ICE 2


The ICE 2 is the second series of German high-speed trains and one of six in the Intercity-Express family since 1995.
The ICE 2 trains are even closer to a conventional push–pull train than the ICE 1, because each train consists of only one locomotive, six passenger cars and a cab car.

Differences to ICE 1

Except for the automatic Scharfenberg coupling, ICE 2 powerheads are very similar to those of the ICE 1 and can actually be used in ICE 1 trains if the necessity arises.

Half-trains

Usually two ICE 2 half-trains are coupled to form a block train of similar dimensions to the original ICE 1 for serving the main routes, and separated again to operate on routes with less traffic or to provide the passengers two different destinations.
Until the class 808 cab cars have been tested and cleared for passenger service, two ICE 2 half-trains had been solidly coupled to form a permanent block train.

Cars

The passenger cars are very different from the ICE 1 cars, despite their similar exterior: The weight has been significantly reduced and the passenger compartments have been removed in favor of a seating arrangement similar to an airliner. Also, the train has been equipped with air suspension to circumvent the wheel noise problems of the ICE 1, which led to the installation of rubber-buffered wheel rims on the ICE 1 units and therefore the Eschede train disaster.
ICE 2 trains have no service car as the class 803 on ICE 1 trains, on the other hand the class 808 cab car is unique to the ICE 2.

Service

ICE 2 trains usually run on the main east–west line, starting in Berlin with two unit block train. In Hamm the train is separated into two half-trains.
One half-train goes through the Ruhr area to Cologne/Bonn Airport station, while the other half-train continues through Wuppertal and Cologne to Bonn. In the opposite direction, both half-trains are coupled again at Hamm.
Some trains also serve the Munich—Hanover line with halves continuing to Hamburg and Bremen respectively.

Eurotrain

Eurotrain was a joint venture formed by Siemens and GEC-Alsthom in 1996 to market high-speed rail technology in Asia. In 1997, it was one of two competitors to supply the core system of Taiwan High Speed Rail, and was awarded the status of preferred bidder by concessionaire THSRC.
In early 1998, the two companies created a demonstration train by combining cars of three existing French and German high-speed trains: ICE 2 powerheads 402 042 and 402 046, were joined at both ends to the articulated double-deck intermediate cars of TGV Duplex trainset #224. On 4 May 1998, the Eurotrain demonstration train made a presentation run on the Hanover–Würzburg high-speed railway in Germany, achieving a maximum speed of 316 km/h.
In December 2000, THSRC decided to award the contract to the rival Taiwan Shinkansen Consortium, leading to a legal battle ending in damage payments for Eurotrain in 2004.

Upgrading of Electrical Traction Equipment

On September 25, 2014, Mitsubishi Electric Corp. of Japan announced that it had received a contract from DB to supply new IGBT power modules to replace the old GTO power modules in the drives of 46 ICE 2 trainsets. Mitsubishi said that the modern smaller and lighter IGBT power modules will reduce power consumption and extend the life of the ICE 2 trains. The contract for $22 million is expected to be completed by 2019.

Future

DB will replace the ICE 2 trains with the future ICE 4 trains.