Horton-in-Ribblesdale railway station


Horton-in-Ribblesdale railway station is a small station that serves the village of Horton in Ribblesdale, North Yorkshire, England on the Settle–Carlisle Line northwest of. The station is owned by Network Rail and is operated by Northern who provide all passenger train services.

History

The station was completed by the Midland Railway in 1876 and was opened for passengers on 1 May. It was initially named "Horton". The London Midland and Scottish Railway absorbed the Midland Railway on 1 January 1923 and renamed the station as Horton-in-Ribblesdale on 26 September 1927.
The station buildings were designed by the Midland Railway company architect John Holloway Sanders.
The station is currently served and managed by Northern, as are all the trains calling at the station. It is unstaffed, with no ticket vending facilities. The station waiting room is open for public use, having been restored by the Settle & Carlisle Railway Trust in 2002 as part of a wider refurbishment of the main buildings on the eastern side.
It is located near to Pen-y-ghent, one of the mountains known collectively as the Yorkshire Three Peaks. The station and the village of Horton-in-Ribblesdale are at 850 feet above sea level, as stated on the decorative station information board, and are about north of Settle.
In the 1950s and 1960s under stationmaster Taylor, Horton won the "Best Kept Station" award for 17 consecutive years. The station lost its passenger service on 4 May 1970, but reopened in July 1986, along with several other local stations on the line under British Rail. Goods traffic was handled at the station until 1964, with sidings at the southern end serving the nearby Horton Quarry continuing in use until the early 1980s. These were removed after the station signal box was decommissioned in 1986, but plans to reinstate them are currently under consideration.

Facilities

As the station does not have a footbridge, the platforms are linked by a foot crossing. Both platforms are lower than standard ; there is no step-free access. Train running information is available via telephone and timetable posters, with digital PIS displays also now available following a rolling upgrade programme of station facilities by operator Northern.
The station is also to receive a new footbridge in the coming year, thanks to a £1.9 million scheme funded jointly by Network Rail and the government. This will see a fully accessible footbridge installed to replace the current barrow crossing. The bridge will also allow a scheme to relay the former quarry sidings to proceed.

Service

There are about one train every two hours in each direction: southbound to Leeds and northbound to Carlisle. The total is slightly unbalanced as some trains do not stop here. There is an extra train to Leeds on Saturdays, whilst there are five trains a day to both Leeds and Carlisle on Sundays.