Heathrow Express


Heathrow Express is an airport rail link between London Heathrow Airport and London Paddington. It is an open-access operator, formed in 1998, and is operated by Heathrow Express Operating Company, a wholly owned subsidiary of Heathrow Airport Holdings.

History

Heathrow Express was planned as a joint venture between BAA and British Rail, but was taken over fully by the former following the privatisation of British Rail. Construction began in 1993. The principal works were two 5-mile single-bore tunnels and underground stations at and Terminal 4. Electrification of the Great Western Main Line between Paddington and Airport Junction, where the new line diverged from the GWML, was also required. A flying junction known as Stockley Flyover was constructed to connect the tunnel to the GWML fast lines. Beginning in January 1998, an interim service called Heathrow FastTrain ran to a temporary station called Heathrow Junction, where a coach took passengers the rest of the way. The full service began on 23 June 1998, with four trains per hour running in each direction, operated using EMUs built by Siemens Mobility.
From 1999 to 2003, a check-in service was provided at Paddington, allowing Heathrow Express passengers to check in and drop off their luggage prior to flights, which was similar to the service currently provided on Hong Kong Airport Express. Checked baggage was transported to the airport by using the luggage space at the westbound first carriage. This service was withdrawn due to low usage and high cost of operation.
In June 2005, Heathrow Express began jointly providing a new Heathrow Connect service, which saw a new twice-hourly stopping service on the same route between Paddington and Heathrow using EMUs from the Siemens Desiro family. Heathrow Airport Holdings had provided the on-board staff through Heathrow Express as part of the contract. This continued until May 2018, which saw Heathrow Connect absorbed into TfL Rail ahead of the new Crossrail project, which will see Crossrail fully operate to Heathrow Airport through this takeover when it opens.
In March 2018, it was announced that Great Western Railway would takeover management of Heathrow Express in August 2018 as part of a new management contract. However, Heathrow Express later on announced that Heathrow Airport Holdings will continue to own the rail link until at least 2028 with GWR instead managing the introduction of the new Class 387 fleet to replace the current Class 332 fleet.

Service

Trains depart Paddington every 15 minutes from 05:10 until 23:25, and there is a similar quarter-hourly service in the return direction. At Paddington they use dedicated platforms 6 and 7, although on occasions other platforms are used. There are two stops at Heathrow: Heathrow Central, serving Terminals 2 and 3 ; and Heathrow Terminal 5, platforms 3 and 4. Until the opening of Terminal 5 on 27 March 2008, Heathrow Express terminated at Heathrow Terminal 4. In 2010, Heathrow Express introduced a dedicated shuttle between Heathrow Central and Terminal 4 that would be timed to connect with the main Heathrow Express service to/from Terminal 5 to improve connections between the terminals.
The service uses Class 332 electric multiple units built by CAF and Siemens Mobility. These incorporate video monitors and the ability to use mobile phones throughout the journey, even in tunnels. The monitors are mostly used for advertising and for news and weather updates produced by BBC World News.
Heathrow Express has been generally well received, not least because steps were taken to reduce the environmental impact, including disguising ventilation shafts as barns. In summer 2013, all units were refurbished inside and out, including new seating configurations, luggage storage and at-seat power.
The operator employs 160 staff, who work both in the airport terminals and on board the trains.

Route

The service runs along Network Rail's Great Western Main Line from Paddington to Airport Junction. The line from Airport Junction to the airport terminals is owned by Heathrow Airport Holdings but maintained by Network Rail. The line is electrified at 25 kV AC overhead and uses Automatic Train Protection. The controlling signalbox for the entire route is the Thames Valley Signalling Centre in Didcot.

Stations

Rolling stock

Current fleet

Future fleet

In 2020, a fleet of twelve Class 387 from the Bombardier Electrostar family will replace the Class 332 fleet. While Heathrow Airport Holdings will continue to operate Heathrow Express with the new fleet, Great Western Railway will be providing and maintaining the new trains. These will feature USB power sockets, extra luggage space, work tables, on-board WiFi and HD TVs. A new Business First cabin will also be included in a 2+1 configuration with reclining seats.

Past fleet

Until May 2018, Heathrow Express leased a singular Class 360 unit which operated the shuttle service between Heathrow Central and Heathrow Terminal 4.