had been carried out at Honister since the late 17th century. But as capacity increased, the site's underground workings were extensively expanded.
19th century
By 1870 Honister's underground workings stretched under Honister Crag with intermediate workings on the opposite side of the valley at Yew Crags. Smaller-scale underground workings on Dubbs Moor, together with a small opencast quarry. Packhorse teams had been used to remove the finished slate on sleds from mines. This involved bringing the loads down steep paths that traversed the cliffs to the top of Honister Pass. Dubbs mine was known for its 'smaller metal', in that smaller pieces of slate were obtainable due to the geology; but this did give rise to some instability. In 1879 the mine's new owners - who also leased and operated other quarries in Borrowdale - installed self-acting inclines to serve both the Honister and Yew Crags mines. Despite the cost to build these feats of engineering, the financial outlay proved correct as they improved efficiency in the mines. For instance the Dubbs Quarry incline allowed slate to be pulled up and then down into the valley to The Hause. Although by mid-1920s, aerial ropeways now served the Honister and Yew Crags Mines, the external Yew Crags incline proved to be so efficient it remained in use until the late 1960s. A petrol-driven narrow-gauge locomotive was used to make the connection between the Hause/slate works and the incline and short aerial ropeway. A bridge carried the railway over the Seatoller-Buttermere road. The bridge was scrapped in the early 1970s. By 1891 production had reached 3,000 tons a year and more than 100 men were employed in the mines.
20th century
The mines reverted to care and maintenance for a while due to labour shortages in First World War. However it did not take long for production to recommence after the cessation of hostilities. By 1926, following a change of management and a new Resident Director, Robin Hoare, the mine's fortunes began to improve with significantly increased production. Considerable modifications were undertaken throughout the quarries, such as the works at The Hause being electrified with two Ruston4-cylinder diesel generators. The 'new' Kimberley Mine was started from the Road End Level, with a substantial long internal electrically powered incline. Work also began to complete a proposal to drive a level through to the Dubbs Quarries. About of level was completed before the project was shelved in favour of further developing the more significant workings under Honister Crag. In 1932, Dubbs Quarry ceased production largely due to the difficulties and slowness of transporting finished slate. Despite an enforced closure from 1943 to 1945 during the Second World War production continued through the 1950s and 1960s although Yew Crag mine closed in 1966 due to difficult roof conditions.
Closure
In 1981, after fifteen years of poor management, all the quarries of the Buttermere & Westmorland Green Slate Co.Ltd. were acquired by B.R. Moore and his father, R.D.Moore. The pair introduced a programme of improvement and a large amount of capital investment was undertaken. This included the installation of rail-borne EIM-Co Rockershovels, battery locomotives, improved rolling stock and increased specialist underground mechanisation and systems. It was the first use of such equipment in any underground Lake District quarry. In 1985 the Moore family sold the company and its quarries to Alfred McAlpine plc which also owned Penrhyn Quarry in Bethesda, North Wales. McAlpine used an earlier planning permission to open a new opencast, on the Honister Vein some from the Hopper Opencast ; which was then infilled with waste from the new workings. In 1989 McAlpine ceased operations at all the quarries. Only care and maintenance was undertaken.
Reopening & resurgence
In 1997 the mine was reopened by local businessman, Mark Weir, who redeveloped the mining side - producing small quantities of roofing slate - and who also turned the site into a tourist attraction. A narrow gauge industrial railway is used to assist in the slate extraction process. Attractions around the mine complex include a visitor centre, underground tours of the workings, and England's first via ferrata, where participants use a safety harness to scale a cliff path. This attraction proved to be very popular and in 2011 was awarded winner of “Best Tourism Experience in The Lake District" by Cumbria Tourism. Using the original Miners track up the steep outer incline of Fleetwith Pike, the via ferrata is both physically and mentally challenging.
Zip wire
Honister Mine featured in the 2011 BBC television programme Tales from the National Park. It followed owner Mark Weir, and his attempt to open a zip wirefrom the top of Fleetwith Pike to the mine below. Weir died in a helicopter crash in March 2011. He had been trying to obtain planning permission for the proposed zip wire. His business was also facing a prosecution on the part of Natural England in respect of damage to plant-life at a Site of Special Scientific Interest. The damage was caused by an unapproved extension which Weir had made to the via ferrata. A 2012 planning application for the zip wire was refused by the Park Authority on the grounds of impact, despite support from explorer and Lake District resident Sir Chris Bonington and notable business and tourism organisations. Permission was granted for the long zip wire in 2018.