composed of Richland, Kennewick, Pasco, and smaller communities, and home to nearly 300,000 residents. Hanford is a primary economic base for these cities.

Climate

Early history

The confluence of the Yakima, Snake, and Columbia rivers has been a meeting place for native peoples for centuries. The archaeological record of Native American habitation of this area stretches back over ten thousand years. Tribes and nations including the Yakama, Nez Perce, and Umatilla used the area for hunting, fishing, and gathering plant foods. Hanford archaeologists have identified numerous Native American sites, including "pit house villages, open campsites, fish farming sites, hunting/kill sites, game drive complexes, quarries, and spirit quest sites", and two archaeological sites were listed on the National Register of Historic Places in 1976. Native American use of the area continued into the 20th century, even as the tribes were relocated to reservations. The Wanapum people were never forced onto a reservation, and they lived along the Columbia River in the Priest Rapids Valley until 1943. Settlers moved into the region in the 1860s, initially along the Columbia River south of Priest Rapids. They established farms and orchards supported by small-scale irrigation projects and railroad transportation, with small town centers at Hanford, White Bluffs, and Richland.

Manhattan Project

During World War II, the S-1 Section of the federal Office of Scientific Research and Development sponsored an intensive research project on plutonium. The research contract was awarded to scientists at the University of Chicago Metallurgical Laboratory. At the time, plutonium was a rare element that had only recently been isolated in a University of California laboratory. The Met Lab researchers worked on producing chain-reacting "piles" of uranium to convert it to plutonium and finding ways to separate plutonium from uranium. The program was accelerated in 1942, as the United States government became concerned that scientists in Nazi Germany were developing a nuclear weapons program.
On March 10, 1945, the Hanford Plutonium Works had been temporarily shut down due to Japanese bomb carrying balloon attacks, which had been ongoing since November 3, 1944. The general public was not made aware of it, until August 31, 1945, when such information was released to the public, World War 2 ended two days later, on September 2, 1945.

Site selection

In September 1942, the Army Corps of Engineers placed the newly formed Manhattan Project under the command of Brigadier General Leslie R. Groves, charging him with the construction of industrial-size plants for manufacturing plutonium and uranium. Groves recruited the DuPont Company to be the prime contractor for the construction of the plutonium production complex. DuPont recommended that it be located far away from the existing uranium production facility at Oak Ridge, Tennessee. The ideal site was described by these criteria:
In December 1942, Groves dispatched his assistant Colonel Franklin T. Matthias and DuPont engineers to scout potential sites. Matthias reported that Hanford was "ideal in virtually all respects", except for the farming towns of White Bluffs and Hanford. General Groves visited the site in January 1943 and established the Hanford Engineer Works, codenamed "Site W". The federal government quickly acquired the land under its war powers authority and relocated some 1,500 residents of Hanford, White Bluffs, and nearby settlements, as well as the Wanapum people, Confederated Tribes and Bands of the Yakima Nation, the Confederated Tribes of the Umatilla Indian Reservation, and the Nez Perce Tribe.

Construction

The Hanford Engineer Works broke ground in March 1943 and immediately launched a massive and technically challenging construction project. DuPont advertised for workers in newspapers for an unspecified "war construction project" in southeastern Washington, offering "attractive scale of wages" and living facilities.
The construction workers lived in a construction camp near the old Hanford townsite. The administrators and engineers lived in the government town established at Richland Village, which eventually had accommodation in 4,300 family units and 25 dormitories.
Construction of the nuclear facilities proceeded rapidly. Before the end of the war in August 1945, the HEW built 554 buildings at Hanford, including three nuclear reactors and three plutonium processing canyons, each long.
To receive the radioactive wastes from the chemical separations process, the HEW built "tank farms" consisting of 64 single-shell underground waste tanks. The project required of roads, of railway, and four electrical substations. The HEW used of concrete and 40,000 short tons of structural steel and consumed $230 million between 1943 and 1946.

Plutonium production

The B Reactor at Hanford was the first large-scale plutonium production reactor in the world. It was designed and built by DuPont based on an experimental design by Enrico Fermi, and originally operated at 250 megawatts. The reactor was graphite moderated and water cooled. It consisted of a, graphite cylinder lying on its side, penetrated through its entire length horizontally by 2,004 aluminium tubes. of uranium slugs, diameter by long, sealed in aluminium cans went into the tubes. Cooling water was pumped through the aluminium tubes around the uranium slugs at the rate of per minute.
Construction on B Reactor began in August 1943 and was completed on September 13, 1944. The reactor went critical in late September and, after overcoming neutron poisoning, produced its first plutonium on November 6, 1944. Plutonium was produced in the Hanford reactors when a uranium-238 atom in a fuel slug absorbed a neutron to form uranium-239. U-239 rapidly undergoes beta decay to form neptunium-239, which rapidly undergoes a second beta decay to form plutonium-239. The irradiated fuel slugs were transported by rail to three huge remotely operated chemical separation plants called "canyons" that were about away.
A series of chemical processing steps separated the small amount of plutonium that was produced from the remaining uranium and the fission waste products. This first batch of plutonium was refined in the 221-T plant from December 26, 1944, to February 2, 1945, and delivered to the Los Alamos laboratory in New Mexico on February 5, 1945.
The material was used in Trinity, the first nuclear explosion, on July 16, 1945.
Two identical reactors, D Reactor and F reactor, came online in December 1944 and February 1945, respectively. By April 1945, shipments of plutonium were headed to Los Alamos every five days, and Hanford soon provided enough material for the bombs tested at Trinity and dropped over Nagasaki. Throughout this period, the Manhattan Project maintained a top secret classification. Until news arrived of the bomb dropped on Hiroshima, fewer than one percent of Hanford's workers knew they were working on a nuclear weapons project. General Groves noted in his memoirs that "We made certain that each member of the project thoroughly understood his part in the total effort; that, and nothing more."
Initially six reactors or "piles" were proposed, when the plutonium was to be used in the gun-type Thin Man bomb. In mid-1944 a simple gun-type bomb was found to be impractical for plutonium, and the more advanced Fat Man bomb, an implosion device, required less plutonium. The number of piles was reduced to four and then three; and the number of chemical separation plants from four to three.

Technological innovations

In the short time frame of the Manhattan Project, Hanford engineers produced many significant technological advances. As no one had ever built an industrial-scale nuclear reactor before, scientists were unsure how much heat would be generated by fission during normal operations. Seeking the greatest possible production while maintaining an adequate safety margin, DuPont engineers installed ammonia-based refrigeration systems with the D and F reactors to further chill the river water before its use as reactor coolant.
Another difficulty the engineers struggled with was how to deal with radioactive contamination. Once the canyons began processing irradiated slugs, the machinery would become so radioactive that it would be unsafe for humans ever to come in contact with it. The engineers therefore had to devise methods to allow for the replacement of any component via remote control. They came up with a modular cell concept, which allowed major components to be removed and replaced by an operator sitting in a heavily shielded overhead crane. This method required early practical application of two technologies that later gained widespread use: Teflon, used as a gasket material, and closed-circuit television, used to give the crane operator a better view of the process.

Cold War expansion

In September 1946, the General Electric Company assumed management of the Hanford Works under the supervision of the newly created Atomic Energy Commission. As the Cold War began, the United States faced a new strategic threat in the rise of the Soviet nuclear weapons program. In August 1947, the Hanford Works announced funding for the construction of two new weapons reactors and research to develop a new chemical separations process, entering a new phase of expansion.
By 1963, the Hanford Site was home to nine nuclear reactors along the Columbia River, five reprocessing plants on the central plateau, and more than 900 support buildings and radiological laboratories around the site. Extensive modifications and upgrades were made to the original three World War II reactors, and a total of 177 underground waste tanks were built. Hanford was at its peak production from 1956 to 1965. Over the entire 40 years of operations, the site produced about of plutonium, supplying the majority of the 60,000 weapons in the U.S. arsenal. Uranium-233 was also produced.
In 1976, a Hanford technician named Harold McCluskey received the largest recorded dose of americium following a laboratory accident. Due to prompt medical intervention, he survived the incident and died eleven years later of natural causes.

Decommissioning

Most of the reactors were shut down between 1964 and 1971, with an average individual life span of 22 years. The last reactor, N Reactor, continued to operate as a dual-purpose reactor, being both a power reactor used to feed the civilian electrical grid via the Washington Public Power Supply System and a plutonium production reactor for nuclear weapons. N Reactor operated until 1987. Since then, most of the Hanford reactors have been entombed to allow the radioactive materials to decay, and the surrounding structures have been removed and buried. The B-Reactor has not been cocooned and is accessible to the public on occasional guided tours. It was listed on the National Register of Historic Places in 1992,
and some historians advocated converting it into a museum. B reactor was designated a National Historic Landmark by the National Park Service on August 19, 2008.
Reactor nameStart-up dateShutdown dateInitial power
Final power
Interim safe storage status
B ReactorSep 1944Feb 19682502210Not cocooned, hazards mitigation authorized 2001
D ReactorDec 1944Jun 196725021652004
F ReactorFeb 1945Jun 196525020402003
H ReactorOct 1949Apr 196540021402005
DR ReactorOct 1950Dec 196425020152002
C ReactorNov 1952Apr 196965025001998
KW ReactorJan 1955Feb 197018004400Preliminary plans, January 30, 2018
KE ReactorApr 1955Jan 197118004400Preliminary plans, January 30, 2018
N ReactorDec 1963Jan 1987400040002012

Later operations

The United States Department of Energy assumed control of the Hanford Site in 1977. Although uranium enrichment and plutonium breeding were slowly phased out, the nuclear legacy left an indelible mark on the Tri-Cities. Since World War II, the area had developed from a small farming community to a booming "Atomic Frontier" to a powerhouse of the nuclear-industrial complex. Decades of federal investment created a community of highly skilled scientists and engineers. As a result of this concentration of specialized skills, the Hanford Site was able to diversify its operations to include scientific research, test facilities, and commercial nuclear power production.
, operational facilities located at the Hanford Site included:
The Department of Energy and its contractors offer tours of the site. The tours are free, can be reserved in advance via the department's web site, and are limited to U.S. citizens at least 18 years of age. Between 2009 and 2018, approximately 80,000 people visited the site, bringing an estimated annual tourist income of two million dollars to the surrounding area.

Tunnel collapse

On the morning of May 9, 2017, a section of a tunnel caved in. It was used to store contaminated materials and was located next to the Plutonium Uranium Extraction Facility in the 200 East Area in the center of the Hanford Site. All non-essential personnel were placed under a take cover alarm on the site. Some 53 truckloads of soil were used to fill in the hole.

Environmental concerns

A huge volume of water from the Columbia River was required to dissipate the heat produced by Hanford's nuclear reactors.
As much as 75,000 gallons per minute was diverted from the Columbia River to cool the reactor.
From 1944 to 1971, pump systems drew cooling water from the river and, after treating this water for use by the reactors, returned it to the river. Before its release into the river, the used water was held in large tanks known as retention basins for up to six hours. Longer-lived isotopes were not affected by this retention, and several terabecquerels entered the river every day. The federal government kept knowledge about these radioactive releases secret. Radiation was later measured downstream as far west as the Washington and Oregon coasts.
The plutonium separation process resulted in the release of radioactive isotopes into the air, which were carried by the wind throughout southeastern Washington and into parts of Idaho, Montana, Oregon, and British Columbia. Downwinders were exposed to radionuclides, particularly iodine-131, with the heaviest releases during the period from 1945 to 1951. These radionuclides entered the food chain via dairy cows grazing on contaminated fields; hazardous fallout was ingested by communities who consumed radioactive food and milk. Most of these airborne releases were a part of Hanford's routine operations, while a few of the larger releases occurred in isolated incidents. In 1949, an intentional release known as the "Green Run" released 8,000 Curies of iodine-131 over two days. Another source of contaminated food came from Columbia River fish, an impact felt disproportionately by Native American communities who depended on the river for their customary diets. A U.S. government report released in 1992 estimated that 685,000 curies of radioactive iodine-131 had been released into the river and air from the Hanford site between 1944 and 1947.
spawning in the Hanford Reach near the H-Reactor
Beginning in the 1960s, scientists with the U.S. Public Health Service published reports about radioactivity released from Hanford, and there were protests from the health departments of Oregon and Washington. In response to an article in the Spokane Spokesman Review in September 1985, the Department of Energy announced to declassify environmental records and, in February 1986, released 19,000 pages of previously unavailable historical documents about Hanford's operations. The Washington State Department of Health collaborated with the citizen-led Hanford Health Information Network to publicize data about the health effects of Hanford's operations. HHIN reports concluded that residents who lived downwind from Hanford or who used the Columbia River downstream were exposed to elevated doses of radiation that placed them at increased risk for various cancers and other diseases, particularly forms of Thyroid disease. A mass tort lawsuit brought by two thousand Hanford downwinders against the federal government spent many years in the court system. In 2005, two of six plaintiffs who went to trial were awarded $500,000 in damages.
In October 2015, the Department of Energy resolved the final cases. They paid more than $60 million in legal fees and $7 million in damages.
Since 2003, radioactive materials are known to be leaking from Hanford into the environment: "The highest tritium concentration detected in riverbank springs during 2002 was 58,000 pCi/L at the Hanford Townsite. The highest iodine-129 concentration of 0.19 pCi/L was also found in a Hanford Townsite spring. The WHO guidelines for radionuclides in drinking-water limits levels of iodine-129 at 1 Bq/L, and tritium at 10,000 Bq/L. Concentrations of radionuclides including tritium, technetium-99, and iodine-129 in riverbank springs near the Hanford Townsite have generally been increasing since 1994. This is an area where a major groundwater plume from the 200 East Area intercepts the river ... Detected radionuclides include strontium-90, technetium-99, iodine-129, uranium-234, −235, and −238, and tritium. Other detected contaminants include arsenic, chromium, chloride, fluoride, nitrate, and sulfate."
In February 2013, Governor Jay Inslee announced that a tank storing radioactive waste at the site had been leaking liquids on average of 150 to 300 gallons per year. He said that though the leak posed no immediate health risk to the public, it should not be an excuse for not doing anything. On February 22, 2013, the Governor stated that "6 more tanks at Hanford site" were "leaking radioactive waste"
, there are 177 tanks at Hanford, 149 of which have a single shell. Historically single shell tanks were used for storing radioactive liquid waste and designed to last 20 years. By 2005, some liquid waste was transferred from single shell tanks to double shell tanks. A substantial amount of residue remains in the older single shell tanks with one containing an estimated 447,000 gallons of radioactive sludge, for example. It is believed that up to six of these "empty" tanks are leaking. Two tanks are reportedly leaking at a rate of 300 gallons per year each, while the remaining four tanks are leaking at a rate of 15 gallons per year each.

Occupational health concerns

Since 1987, workers have reported exposure to harmful vapors after working around underground nuclear storage tanks, with no solution found. More than 40 workers in 2014 alone reported smelling vapors and became ill with "nosebleeds, headaches, watery eyes, burning skin, contact dermatitis, increased heart rate, difficulty breathing, coughing, sore throats, expectorating, dizziness and nausea, ... Several of these workers have long-term disabilities." Doctors checked workers and cleared them to return to work. Monitors worn by tank workers have found no samples with chemicals close to the federal limit for occupational exposure.
In August 2014, OSHA ordered the facility to rehire a contractor and pay $220,000 in back wages for firing the employee for whistleblowing on safety concerns at the site.
On November 19, 2014, Washington Attorney General Bob Ferguson said the state planned to sue the DOE and its contractor to protect workers from hazardous vapors at Hanford. A 2014 report by the DOE Savannah River National Laboratory initiated by 'Washington River Protection Solutions' found that DOE's methods to study vapor releases were inadequate, particularly, that they did not account for short but intense vapor releases. They recommended "proactively sampling the air inside tanks to determine its chemical makeup; accelerating new practices to prevent worker exposures; and modifying medical evaluations to reflect how workers are exposed to vapors".

Cleanup under superfund

On June 25, 1988, the Hanford site was divided into four areas and proposed for inclusion on the National Priorities List. On May 15, 1989, the Washington Department of Ecology, the United States Environmental Protection Agency, and the Department of Energy entered into the Tri-Party Agreement, which provides a legal framework for environmental remediation at Hanford. the agencies are engaged in the world's largest environmental cleanup, with many challenges to be resolved in the face of overlapping technical, political, regulatory, and cultural interests. The cleanup effort is focused on three outcomes: restoring the Columbia River corridor for other uses, converting the central plateau to long-term waste treatment and storage, and preparing for the future. The cleanup effort is managed by the Department of Energy under the oversight of the two regulatory agencies. A citizen-led Hanford Advisory Board provides recommendations from community stakeholders, including local and state governments, regional environmental organizations, business interests, and Native American tribes. Citing the 2014 Hanford Lifecycle Scope Schedule and Cost report, the 2014 estimated cost of the remaining Hanford clean up is $113.6 billion – more than $3 billion per year for the next six years, with a lower cost projection of approximately $2 billion per year until 2046. About 11,000 workers are on site to consolidate, clean up, and mitigate waste, contaminated buildings, and contaminated soil. Originally scheduled to be complete within thirty years, the cleanup was less than half finished by 2008. Of the four areas that were formally listed as Superfund sites on October 4, 1989, only one has been removed from the list following cleanup.
While major releases of radioactive material ended with the reactor shutdown in the 1970s and many of the most dangerous wastes are contained, there are continued concerns about contaminated groundwater headed toward the Columbia River and about workers' health and safety.
The most significant challenge at Hanford is stabilizing the of high-level radioactive waste stored in 177 underground tanks. By 1998, about a third of these tanks had leaked waste into the soil and groundwater., most of the liquid waste had been transferred to more secure double-shelled tanks; however, of liquid waste, together with of salt cake and sludge, remains in the single-shelled tanks. DOE lacks information about the extent to which the 27 double-shell tanks may be susceptible to corrosion. Without determining the extent to which the factors that contributed to the leak in AY-102 were similar to the other 27 double-shell tanks, DOE cannot be sure how long its double-shell tanks can safely store waste. That waste was originally scheduled to be removed by 2018., the revised deadline was 2040. Nearby aquifers contain an estimated of contaminated groundwater as a result of the leaks., of radioactive waste is traveling through the groundwater toward the Columbia River. This waste is expected to reach the river in 12 to 50 years if cleanup does not proceed on schedule. The site includes of solid radioactive waste.

Under the Tri-Party Agreement, lower-level hazardous wastes are buried in huge lined pits that will be sealed and monitored with sophisticated instruments for many years. Disposal of plutonium and other high-level wastes is a more difficult problem that continues to be a subject of intense debate. As an example, plutonium-239 has a half-life of 24,100 years, and a decay of ten half-lives is required before a sample is considered to cease its radioactivity. In 2000, the Department of Energy awarded a $4.3 billion contract to Bechtel, a San Francisco-based construction and engineering firm, to build a vitrification plant to combine the dangerous wastes with glass to render them stable. Construction began in 2002. The plant was originally scheduled to be operational by 2011, with vitrification completed by 2028. According to a 2012 study by the General Accounting Office, there were a number of serious unresolved technical and managerial problems. estimated costs were $13.4 billion with commencement of operations estimated to be in 2022 and about 3 decades of operation.
In May 2007, state and federal officials began closed-door negotiations about the possibility of extending legal cleanup deadlines for waste vitrification in exchange for shifting the focus of the cleanup to urgent priorities, such as groundwater remediation. Those talks stalled in October 2007. In early 2008, a $600 million cut to the Hanford cleanup budget was proposed. Washington state officials expressed concern about the budget cuts, as well as missed deadlines and recent safety lapses at the site, and threatened to file a lawsuit alleging that the Department of Energy was in violation of environmental laws. They appeared to step back from that threat in April 2008 after another meeting of federal and state officials resulted in progress toward a tentative agreement.
During excavations from 2004 to 2007 a sample of purified plutonium was uncovered inside a safe in a waste trench, and has been dated to about the 1940s, making it the second-oldest sample of purified plutonium known to exist. Analyses published in 2009 concluded that the sample originated at Oak Ridge, and was one of several sent to Hanford for optimization tests of the T-Plant until Hanford could produce its own plutonium. Documents refer to such a sample, belonging to "Watt's group", which was disposed of in its safe when a radiation leak was suspected.
Some of the radioactive waste at Hanford was supposed to be stored in the planned Yucca Mountain nuclear waste repository, but after that project was suspended, Washington State sued, joined by South Carolina. Their first suit was dismissed in July 2011. In a subsequent suit, federal authorities were ordered to either approve or reject plans for the Yucca Mountain storage site.
A potential radioactive leak was reported in 2013; the clean up was estimated to have cost $40 billion with $115 billion more required.

Hanford organizations

The Hanford site operations were initially directed by Colonel Franklin Matthias of the U.S. Army Corps of Engineers. Postwar the Atomic Energy Commission took over, and then the Energy Research and Development Administration. Since 1977, Hanford operations are directed by the U.S. Department of Energy. It has been operated under government contract by various private companies over the years, as summarized in the table through 2000.
Year begunMonthOrganizationResponsibilityRemarks
1942December 12U.S. Army Corps of EngineersLead U.S. Government entityHeld role until January 1, 1947
1942December 12E.I. DuPont de Nemours & Company All site activitiesInitial Hanford site contractor
1946September 1General Electric Company All site activitiesReplaced DuPont
1947January 1Atomic Energy CommissionLead U.S. Government entityReplaced U.S. Army Corps of Engineers
1953May 15Vitro EngineersHanford Engineering ServicesAssumed GEs new facility design role
1953June 1J.A. Jones ConstructionHanford Construction ServicesAssumed GEs construction role
1965January 1U.S. TestingEnvironmental & bioassay testingAssumed GEs environmental and bioassay testing role
1965January 4Battelle Memorial InstitutePacific Northwest Laboratory Assumed GE's laboratory operations – subsequently renamed Pacific Northwest National Laboratory
1965July 1Computer Sciences Corporation Computer servicesNew scope
1965August 1Hanford Occupational Health FoundationIndustrial MedicineAssumed GE's industrial medicine role
1965September 10Douglas United NuclearSingle pass reactor operations & fuel fabricationAssumed part of GE's reactor operations
1966January 1IsochemChemical processingAssumed GE's chemical processing operations
1966March 1ITT Federal Support Services, Inc.Support servicesAssumed
1967July 1Douglas United NuclearN Reactor operationAssumed remainder of GE's reactor operations
1967September 4Atlantic Richfield Hanford CompanyChemical ProcessingReplaced Isochem
1967August 8Hanford Environmental Health FoundationIndustrial MedicineName change only
1970February 1Westinghouse Hanford CompanyHanford Engineering Development LaboratorySpun off from PNL with mission to build the Fast Flux Test Facility
1971SeptemberARHCOSupport ServicesReplaces ITT/PSS
1973AprilUnited Nuclear Industries, Inc.All production reactor operationsName change from Douglas United Nuclear only
1975January 1Energy Research and Development Administration Lead U.S. Government entityReplaced AEC – managed site until October 1, 1977
1975October 1Boeing Computer Services Computer servicesReplaced CSC
1977October 1U.S. Department of Energy Lead U.S. Government AgencyReplaced ERDA – manages site presently
1977October 1Rockwell Hanford Operations Chemical Processing & Support ServicesReplaces ARCHO
1981JuneBraun Hanford Company Architect & Engineering ServicesReplaces Vitro
1982MarchKaiser Engineering Hanford Architect & Engineering ServicesReplaces BHC
1987March 1KEHConstructionConsolidated contract includes former J.A. Jones work
1987June 29WHCSite management & operationsConsolidated contract includes former RHO, UNC & KEH work.
1996October 1Fluor Daniel Hanford, Inc. Site management & operationsFDH is integrating contractor with 13 subcontracted companies
2000February 7Fluor HanfordSite cleanup operationsTransition to site cleanup
2000December 11Bechtel National, Inc.Engineering, construction, and commissioning of the Waste Treatment Plant
2008October 1Ch2M Hill Plateau Remediation CompanyCentral plateau cleanup and closure
2009April 8Washington Closure HanfordRiver corridor cleanup and closure
2009May 26Mission Support AllianceSite infrastructure and servicesConsolidated services contract
2009October 1Washington River Protection SolutionsTank Farm operations