I-ME-WE


I-ME-WE is a submarine communications cable system between India and France. The design capacity is 3.84 Terabits per second. It has been operational since 2009 with Tripoli, Lebanon being connected in November 2011. Internet Service Providers and Network Operators hope to utilize the additional bandwidth to support high-bandwidth peer-to-peer IP-based broadband services such as multimedia streaming, broadband Internet and voice/video telephony.
The cable system includes a terrestrial link connecting the cities of Alexandria and Suez in Egypt. The I-ME-WE cable system comprises three optical fiber cable pairs and 2 trunk lines. It has cable landing stations at:
The cable system was funded by a consortium of 9 companies from across the world:
The contract for the construction and maintenance of the cable system has been awarded to Alcatel-Lucent.
Also, this network system extension is contracted to Mitsubishi Electric.