The freight bypass line was taken into operation in May and July 1909. During World War II, passenger services were often diverted over the freight bypass line. With the building of the Empelde connecting curve in 1973, a direct connection was created from the Seelze marshalling yard to the Hanover–Altenbeken line. Previously freight trains to and from the Altenbeken line partly used the Bad Münder–Bad Nenndorf railway, which was subsequently abandoned in stages. The most recent major development of the line was the reconstruction of the approaches from the east of Lehrte station in 2008 to enable the grade-separated entry and exit of freight trains to and from Wolfsburg, Brunswick and Hildesheim. In 2012, the old steel girder bridge over the Ihme east of the Hannover-Linden/Fischerhof station was replaced by a reinforced concrete bridge. It collapsed on the night of 1/2 December 2012 when the supporting structure was being inserted. The bridge structure was damaged. However, the completion of the bridge was only slightly delayed and it was completed in December.
Operations
The freight bypass railway is one of the main double-track railways in Germany. Due to the line being largely shared by traffic running north–south between seaports and the hinterland and traffic running east–west, trains run virtually continuously. The fact that lines running parallel with it have been dismantled or are not electrified, mean that there is such a strong concentration of traffic that minor events on the line can lead to traffic jams. Trains running between the access routes from Hamburg via Celle and Verden and the exits via Hamelin and Altenbeken and on the North–South railway or in the opposite direction can use the line. The line is also used by passenger trains when they are diverted over the line during construction work on other lines. The line is also used by scheduled passenger trains that do not stop in Hannover Hauptbahnhof, such as the ICE Sprinter service on the Berlin–Frankfurt–South Germany route. Also trains runs to Hannover Messe/Laatzen station for the Hanover Fair several times a year over the line.
Infrastructure
The line consists almost entirely of an embankment with bridges crossing over a large number of bridges across watercourses, roads and railways between Ahlem and Misburg. Many of the bridges have been extended to allow the widening of routes running under it. Thus, the original bridge spanning two tracks over the line to Göttingen was rebuilt during the construction of the Hanover–Würzburg high-speed railway to allow four tracks to run under it. Before Expo 2000, the bridge was again extended to allow an S-Bahn track to pass under it. In the years since 2000, tracks and points have been replaced with concrete sleepers and 60 kg/m rail.