The IBM 473L Command and Control System was a USAF Cold War "Big L" Support System with computer equipment at The Pentagon and, in Pennsylvania, the Alternate National Military Command Center nuclear bunker. Each 473L site included a Data Processing Subsystem, Integrated Console Subsystem, Large Panel Display Subsystem, and Data Communications Subsystem. The "System 473L" was an "on-line, real-time information processing system designed to facilitate effective management of USAF resources, particularly during emergency situations" e.g., for: "situation monitoring, resource monitoring, plan evaluation, plan generation and modification, and operations monitoring". In 1967, the 473L System was used during the "HIGH HEELS 67" exercise "to test the whole spectrum of command in a strategic crisis".
Background
In early 1952, the Pentagon's USAF Command Post "arranged" to receive Air Defense Command exercise data such as for planned mock attacks into defense sectors by faker aircraft An Experimental SAGE Subsector" for testing a Semi Automatic Ground Environment was created using a July 1955 prototype air defense computer ADC's 1955 command post blockhouse was completed at Ent AFB, and "in September 1955, the Air Force…replace command post's outmoded telephone system with a modern switchboard with 100 long-distance lines and room for more, so that 20 people in various parts of the country could hold as many as four conferences at a time". The Alternate Joint Communication Center in the Raven Rock nuclear bunker was equipped by the end of 1955, and ADC broke ground in 1957 for deploying the Burroughs 416L SAGE Air Defense System After President Dwight D. Eisenhower expressed concern about nuclear command and control, a "1958 reorganization in NCA relations with the joint commands" was implemented, and the "AWCS 512L" system was deployed by June 1958. The GOR for a computerized 465L SAC Automated Command and Control System was issued in 1958 for Strategic Air Command's nuclear bunkers. A Joint War Room was activated at the Pentagon in 1960 and in December 1960, the AFCP reverted to a USAF-only mission when its "joint and national responsibilities" ended. After a "Quick Fix" program completed in the fall of 1960 and NORAD's Alert Network Number 1 was providing data from the Ent AFB command post in Colorado Springs, the AFCP had several rear projection screens, DEFCON status boards, and a display with colored regional blocks for the Bomb Alarm System In January 1962, the Deep Underground Command Center was planned as a nuclear bunker beneath the Pentagon The Air Force Command Post Systems Division was activated in 1960 for handling AFCP equipment issues and in October 1962, DoD Directive S-5100.30 "designated 473L as the “Air Force service headquarters subsystem” of the Worldwide Military Command and Control System established the same month."
OTC phase
The "Operational and Training Capability" phase by IBM Federal Systems was the first stage of development for the 473 program. Each "Computer Communication Console" by TRW Space Technology Laboratories for OTC was part of the "DC400B/DIB display and interrogation system" that had 2 "10-inch CRT displays together with a sophisticated keyboard" This "temporary 473L system" had an IBM 1401 computer and IBM 1405 Disk Storage Unit. On January 1, 1963, ESD's 473L System Program Office was expanded with the added 492L responsibility for developing the United States Strike Command's .
OUR phase
As an upgrade before the IOC phase, an IBM 1410 was leased in February 1964, and the IBM 1401 computer was phased out by April—revision of OTC software for the 1410 computer was by Project OUR.
IOC phase
The Librascope AN/FYQ-11 Data Processor Set was "a configuration of the L-3055" computer that Librascope manufactured at Glendale procured for the Initial Operational Capability phase with limited FYQ-11 equipment. and only "4 integrated consoles". FYQ-11 had been accepted by the USAF Electronic Systems Division in late March 1965 to replace the IBM 1410. The FYQ-11 had been proposed on February 19, 1962, for the Complete Operational Capability COC programs planned for the L-3055 included the "Deployment Monitor", "ACE-Tactical", and "ACE-Transport" After FYQ-11 problems, the USAF Chief of Staff in 1966 cancelled the AN/FYQ-11 and the Comptroller was directed to dispose of "the L-3055 system's equipment"
Complete operational capability
A second IBM 1410 computer was installed by December 15, 1966, and the entire 473L System included: ;AN/FYA-2 Integrated Data Transfer Console: The AN/FYA-2 provided the fully equipped 473L operator environment—cf. AN/FYA-3 didn't have a Hard Copy Device for the Multicolored Display, nor a Console Printer ; while the AN/FYA-4 only had an Electronic Typewriter/Display and CP. The console was run by a Monitor Program in the DPSS, and "operational capabilities exercised via operational capability overlays; that is, via plastic masks fitting over the logic keyboard portion of the operator console." The original COC plan was for DPSS output for 11 MCs and 15 CPs. ;Query Language : Query Language was "very similar to the COLINGO query language and was "a constrained English language…for man-machine communication in System 473L. …to retrieve data from any file in the system or to perform certain other functions." For example, the code for airfields both within Brazil and within a 2000-mile great-circle distance of Brazilia is: ;Large Panel Display Subsystem: IT&T was awarded the May 1965 contract for the large 473L display which was to present information in both black and white and in color. In 1971 an Iconorama was still being used by "NORAD at the Air Force System 473L".